Abstract: Aspects of the disclosure provide a method for radio resource management (RRM) measurement. A measurement configuration can be received at a user equipment (UE) from a base station (BS) in a beam-formed system. The measurement configuration indicates a measurement of a neighbor cell to be performed based on a synchronization signal block (SS block) timing relationship between the neighbor cell and a known cell. The known cell is a serving cell of the UE, or a second neighbor cell of the UE. Beam measurement results of the neighbor cell are reported using SS block indexes of the known cell.
Abstract: A graphics processing unit (GPU) is provided to preemptively flush one or more bins. The GPU generates bin data of a display area according to an association of primitive data with the bins that correspond to the display area. Upon detecting an adaptive condition, a signal is generated to indicate that one or more bins of a first frame are to be flushed in a first order before the first frame is fully binned. The signal interrupts bin flush of a second frame in a second order in order to flush the one or more bins of the first frame in the first order. After the one or more bins of the first frame are flushed, the bin flush of the second frame is resumed in the second order.