Patents Assigned to Statoil
-
Patent number: 10261974Abstract: A method is disclosed for the estimation of subsurface temperature distributions from a 3-dimensional heat conductivity model for a geological formation. The method may be characterized by the following steps: (a) obtaining measured data corresponding to a geological subsurface formation of interest including seismic survey data, in-well temperature, seafloor or surface heat flux measurements and laboratory-based measurements of core porosity, (b) estimating a relationship between seismic velocity and heat conductivity, wherein seismic velocity is linearly dependent on porosity and heat conductivity is exponentially or linearly dependent on porosity, and (c) calibrating the model to the measured in-well data and laboratory-based measurements of core porosity.Type: GrantFiled: August 20, 2012Date of Patent: April 16, 2019Assignee: Statoil Petroleum ASInventors: Torgeir Wiik, Ketil Hokstad, Anders Dræge, Kenneth Duffaut, Christine Fichler, Rune Kyrkjebø
-
Patent number: 10246980Abstract: A method of treating a subsurface formation with low permeability to increase total oil production from the formation is disclosed. The method may include providing a first fluid into two or more fractures emanating from a first wellbore. The first fluid may be provided at a pressure below a fracture pressure of the formation. The first fluid may increase a pressure in zones substantially surrounding a first fracture and a second fracture emanating from the first wellbore. A zone having a lower pressure may be located between these zones. Additional fractures may be formed from a second wellbore in the formation with at least one of the additional fractures emanating from the second wellbore and propagating into the lower pressure zone. Hydrocarbons may be produced from the second wellbore. A second fluid may be provided into the first wellbore before and/or after producing the hydrocarbons from the second wellbore.Type: GrantFiled: September 23, 2016Date of Patent: April 2, 2019Assignee: Statoil Gulf Services LLCInventor: Huina Li
-
Patent number: 10246981Abstract: A method of treating a subsurface formation with low permeability to increase total oil production from the formation is disclosed. The method may include providing a first fluid into two or more fractures emanating from a first wellbore. The first fluid may form additional fractures in the formation. The first fluid may also increase a minimum horizontal stress in zones substantially surrounding the fractures emanating from the first wellbore and the additional fractures formed. A zone having a lower minimum horizontal stress may be located between these zones. Additional fractures may be formed from a second wellbore in the formation with at least one of the additional fractures emanating from the second wellbore and propagating into the lower minimum horizontal stress zone. Hydrocarbons may be produced from the first wellbore and/or the second wellbore. A second fluid may be provided into the first wellbore after producing the hydrocarbons from the first wellbore.Type: GrantFiled: September 23, 2016Date of Patent: April 2, 2019Assignee: Statoil Gulf Services LLCInventor: Huina Li
-
Publication number: 20190093465Abstract: A method of stimulating a formation containing two or more wellbores includes simultaneously stimulating a first region of each wellbore using a stimulation fluid so as to create a primary fracture in the first region of each wellbore, wherein the first region comprises a first opening or openings allowing fluid communication between each wellbore and the formation, wherein the first region has a first stimulated lateral length and wherein the flow rate of the stimulation fluid through the first opening or openings is greater than 1 barrel per minute per foot of the first stimulated lateral length.Type: ApplicationFiled: September 22, 2017Publication date: March 28, 2019Applicant: STATOIL GULF SERVICES LLCInventors: Jason BRYANT, Auristela Carolina Vasquez QUINTERO
-
Publication number: 20190093460Abstract: A reservoir stimulation tool for stimulating a formation surrounding a wellbore having an inner wall includes: a tubular string including an outer wall defining therein an inner bore, the tubular string being configured to be inserted into the wellbore so as to form an annular space between the tubular string and the inner wall of the wellbore, a plurality of ports formed in the outer wall of the tubular string; a plurality of port valves for opening or closing the ports; and a plurality of packers coupled to the tubular string, wherein each packer is configured to be expanded in order to engage the inner wall of the wellbore, thereby isolating two or more longitudinal segments of the annular space from each other.Type: ApplicationFiled: September 22, 2017Publication date: March 28, 2019Applicant: Statoil Gulf Services LLCInventors: Auristela Carolina Vasquez QUINTERO, Jason BRYANT
-
Publication number: 20190063193Abstract: A system for optimising injection of a diluent to one, some or all of one or more wells comprising a downhole pump and holding means for the diluent, said holding means being connected to the or each well via one or more injection lines through which the diluent may be pumped by diluent injection means, characterised in that said system comprises measurement means for real time measurement of one or more production performance parameters, and measurement of the rate of injection of the diluent; and means for optimising the injection of the diluent to at least one of said one or more wells on the basis of: (i) means for making controlled variations of the diluent injection into the at least or each well; (ii) means for the processing of the real time measurements of the production performance parameters affected by these variations to determine any necessary adjustment of the injection of the diluent towards an optimal value; and (iii) if required, making the corresponding physical adjustment of the injectionType: ApplicationFiled: October 22, 2015Publication date: February 28, 2019Applicant: STATOIL PETROLEUM ASInventors: Alexey PAVLOV, Kjetil FJALESTAD
