Patents Assigned to STATE GRID ELECTRIC POWER RESEARCH INSTITUTE
-
Publication number: 20240097454Abstract: Disclosed are an emergency control method and system based on source-load-storage regulation and cutback. According to the method, output power of power generating sources is regulated according to a power regulating quantity and a frequency regulation requirement, an output power compensation and output frequency of each power generating source are maintained within permissible ranges, so that a balance between power supply and demand of a power distribution network is maintained; and standby energy-storage power stations are used to make up a power gap, and an external power supply system is used to assist in making up a power deficiency, so that large load disturbance can be handled make up the power gap.Type: ApplicationFiled: July 30, 2021Publication date: March 21, 2024Applicants: NANJING UNIVERSITY OF POASTS AND TELECOMMUNICATIONS, STATE GRID ELECTRIC POWER RESEARCH INSTITUTE CO. LTDInventors: Dong YUE, Chunxia DOU, Zhijun ZHANG, Wenbin YUE, Xiaohua DING, Jianbo LUO, Yanman LI, Kun HUANG, Tao HAN
-
Patent number: 11862982Abstract: A networked control method for primary frequency regulation of a new energy power station based on a source-grid-load-storage networked cloud decision control system platform comprises: determining, according to historical operating data of a new energy power station, primary frequency regulation predictive values of power generation units of the new energy power station; determining, according to the primary frequency regulation predictive values, optimal control sequences of inverters of the power generation units at different times based on a pre-established inverter active power model, wherein the optimal control sequences comprise multiple control quantities of active power of the inverters; marking the optimal control sequences at the different times with time scales, sending the optimal control sequences to executing devices of the power generation units, receiving the optimal control sequences, and determining whether to store or not store the optimal control sequences; and determining the control quaType: GrantFiled: August 2, 2021Date of Patent: January 2, 2024Assignees: NANJING UNIVERSITY OF POSTS AND TELECOMMUNICATIONS, STATE GRID ELECTRIC POWER RESEARCH INSTITUTE CO., LTDInventors: Dong Yue, Chunxia Dou, Zhijun Zhang, Xiaohua Ding, Jianbo Luo, Yanman Li, Kun Huang, Tao Han
-
Publication number: 20230387691Abstract: A multi-timescale voltage regulation method based on source-grid-load-storage multi-terminal collaboration of a power distribution network is disclosed, which comprises: establishing, based on a Petri network, a multi-mode switching control model based on voltage security event trigger to realize effective control of a global voltage; establishing multi-objective optimization taking into account a source-storage-load regulation cost and a network transmission loss to realize collaborative and dynamic control of controllable resources of a source terminal, a load terminal and a storage terminal in each operating mode; and establishing a source-storage-load multi-terminal collaboration-based distributed voltage control model based on voltage security event trigger over a short timescale by taking into account the problems of voltage magnitude being out of limit and voltage leap, and solving online an optimal control sequence of the source terminal, the load terminal and the storage terminal in a receding horizoType: ApplicationFiled: January 5, 2022Publication date: November 30, 2023Applicants: NANJING UNIVERSITY OF POSTS AND TELECOMMUNICATIONS, STATE GRID ELECTRIC POWER RESEARCH INSTITUTE CO. LTDInventors: Dong YUE, Chunxia DOU, Zhijun ZHANG, Xiaohua DING, Jianbo LUO, Yanman LI, Kun HUANG, Tao HAN
-
