Patents Assigned to STATE GRID JIANGSU ELECTRIC POWER CO., LTD.
  • Patent number: 11574759
    Abstract: The present invention discloses a device for evaluating and demagnetizing residual magnetism quantity of a power transformer. A main circuit comprises a switching power supply the two ends of which are respectively connected with a filter capacitor and a resistor in parallel. A forward end of the switching power supply is connected with a main switch in series. A rear end of the main switch is connected with a series branch of a sixth switch and a first resistor, a series branch of a first switch and a second switch, and a series branch of a third switch and a fourth switch are connected in parallel. A driving circuit is respectively connected with driving ends of the main switch, the sixth, first, second, third and fourth switches. A control circuit is connected with the driving circuit for sending an instruction to the driving circuit.
    Type: Grant
    Filed: July 31, 2019
    Date of Patent: February 7, 2023
    Assignees: State Grid Jiangsu Electric Power Co., Ltd. Research Institute, Jiangsu Electric Power Research Institute Corporation Limited, State Grid Jiangsu Electric Power Co., Ltd., Nanjing DNN Technology Co., LTD
    Inventors: Fengbo Tao, Jiansheng Li, Chao Wei, Yang Liu, Xu Wei, Yuncai Lu, Shu Chen, Hairong Wei, Yiming Wu, Xiaoping Yang, Jieqing Deng, Peng Wu, Tianxi Xie, Shengquan Wang, Caibo Liao, Ruibin Li
  • Publication number: 20220361032
    Abstract: A micro-power wireless access method and apparatus for the Internet of things for power transmission and transformation equipment involves a time synchronization process, a traffic channel access process, a control channel configuration information access process, and a control channel burst information access process. In the time synchronization process, an aggregation node determines a delay parameter and other parameters based on a timeslot in which traffic information randomly transmitted by a sensing terminal is located, and the sensing terminal adjusts transmission time of a corresponding frame based on the parameters. The traffic channel access process adopts a mode in which one-way reporting is mainly used, to minimize working time of a sensor. The present disclosure realizes limited two-way communication on a control channel, supports configuration of a sensor cycle, a threshold, and other parameters, and supports a retransmission mechanism on the control channel for important alarm information.
    Type: Application
    Filed: November 3, 2021
    Publication date: November 10, 2022
    Applicants: State Grid Jiangsu Electric Power Co., Ltd. Research Institute, Shanghai Institute of Microsystem and Information Technology, Chinese Academy of Sciences, State Grid Jiangsu Electric Power Co., Ltd., State Grid Corporation of China
    Inventors: Jianhua Qin, Yongling Lu, Hong Liu, Chengbo Hu, Zhen Wang, Chao Yun, Min Zheng, Jun Jia, Guojiang Zhang, Lingling Xu, Fengbo Tao, Qiang Huang, Ziquan Liu, Xueqiong Zhu, Chong Tan
  • Patent number: 11480594
    Abstract: Systems and methods for processing measurement data in an electric power system include acquiring the measurement data by a phasor measurement unit (PMU) coupled to a line of the electric power system, and inputting a plurality of the measurement data within a predetermined time window into a K-nearest neighbor (KNN) for identifying bad data among the plurality of the measurement data, wherein when one of the plurality of measurement data contains a bad datum, the machine learning module sends the bad datum to a denoising autoencoder module for correcting the bad datum, wherein the denoising autoencoder module outputs a corrected part corresponding to the bad datum, and when one of the plurality of measurement data contains no bad datum, the machine learning module bypasses the denoising autoencoder module and outputs the one of the plurality of measurement data as an untouched part.
    Type: Grant
    Filed: November 6, 2020
    Date of Patent: October 25, 2022
    Assignees: Global Energy Interconnection Research Institute Co. Ltd, State Grid Corporation of China Co. Ltd, State Grid Jiangsu Electric Power Co., Ltd., State Grid Shanxi Electric Power Company
    Inventors: Yingzhong Gu, Guanyu Tian, Chunlei Xu, Haiwei Wu, Zhe Yu, Di Shi
  • Patent number: 11444476
    Abstract: A lightning strike probability-based coordinated power control method for an energy storage system and a load adjusts output power of an energy storage system and a regulatable load based on a real-time predicted lightning strike probability. This reduces a correlation between a power grid in a lightning region and an external power grid, minimizes impact of a lightning strike if any on the external power grid, and decreases an economic loss due to the lightning strike in the lightning region. The present disclosure establishes a relationship between the output power of the energy storage system, the regulated power of the regulatable load, and a lightning strike probability in a same region, and then regulates the power of the energy storage system and the regulatable load in real time based on the lightning strike probability.
