Abstract: A tack coat includes a first phase and a second phase. The first phase includes asphalt, and the second phase includes an emulsifier and a rheology modifier. Optionally, the second phase also includes a material insoluble in the water. The pH of the second phase can be between 1-3, 6-8, or 9-13.