Publication number: 20230291207Abstract: A networked control method for primary frequency regulation of a new energy power station based on a source-grid-load-storage networked cloud decision control system platform comprises: determining, according to historical operating data of a new energy power station, primary frequency regulation predictive values of power generation units of the new energy power station; determining, according to the primary frequency regulation predictive values, optimal control sequences of inverters of the power generation units at different times based on a pre-established inverter active power model, wherein the optimal control sequences comprise multiple control quantities of active power of the inverters; marking the optimal control sequences at the different times with time scales, sending the optimal control sequences to executing devices of the power generation units, receiving the optimal control sequences, and determining whether to store or not store the optimal control sequences; and determining the control quaType: ApplicationFiled: August 2, 2021Publication date: September 14, 2023Applicants: NANJING UNIVERSITY OF POSTS AND TELECOMMUNICATIONS, STATE GRID ELECTRIC POWER RESEARCH INSTITUTE CO., LTDInventors: Dong YUE, Chunxia DOU, Zhijun ZHANG, Xiaohua DING, Jianbo LUO, Yanman LI, Kun HUANG, Tao HAN
-
Patent number: 9871376Abstract: The invention provides a global optimization and dispatching method based on time scales. The method uses a target value system and a dispatch model. The global optimization and dispatching method takes input from the results from a variety of subtopics. The methods provide adjustment and optimization in accordance with the time scales that are given in the sub goal of each sub topic: long-term, mid-long-term, short-term, ultra short term and real time optimization. Smart distribution grid can improve operational efficiency, integrated application of new elements in the distribution network of distribution energy network, micro grid, energy storage device and non-linear loads. This invention is fully adapted to the smart grid trends, with a good prospective.Type: GrantFiled: June 10, 2014Date of Patent: January 16, 2018Assignees: NIANRI Technology Development Limited Company, State Grid Electric Power Research Institute, JIANGSU ELECTRIC POWER COMPANY, State Grid Corporation of ChinaInventors: Haodong Shen, Peifeng Shen, Tingli Chen, Kai Chen, Yalin Liu, Hong Zhu, Junjing Zhang, Jing Xiao, Hongwei Du, Tao Han, Wenlu Ji, Xing Luo, Wen Lu, Lin Wu, Rina Saqi
-
Patent number: 9360352Abstract: A method for determining a lightning hazard distribution of a power network, includes: deriving a shielding failure lightning hazard distribution of the power network and a back flashover lightning hazard distribution of the power network from the number of ground lightning in each grid and ranges of hazardous currents, and deriving a historical lightning hazard distribution of the power network from a lightning faults database of the power network and the grids; and determining the lightning hazard distribution of the power network by integrating the shielding failure lightning hazard distribution of the power network, the back flashover lightning hazard distribution of the power network and the historical lightning hazard distribution of the power network.Type: GrantFiled: April 7, 2009Date of Patent: June 7, 2016Assignees: Wuhan NARI Limited Company of State Grid Electric Power Research Institute, State Grid Electric Power Research Institute, North China Electric Power Research Institute Co., Ltd.Inventors: Jiahong Chen, Jian Wang, Xuefang Tong, Yaxin Liu, Qin Zhang, Yi Luo, Haitao Wang, Wanxing Feng, Shanqiang Gu, Xiaolan Li
-
Patent number: 9239816Abstract: A method of power system preventive control candidate measures identification self-adaptive to external environment, which is applicable to dynamic identification of stations and power equipment under the effect of calamity, and judgment of preventive control measures that lose or restore control capability, and those for which control range or cost has changed. Automatic online identification of set of preventive control candidate measures includes two tasks: identification of stations and power equipment under the effect of calamity, and adjustment of the space of preventive control measures.Type: GrantFiled: October 17, 2011Date of Patent: January 19, 2016Assignees: JIANGXI ELECTRIC POWER COMPANY, STATE GRID ELECTRIC POWER RESEARCH INSTITUTEInventors: Xuecheng Jin, Haohao Wang, Zhuxiang Yao, Taishan Xu, Genhua Zou, Bijun Li, Jianhua Xiong, Wei Xu, Feng Wen, Huimin Peng
-
