Abstract: When production testing a permeable first formation, fluid flowing out from the first formation is subjected to a pressure measurement and a flow rate control. In order to avoid bringing up the fluid flowing out during the production test to a surface position, where the fluid's inherent explosion and fire risk as well as poisonousness would cause substantial problems, a fluid flow path is arranged for fluid transfer between the first formation to be production tested and a second permeable formation. The fluid flow path is preferably constituted by a channel-forming pipe. From this channel, the second permeable formation receives the fluid and keeps it for some time. In the position of use, the apparatus is assigned sealing devices such as annulus packers, which are placed such that fluid flow between the formations is limited to only follow the fluid flow path.
Abstract: When production testing a permeable first formation, fluid flowing out from the first formation is subjected to a pressure measurement and a flow rate control. In order to avoid bringing up the fluid flowing out during the production test to a surface position, where the fluid's inherent explosion and fire risk as well as poisonousness could cause substantial problems, a fluid flow path is arranged for fluid transfer only between the first and second formations. The fluid flow path which, in a suitable apparatus, is constituted by a channel-forming pipe. From this channel, the second permeable formation receives the fluid and keeps it for some time. In the position of use, the apparatus is assigned sealing devices such as annulus packers, which are placed such that fluid flow between the formations is limited to only follow the fluid flow path.