Abstract: A combined cycle power generation plant can include at least one gas turbine and at least one steam turbine. A method for providing Asymmetric Joint Control for Primary Frequency Regulation (PFR) in the combined cycle power generation plant can include the use of the spinning energy existing in the high pressure steam to rapidly supply additional power to the steam turbine for PFR service within the time frame established as a requirement to participate in the PFR service. The PFR control method can be carried out by controlling flow of high pressure steam to a medium pressure steam circuit through a bypass.
Type:
Grant
Filed:
December 22, 2008
Date of Patent:
April 8, 2014
Assignee:
Petrobras Energia S.A.
Inventors:
Benjamin Guzman, Jorge Vugdelija, Julio Aguirre
Abstract: A method for providing Asymmetric Joint Control for Primary Frequency Regulation (PFR) in combined cycle power generation plants, said plant comprising at least one gas turbine and at least one steam turbine is provided. The method may comprise the use of the spinning energy existing in the high pressure steam to rapidly supply additional power to the steam turbine for PFR service when required by the grid, within the time frame established as a requirement to participate in the PFR service,. In some embodiments, PFR control can be carried out jointly in the whole combined cycle plant and the distribution of spinning reserve energy can be asymmetric.
Type:
Application
Filed:
December 22, 2008
Publication date:
November 12, 2009
Applicant:
PETROBRAS ENERGIA S.A.
Inventors:
Benjamin Guzman, Jorge Vugdelija, Julio Aguirre