Abstract: A pile-net flexible cable barrier structure includes a first V-shaped pile, a second V-shaped pile, a left tension pile, a right tension pile, a first flexible cable net disposed between the left tension pile and the first V-shaped pile, a second flexible cable net disposed between the first V-shaped pile and the second V-shaped pile, and a third flexible cable net disposed between the second V-shaped pile and the right tension pile. A second pile body of the first V-shaped pile are disposed parallel to a third pile body of the second V-shaped pile, openings of the first V-shaped pile and the second V-shaped pile face a same side, the left tension pile are disposed parallel to the first pile body of the first V-shaped pile, and the right tension pile are disposed parallel to the fourth pile body of the second V-shaped pile.
Type:
Grant
Filed:
July 18, 2024
Date of Patent:
February 18, 2025
Assignee:
Railway Construction Research Institute, China Academy of Railway Science Group Co., Ltd.
Inventors:
Yufang Zhang, Junli Wan, Kun Yuan, Jian Li, Wenjiao Zhou, Mingchang Hei, Guozhuang Song, Zhongming Yang, Xu Gao, Zhenhua Yin, Jiawei Fan, Bo Liu, Jian Cui
Abstract: A barrier structure for bearing a high-energy impact and construction method thereof are provided. The barrier structure includes a supporting pile array arranged between two opposite mountain slope surfaces. The supporting pile array is arranged in a straight line and includes two or more supporting piles. The two or more supporting piles are fixed at a lower part of a mountain. A barrier net is connected to the two or more supporting piles. The barrier net passes through the supporting pile array and extends to the two opposite mountain slope surfaces. The barrier net is fixed on the two opposite mountain slope surfaces. Pull plates are disposed on the two opposite mountain slope surfaces, and one side of each of the pull plates is fixed to a corresponding slope surface of the two opposite mountain slope surfaces through reverse prestressed anchor cables.
Type:
Grant
Filed:
October 19, 2023
Date of Patent:
May 14, 2024
Assignees:
Railway Construction Research Institute, China Academy of
Railway Science Group Co., Ltd., China Academy of Railway Sciences Group Co.
, Ltd.