    Type: Grant
    Filed: March 4, 2022
    Date of Patent: September 13, 2022
    Assignees: STATE GRID JIANGSU ELECTRIC POWER CO., LTD., Wuhan University
    Inventors: Zhijian Wu, Chong Tong, Jian Xu, Tao Wang, Zhihao Fang, Yi Hong, Jinwen Mai, Min Xiang, Jiahuan Feng, Yang Xu, Qi Pan, Dongsheng Jing, Peng Wang, Weiliang Wang, Siyang Liao, Yongling Lu, Dan Wang, Junlin Su
  • Patent number: 11422175
    Abstract: Provided is a live measurement method for three-winding transformer loss based on windowed frequency shift. The method includes: step 1: providing an improved live calculation equation of a three-winding transformer loss; step 2: processing a collected x(t) signal by windowed frequency shift calculation; step 3: solving an amplitude and a phase of the collected x(t) signal via discrete Fourier transform of a frequency shift signal; and step 4: calculating a no-load loss and a load loss of a three-winding transformer.
    Type: Grant
    Filed: October 27, 2020
    Date of Patent: August 23, 2022
    Assignees: STATE GRID JIANGSU ELECTRIC POWER CO., LTD., STATE GRID JIANGSU ELECTRIC POWER CO., LTD. MARKETING CENTER
    Inventors: Qifeng Huang, Xiaoquan Lu, Shihai Yang, Mingming Chen, Zhixin Li, Bo Li, Huiling Su, Xiaodong Cao, Yuqin Chen, Hanmiao Cheng, Tianchang Liu, Yixuan Huang, Kaijie Fang
  • Publication number: 20220232381
    Abstract: An SVM-based secure access method for wireless terminals. Step 1, establish a wireless network security model based on the communication scenarios of the wireless terminal and the wireless base station; establish the channel feature vectors based on the wireless network security model and the frames received by the wireless base station; Step 2, use the pre-trained SVM model to examine the channel feature vectors of the frames, determining whether the frames are legitimate signals; Step 3, determine whether the wireless terminal with at least one frame sent is a legitimate terminal based on whether at least one of the frames sent is a legitimate signal. The frames sent by the wireless terminals that access the wireless base station are examined to effectively determine legitimate terminals by improving the SVM parameter combination optimization method of differential evolution and the differential evolution method with an adaptive improvement of the control parameters.
    Type: Application
    Filed: September 30, 2021
    Publication date: July 21, 2022
    Applicant: State Grid Jiangsu Electric Power Co., Ltd
    Inventors: Hong ZHU, Wendi WANG, Dongxu ZHOU, Lisha GAO, Shaojun LIU, Hao YU, Honghua XU, Zhengyi ZHU, Su PAN, Tianyi LI, Yifan ZHU, Linqing YANG
  • Patent number: 11374404
    Abstract: Disclosed is a low-voltage DC power distribution fast switching device. The device includes a positive output terminal electrically connected to a positive pole of a load, and no less than two switching circuits connected in parallel with each other; the switching circuit includes a positive input terminal electrically connected to a positive pole of common negative power supplies, a supplementary diode cluster composed of no less than one diode connected in series, and a thyristor connected between the positive input terminal and the positive output terminal; the positive input terminal is electrically connected to an anode of the supplementary diode cluster and an anode of the thyristor, and the positive output terminal is electrically connected to a cathode of the complementary diode cluster and a cathode of the thyristor.
    Type: Grant
    Filed: August 26, 2020
    Date of Patent: June 28, 2022
    Assignees: State Grid Jiangsu Electric Power Co., Ltd. Research Institute, State Grid Corporation of China, State Grid Jiangsu Electric Power Co., Ltd., Jiangsu Electric Power Research Institute Co., Ltd.
    Inventors: Yubo Yuan, Tiankui Sun, Jinggang Yang, Xiaodong Yuan, Lei Gao, Mingming Shi, Peng Li, Wei Su, Kun Yang, Xinyao Si, Jianhua Qin, Xin Fang, Xiaolong Xiao, Ruihuang Liu, Chenqing Wang, Jiahao Guo, Yunlong Jiang, Shuyi Zhuang, Qun Li, Jian Liu, Shu Chen
  • Patent number: 11320492
    Abstract: State estimation in an electric power system includes acquiring electrical measurements from the electric power system at a reporting rate of the electrical measurements, processing the electrical measurements into sequence data including positive sequence data, processing positive sequence data by an observable state estimator to generate a plurality of estimated states including a plurality of estimated observable states, parameters of the observable state estimator being updated by a first training module in a first time thread, processing the plurality of estimated states by an unobservable state estimator to generate a plurality of estimated unobservable states, parameters of the unobservable state estimator being updated by a second training module in a second time thread independent of the first time thread, and outputting a plurality of final estimated states generated by concatenating the plurality of estimated observable states and the plurality of estimated unobservable states.
