Abstract: Foundation footing system for a load-bearing structure comprising a hole in the ground and a post in the hole extending above the hole. A gap present between the sides of the post and the sides of the hole contains a cured, hydrophobic, closed-cell, polyurethane foam to firmly hold the post in place and protect the post from moisture. Alternatively, a foundation footing system for a load-bearing structure comprising a hole in the ground filled with a cured, hydrophobic, closed-cell, polyurethane foam and a post place on and connected to the top of the foam.
Abstract: Foundation footing system for a load-bearing structure comprising a hole in the ground and a post in the hole extending above the hole. A gap present between the sides of the post and the sides of the hole contains a cured, hydrophobic, closed-cell, polyurethane foam to firmly hold the post in place and protect the post from moisture. Alternatively, a foundation footing system for a load-bearing structure comprising a hole in the ground filled with a cured, hydrophobic, closed-cell, polyurethane foam and a post place on and connected to the top of the foam.
Abstract: Foundation footing system for a load-bearing structure comprising a hole in the ground and a post in the hole extending above the hole. A gap present between the sides of the post and the sides of the hole contains a cured, hydrophobic, closed-cell, polyurethane foam to firmly hold the post in place and protect the post from moisture. Alternatively, a foundation footing system for a load-bearing structure comprising a hole in the ground filled with a cured, hydrophobic, closed-cell, polyurethane foam and a post place on and connected to the top of the foam.
Type:
Grant
Filed:
February 3, 2016
Date of Patent:
July 30, 2019
Assignee:
Royal Adhesives & Sealants Canada Ltd.
Inventors:
Scott W. Cowen, Neil Goodman, Alexander Botrie
Abstract: Foundation footing system for a load-bearing structure comprising a hole in the ground and a post in the hole extending above the hole. A gap present between the sides of the post and the sides of the hole contains a cured, hydrophobic, closed-cell, polyurethane foam to firmly hold the post in place and protect the post from moisture. Alternatively, a foundation footing system for a load-bearing structure comprising a hole in the ground filled with a cured, hydrophobic, closed-cell, polyurethane foam and a post place on and connected to the top of the foam.
Abstract: Foundation footing system for a load-bearing structure comprising a hole in the ground and a post in the hole extending above the hole. A gap present between the sides of the post and the sides of the hole contains a cured, hydrophobic, closed-cell, polyurethane foam to firmly hold the post in place and protect the post from moisture. Alternatively, a foundation footing system for a load-bearing structure comprising a hole in the ground filled with a cured, hydrophobic, closed-cell, polyurethane foam and a post place on and connected to the top of the foam.
Abstract: A one-component moisture curing composition expands and cures under ambient conditions without the use of external blowing agents. The one-component moisture cure foam contains (1) a moisture curing polymer, (2) anhydrous molecular sieves that are able to adsorb atmospheric moisture to release adsorbed gases, optionally (3) catalyst compound(s) to accelerate the reaction between atmospheric moisture and the polymer, and optionally (4) other additives such as surfactants, fillers, adhesion promoters, pigments, water scavengers and foamable additives.
Type:
Application
Filed:
October 28, 2013
Publication date:
April 30, 2015
Applicant:
Royal Adhesives & Sealants Canada Ltd.
Inventors:
Alexander Botrie, Yuan Deng, Scott Cowen