Abstract: smart power distribution system and a method to progressively dispatch the power is described. The method steps are all automatic and self-adaptive. The method can be executed in an unattended manner to automatically correlate real time data vs. historical data, planning data vs. operation data. Based on a long cycle periodical variation and short-term random variations in load, and taking into account the temporary load power supply and maintenance needs, a multi-stage progressive multiple time scales optimal dispatching method is developed, including the distributed power, micro-grids, energy storage devices, electric vehicles charge-discharge facility and other elements of the Intelligent power distribution systems, to achieve coordinated operation of the network, power, load resources to ensure a continuous safe and reliable smart power distribution system operated at high quality and efficiency.
Type:
Grant
Filed:
June 10, 2014
Date of Patent:
February 13, 2018
Assignees:
JIANGSU ELECTRIC POWER COMPANY NANJING POWER SUPPLY COMPANY, STATE GRID CORPORATION OF CHINA, HOHAI UNIVERSITY, JIANGSU ELECTRIC POWER COMPANY, NANJINGHEHAI TECHNOLOGY LIMITED COMPANY, CHINA ELECTRIC POWER RESEARCH INSTITUTE
Inventors:
Kun Yu, Peifeng Shen, Xingying Chen, Tingji Chen, Kai Chen, Hong Zhu, Lei Wei, Jing Xiao, Chunning Wang, Jianguo Yao, Yingchen Liao, Min Cai