    Type: Grant
    Filed: November 6, 2020
    Date of Patent: May 3, 2022
    Assignees: Global Energy Interconnection Research Institute Co. Ltd, State Grid Coporation of China Co. Ltd, State Grid Jiangsu Electric Power Co., LTD., State Grid ShanXi Electric Power Company
    Inventors: Yingzhong Gu, Guanyu Tian, Chunlei Xu, Qibing Zhang, Ruisheng Diao, Di Shi
  • Patent number: 11294097
    Abstract: A lightning prewarning-based method for active protection against a lightning strike on an important transmission channel includes collecting meteorological element data, and establishing a transmission line-specific lightning strike probability prewarning model; using a maximum probability of a lightning strike prewarning level as a lightning strike prewarning level; performing equivalence calculation on a large-scale regional power system, using a minimum sum of a power loss risk cost and a regulation cost as an optimized objective function, and establishing a power flow transfer optimization model; and comparing a sum of a regulation cost and load power loss risk cost caused after the tie line is disconnected if regulation is performed before a lightning strike, and a load power loss risk cost caused if regulation is not performed, and when the regulation cost is not greater than the load power loss risk cost, performing regulation before the lightning strike.
    Type: Grant
    Filed: November 10, 2021
    Date of Patent: April 5, 2022
    Assignee: STATE GRID JIANGSU ELECTRIC POWER CO., LTD. SUZHOU BRANCH
    Inventors: Chong Tong, Yunfeng Cai, Jian Xu, Jun Wang, Vang Xu, Siyang Liao, Yuetao Wu, Jianlian Zhang, Xia Hua, Liang Wang, Liudi Fu, Bowen Wu
  • Patent number: 11277009
    Abstract: Disclosed are a method and apparatus for smoothing a link-line power of an electrothermal microgrid using a thermal storage heat pump cluster.
    Type: Grant
    Filed: November 26, 2019
    Date of Patent: March 15, 2022
    Assignees: State Grid Jiangsu Electric Power CO., LTD Nanjing Power Supply Company, SHANGHAI JIAO TONG UNIVERSITY, HOHAI UNIVERSITY, STATE GRID JIANGSU ELECTRIC POWER CO., LTD
    Inventors: Yong Zhang, Zhoujun Ma, Ming Zhang, Wentao Huang, Shigang Dai, Yuping Zheng, Nengling Tai, Chunning Wang, Liwei Wang, Honghua Xu, Yiru Chen, Di Ma
  • Patent number: 11233395
    Abstract: Disclosed are a dynamic lightning protection method and system. The method includes detecting lightning in real time and tracking a position of a thunderstorm; and performing dynamic lightning protection and control on an electrical grid according to an electrical grid control strategy before the thunderstorm reaches or affects the electrical grid. Further disclosed is a dynamic lightning protection system.
    Type: Grant
    Filed: July 13, 2018
    Date of Patent: January 25, 2022
    Assignees: STATE GRID JIANGSU ELECTRIC POWER CO., LTD SUZHOU, STATE GRID JIANGSU ELECTRIC POWER CO., LTD, STATE GRID CORPORATION OF CHINA
    Inventors: Chong Tong, Yunfeng Cai, Ziyang Zhang, Qing Wang, Kang Dai, Wei Yin
  • Patent number: 11190007
    Abstract: Disclosed is a fault current controller for a direct current power grid, which includes a primary circuit and a controller. The primary circuit includes an inductor, a filter capacitor, a resistor, an IGBT switch, a diode, a contactor and a Hall current sensor. The inductor, a first resistor and a second contactor are connected in series and are connected to a first contactor in parallel. A first branch including a second resistor and a first diode, a second branch including a third resistor and a second diode, and the inductor are connected in parallel; the filter capacitor, the IGBT switch and the first resistor are connected in parallel. The Hall current sensor is arranged in the series circuit. The controller controls the IGBT switch and the two contactors in the primary circuit to form different on-off combinations.