Patent number: 8859895Abstract: A method for vertically grounding and leading down form a center of a composite pole tower includes the following steps: extending a ground down-leading wire from a center of a ground wire cross arm which is made of metal and is positioned on top of the pole tower, wherein the ground down-leading wire is vertically leaded down to the earth form the center of the composite pole tower, wherein when an lower portion of the tower body is a metal pipe, the ground down-leading wire is extended from the center of the composite material and is directly connected to the metal pipe. The method utilizes the advantage of the insulating intensity of the wall of the composite pole tower and enhances the insulating intensity of the transmission line on impact of lightning. The ground down-leading wires are prevented from short-circuiting with the tower body of the composite pole tower, so that advantage of the insulating property of the composite material of the pole towers is realized.Type: GrantFiled: May 5, 2010Date of Patent: October 14, 2014Assignee: State Grid Electric Power Research InstituteInventors: Zhusen Sun, Qiang Zhang, Minghua Li, Zhijun Li, Ting Liu, Feng Huo, Min Dai, Kai Liu, Xiong Wu, Dingxie Gu, Peihong Zhou, Ying Lou, Zhenqiang Li, Huiwen He
-
Patent number: 8785768Abstract: A method for vertically grounding and leading down form an outer side of a composite pole tower and pole tower thereof, wherein the method includes the following steps: extending an upper metal cross arm from an extended line of at least one side of a ground wire cross arm, vertically leading down a ground down-leading wire from a distal end of the upper metal cross arm, connecting the ground down-leading wire to the pole tower via a lower metal cross arm at a distance under a lower lead, and grounding the ground down-leading wire along a tower body of the pole tower, wherein when an lower portion of the tower body is a metal pipe, the ground down-leading wire is selectively directly connected to the metal pipe via the lower metal cross arm.Type: GrantFiled: May 5, 2010Date of Patent: July 22, 2014Assignees: Shenzhen Power Supply Burea of Guangdong Power Grid Corp., State Grid Electric Power Research InstituteInventors: Hanming Li, Zhijun Li, Qianhu Wei, Ting Liu, Shicong Deng, Feng Huo, Ming Zhan, Min Dai, Weicai Zhou, Kai Liu, Yuhua Zhang, Xiong Wu, Ning Cao, Dingxie Gu, Peihong Zhou, Huiwen He, Ying Lou, Zhenqiang Li
-
Patent number: 8785769Abstract: A method for vertically grounding and leading down form an inner side of a composite pole tower and pole tower thereof, wherein the method includes the following steps: extending an upper metal cross arm from an extended line of at least one side of a ground wire cross arm which is made of metal, vertically leading down a ground down-leading wire from a distal end of the upper metal cross arm, connecting the ground down-leading wire to the pole tower via a lower metal cross arm at a distance under a lower lead, and grounding the ground down-leading wire along a tower body of the pole tower, wherein when an lower portion of the tower body is a metal pipe, the ground down-leading wire is selectively directly connected to the metal pipe via the lower metal cross arm. The upper metal cross arm and the lower cross arm are able to provide a distance between the ground down-leading wire and the pole tower.Type: GrantFiled: May 14, 2010Date of Patent: July 22, 2014Assignees: Shenzhen Power Supply Burea of Guangdong Power Grid Corp., State Grid Electric Power Research InstituteInventors: Zhijun Li, Hanming Li, Ting Liu, Qianhu Wei, Feng Huo, Ming Zhan, Min Dai, Shicong Deng, Kai Liu, Ning Cao, Xiong Wu, Yuhua Zhang, Dingxie Gu, Weicai Zhou, Peihong Zhou, Zhenqiang Li, Ying Lou, Huiwen He
-
Publication number: 20130246000Abstract: A method of power system preventive control candidate measures identification self-adaptive to external environment, which is applicable to dynamic identification of stations and power equipment under the effect of calamity, and judgment of preventive control measures that lose or restore control capability, and those for which control range or cost has changed. Automatic online identification of set of preventive control candidate measures includes two tasks: identification of stations and power equipment under the effect of calamity, and adjustment of the space of preventive control measures.Type: ApplicationFiled: October 17, 2011Publication date: September 19, 2013Applicants: State Grid Electric Power Research Institute, Jiangxi Electric Power CompanyInventors: Xuecheng Jin, Haohao Wang, Zhuxiang Yao, Taishan Xu, Genhua Zou, Bijun Li, Jianhua Xiong, Wei Xu, Feng Wen, Huimin Peng
-