    Type: Grant
    Filed: October 1, 2020
    Date of Patent: November 30, 2021
    Assignees: STATE GRID JIANGSU ELECTRIC POWER CO., LTD., STATE GRID JIANGSU ELECTRIC POWER CO., LTD. RESEARCH INSTITUTE, STATE GRID CORPORATION OF CHINA, JIANGSU ELECTRIC POWER RESEARCH INSTITUTE CO., LTD.
    Inventors: Chenyu Zhang, Yubo Yuan, Jinggang Yang, Shu Chen, Xiaodong Yuan, Jian Liu, Mingming Shi, Qun Li, Xuefeng Ge, Huiyu Miao, Ruihuang Liu, Yunlong Jiang
  • Patent number: 11044633
    Abstract: Provided is an accurate load shedding system and method based on a power-dedicated wireless network. The system includes: a control master station layer, a control substation layer and a terminal user access layer. The control master station layer includes a control master station apparatus and an optical/E1 conversion device. The control substation layer includes an optical/E1 conversion device, a control substation apparatus and a wireless access device. The terminal user access layer includes a wireless core network, a base station and a control terminal. The wireless access device is connected to the wireless core network through Ethernet. The wireless core network is connected with the base station through an optical fiber. The control terminal is connected to a wireless network of the base station through customer premise equipment (CPE).
    Type: Grant
    Filed: May 10, 2019
    Date of Patent: June 22, 2021
    Assignees: State Grid Jiangsu Electric Power Co., Ltd., Nari Technology Co., Ltd.
    Inventors: Jijun Yin, Qing Chen, Zheng Wu, Xiaofeng Wang, Xiao Lu, Jianyu Luo, Xueming Li, Kaiming Luo, Jianbo Luo, Yunsong Yan
  • Publication number: 20210132132
    Abstract: Disclosed is a method for calculating radio interference suffered by a communication device mounted on an electric power tower. The method includes: establishing a relative position model of the communication device mounted on the electric power tower and transmission lines, calculating interference field strength of the communication device on the electric power tower, and determining whether the radio interference field strength at the mounting point satisfies the requirements.
    Type: Application
    Filed: August 25, 2020
    Publication date: May 6, 2021
    Applicants: STATE GRID NANJING SUPPLY POWER COMPANY, STATE GRID JIANGSU ELECTRIC POWER CO., LTD., State Grid Jiangsu Electric Power Co. Ltd. Marketing Center
    Inventors: Hong Zhu, Xiaohong Kong, Jing Chen, Dongxu Zhou, Jian Du, Shaojun Liu, Weiya Zhang, Yichen Pi, Linqing Yang, Wendi Wang, Qiusheng Li, Mingchi Shao, Yufeng Zou, Jun Hu
  • Patent number: 10886740
    Abstract: Provided is an emergency accurate control method and system for large-scale interruptible loads. The method includes: acquiring, by a region control master station, a sheddable load sequence table; acquiring, by the region control master station, a first to-be-shed load; performing, by the region control master station, minimum under-shedding matching layer by layer according to the first to-be-shed load, and shedding a sheddable load corresponding to control substation matching with the first to-be-shed load; and sending, by the region control master station, a second to-be-shed load to the corresponding control substation for load shedding if the second to-be-shed load exists.
    Type: Grant
    Filed: May 10, 2019
    Date of Patent: January 5, 2021
    Assignees: State Grid Jiangsu Electric Power Co., Ltd., Nari Technology Co., Ltd.
    Inventors: Jijun Yin, Qing Chen, Gang Chen, Xiao Lu, Jianyu Luo, Haifeng Li, Xueming Li, Kaiming Luo, Lin Liu, Yunsong Yan, Yefeng Jiang, Jianfeng Ren, Haifeng Xia
  • Publication number: 20200333384
    Abstract: Disclosed is a method for calculating a transient overvoltage at a direct current (DC) sending end by taking into account a dynamic process of a control system. First, a first reactive power consumed by a converter station is calculated based on system operation parameters and a DC closed-loop transfer function. Then, a transient voltage change rate is calculated based on the first reactive power and a second reactive power on an alternating current (AC) side. Finally, the transient voltage change rate is iterated to obtain the transient overvoltage. According to the technical solution provided by the embodiments of the present disclosure, the transient overvoltage is determined based on the system operation parameters and the closed-loop transfer function of a DC line, the dynamic process of control parameter change caused by a control action of the control system after a fault occurs can be determined by the closed-loop transfer function of the DC line, whereby the transient overvoltage can be determined.
    Type: Application
    Filed: August 12, 2019
    Publication date: October 22, 2020
    Applicants: STATE GRID JIANGSU ELECTRIC POWER CO., LTD., NORTHEAST ELECTRIC POWER UNIVERSITY, STATE GRID CORPORATION OF CHINA
    Inventors: Qing Chen, Haifeng Li, Houhe Chen, Changjiang Wang, Tao Jin, He Zhang, Huawei Lu, Jiagui Tao, Yu Liu
  • Patent number: 10785043
    Abstract: Provided are an accurate load shedding system, and a communication method and an access apparatus thereof. The access apparatus includes: two E1 interfaces, eight optical fiber interfaces, a CPU and an FPGA. The two E1 interfaces are respectively connected to a control apparatus A and a control apparatus B of a control substation. The eight optical fiber interfaces are respectively connected to eight control terminals. The FPGA includes eight optical fiber transceivers respectively connected to the eight optical fiber interfaces through serial interfaces, and two E1 transceivers respectively connected to the two E1 interfaces through serial interfaces. Each optical fiber transceiver includes a reset submodule. Each E1 transceiver also includes a reset submodule. The CPU is connected to the FPGA through a parallel bus.
    Type: Grant
    Filed: May 10, 2019
    Date of Patent: September 22, 2020
    Assignees: State Grid Jiangsu Electric Power Co., Ltd., Nari Technology Co., Ltd.
    Inventors: Jijun Yin, Qing Chen, Zheng Wu, Xiao Lu, Hengzhi Cui, Jianyu Luo, Chunlei Xu, Xueming Li, Xiangdong Chen, Kaiming Luo, Bijun Li, Lin Liu, Yunsong Yan, Jianfeng Ren, Haifeng Xia
  • Publication number: 20200176989
    Abstract: Disclosed are a method and apparatus for smoothing a link-line power of an electrothermal microgrid using a thermal storage heat pump cluster.
    Type: Application
    Filed: November 26, 2019
    Publication date: June 4, 2020
    Applicants: State Grid Jiangsu Electric Power CO., LTD Nanjing Power Supply Company, SHANGHAI JIAO TONG UNIVERSITY, HOHAI UNIVERSITY, STATE GRID JIANGSU ELECTRIC POWER CO., LTD
    Inventors: Yong ZHANG, Zhoujun MA, Ming ZHANG, Wentao HUANG, Shigang DAI, Yuping ZHENG, Nengling TAI, Chunning WANG, Liwei WANG, Honghua XU, Yiru CHEN, Di MA
  • Patent number: 10659152
    Abstract: The embodiment of the invention provides a measurement method and a measurement device for quality of a power distribution and utilization channel. The method comprises the steps of determining priority of each branch in the power distribution and utilization channel of which the quality is to be measured; and determining quality of the power distribution and utilization channel of each branch according to the priority. The method and the device are used for improving monitoring strength on a whole optical fiber channel, and enhancing application universality.
    Type: Grant
    Filed: May 28, 2018
    Date of Patent: May 19, 2020
    Assignee: STATE GRID JIANGSU ELECTRIC POWER CO., LTD NANJING POWERSUPPLY COMPANY
    Inventors: Hong Zhu, Wei Li, Lei Wei, Min Lu, Shaoyong Guo, Qiusheng Li, Yangling Chen, Jingwei Li
  • Publication number: 20200126706
    Abstract: The present invention discloses a device for evaluating and demagnetizing residual magnetism quantity of a power transformer. A main circuit comprises a switching power supply the two ends of which are respectively connected with a filter capacitor and a resistor in parallel. A forward end of the switching power supply is connected with a main switch in series. A rear end of the main switch is connected with a series branch of a sixth switch and a first resistor, a series branch of a first switch and a second switch, and a series branch of a third switch and a fourth switch are connected in parallel. A driving circuit is respectively connected with driving ends of the main switch, the sixth, first, second, third and fourth switches. A control circuit is connected with the driving circuit for sending an instruction to the driving circuit.
    Type: Application
    Filed: July 31, 2019
    Publication date: April 23, 2020
    Applicants: State Grid Jiangsu Electric Power Co.,Ltd. Research Institute, Jiangsu Electric Power Research Institute Corporation Limited, State Grid Jiangsu Electric Power Co.,Ltd., Nanjing DNN Technology Co.,LTD
    Inventors: Fengbo TAO, Jiansheng LI, Chao WEI, Yang LIU, Xu WEI, Yuncai LU, Shu CHEN, Hairong WEI, Yiming WU, Xiaoping YANG, Jieqing DENG, Peng WU, Tianxi XIE, Shengquan WANG, Caibo LIAO, Ruibin LI