Publication number: 20120168192Abstract: A method for vertically grounding and leading down form a center of a composite pole tower includes the following steps: extending a ground down-leading wire from a center of a ground wire cross arm which is made of metal and is positioned on top of the pole tower, wherein the ground down-leading wire is vertically leaded down to the earth form the center of the composite pole tower, wherein when an lower portion of the tower body is a metal pipe, the ground down-leading wire is extended from the center of the composite material and is directly connected to the metal pipe. The method utilizes the advantage of the insulating intensity of the wall of the composite pole tower and enhances the insulating intensity of the transmission line on impact of lightning. The ground down-leading wires are prevented from short-circuiting with the tower body of the composite pole tower, so that advantage of the insulating property of the composite material of the pole towers is realized.Type: ApplicationFiled: May 5, 2010Publication date: July 5, 2012Applicant: STATE GRID ELECTRIC POWER RESEARCH INSTITUTEInventors: Zhusen Sun, Qiang Zhang, Minghua Li, Zhijun Li, Ting Liu, Feng Huo, Min Dai, Kai Liu, Xiong Wu, Dingxie Gu, Peihong Zhou, Ying Lou, Zhenqiang Li, Huiwen He
-
Publication number: 20120168193Abstract: A method for vertically grounding and leading down form an outer side of a composite pole tower and pole tower thereof, wherein the method includes the following steps: extending an upper metal cross arm from an extended line of at least one side of a ground wire cross arm, vertically leading down a ground down-leading wire from a distal end of the upper metal cross arm, connecting the ground down-leading wire to the pole tower via a lower metal cross arm at a distance under a lower lead, and grounding the ground down-leading wire along a tower body of the pole tower, wherein when an lower portion of the tower body is a metal pipe, the ground down-leading wire is selectively directly connected to the metal pipe via the lower metal cross arm.Type: ApplicationFiled: May 5, 2010Publication date: July 5, 2012Applicant: STATE GRID ELECTRIC POWER RESEARCH INSTITUTEInventors: Hanming LI, Zhijun LI, Qianhu Wei, Ting Liu, Shicong Deng, Feng Huo, Ming Zhan, Min Dai, Weicai Zhou, Kai Liu, Yuhua Zhang, Xiong Wu, Ning Cao, Dingxie Gu, Peihong Zhou, Huiwen He, Ying Lou, Zhenqiang Li
-
Publication number: 20100286954Abstract: A method for determining a lightning hazard distribution of a power network, includes: deriving a shielding failure lightning hazard distribution of the power network and a back flashover lightning hazard distribution of the power network from the number of ground lightning in each grid and ranges of hazardous currents, and deriving a historical lightning hazard distribution of the power network from a lightning faults database of the power network and the grids; and determining the lightning hazard distribution of the power network by integrating the shielding failure lightning hazard distribution of the power network, the back flashover lightning hazard distribution of the power network and the historical lightning hazard distribution of the power network.Type: ApplicationFiled: April 7, 2009Publication date: November 11, 2010Applicants: WUHAN NARI LIMITED COMPANY OF STATE GRID ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID ELECTRIC POWER RESEARCH INSTITUTE, NORTH CHINA ELECTRIC POWER RESEARCH INSTITUTE CO., LTD.Inventors: Jiahong Chen, Jian Wang, Xuefang Tong, Yaxin Liu, Qin Zhang, Yi Luo, Haitao Wang, Wanxing Feng, Shanqiang Gu, Xiaolan Li
-
Publication number: 20100076707Abstract: A current sensor for measuring the inhomogeneity of potential distribution of an arrester having a metal casing, a protection circuit of sampling resistor, a signal conditioning circuit, a signal acquisition circuit, an electro-optical conversion circuit, and a battery module. The signal acquisition circuit includes MSP430F149 micro controller unit having an A/D converter and a serial port. The current sensor is an active sensor, works in a high floating potential, and has a good real time response, high accuracy, low power consumption, good electromagnetic compatibility, and strong anti-interference capability even under harsh electromagnetic conditions.Type: ApplicationFiled: September 23, 2009Publication date: March 25, 2010Applicant: STATE GRID ELECTRIC POWER RESEARCH INSTITUTEInventors: Baoshan WANG, Xi ZHANG, Lin TANG, Yi XIONG, Zhongqiu ZUO, Jinchao JIA, Li CHEN