-
Patent number: 10208547Abstract: A method, system and apparatus for producing hydrocarbons from a low permeability reservoir formation. A wellbore with a plurality of fractures designated as one of a first or a second set of fractures is provided. A first fluid conduit is formed by an annulus between an outer casing of a tubular and an inner tubular member, and is arranged to transport produced hydrocarbons. An interior of the inner tubular member forms a second fluid conduit which is arranged to transport an injection fluid. A set of first openings is provided in fluid connection with the first fluid conduit, each first opening being located to substantially align with one of a first set of fractures. A set of second openings is provided in fluid connection with the second fluid conduit, each second opening being located to substantially align with one of a second set of fractures.Type: GrantFiled: October 2, 2017Date of Patent: February 19, 2019Assignee: STATOIL PETROLEUM ASInventors: Halvor Kjørholt, Jan Håvard Jøranson, Fredrik Varpe
-
Patent number: 10202821Abstract: A method of plugging a well includes providing a tubing in a wellbore, wherein in a location for a well plug, the tubing is provided with an internal cable section placed inside of the tubing and/or an external cable section placed outside of the tubing, the external cable section including a fluid-tight cable suitable for forming a sealing part of the well plug, and forming a plug in the well in the location for the well plug without pulling the tubing from the wellbore.Type: GrantFiled: August 30, 2013Date of Patent: February 12, 2019Assignee: STATOIL PETROLEUM ASInventors: Pål Viggo Hemmingsen, Gjermund Grimsbo
-
Patent number: 10203052Abstract: The invention relates to a flexible pipe carcass comprising a flexible tubular wall structure comprising a helically wound wall strip; wherein interlocking sections of successive windings of said wall strip form the wall structure. The interlocking sections of adjacent wall strips define a length and are movable with respect to each other between a first position and a second, extended position for changing said length, the interlocking sections being formed such that in the extended position a carcass gap is provided between adjacent interlocking sections for accommodating relative movement there between upon flexure of the wall structure. An insert profile is located in the carcass gap of the tubular wall structure on an inside of the wall structure to at least partly cover the carcass gap.Type: GrantFiled: June 29, 2012Date of Patent: February 12, 2019Assignee: STATOIL PETROLEUM ASInventors: Knut-Aril Farnes, Bjørn Melve
-
Patent number: 10202843Abstract: A method and apparatus for measuring a property of settling of a first phase in a second fluid phase of a mixture. In order to measure the property of settling, the mixture may be contained in a chamber, an acoustic wave may be repeatedly passed vertically through the mixture, a transit time may be measured for each acoustic wave to traverse the mixture, and the property of settling using a change in the transit times of the acoustic waves may then be determined. In various embodiments, the property of settling can be a degree of settling.Type: GrantFiled: January 29, 2013Date of Patent: February 12, 2019Assignee: STATOIL PETROLEUM ASInventors: Tomasz Wroblewski, Lorents Reinås, Tor Henry Omland, Stian Mjølhus
-
Patent number: 10190387Abstract: A method of sealing a well comprises creating one or more openings in a tubing installed in a wellbore, in a location for a well seal; using a wireline to locate a stinger in that location; setting the stinger in that location; and forming a seal in the well in that location, by injecting sealant through said stinger.Type: GrantFiled: September 23, 2014Date of Patent: January 29, 2019Assignee: STATOIL PETROLEUM ASInventors: Pål Viggo Hemmingsen, Gjermund Grimsbo, Alastair Buchanan
-
Patent number: 10190400Abstract: A process for the recovery of hydrocarbons from a hydrocarbon bearing formation and in which are situated an upper injection well and a lower production well is presented. The region between the wells is preheated by circulating hot solvent through at least part of both of the wells until hydraulic communication between both wells is achieved. Solvent is injected into the upper injection well at or above its critical temperature and the solvent is pentane or a mixture of butane and pentane. A hot solvent chamber is created consisting of solvent vapor and liquid. Bitumen and solvent are mixed at the boundary of the solvent chamber so formed. The hydrocarbon and solvent are caused to be mixed to drain downwards by gravity and sideways by pressure gradient towards the lower production well. The mixture is produced to the surface through the lower production well.Type: GrantFiled: July 16, 2015Date of Patent: January 29, 2019Assignee: STATOIL ASAInventors: Jostein Alvestad, Aurelie Lagisquet, Eimund Gilje
-
Patent number: 10185049Abstract: Methods, a system and antennas are provided for transmitting or receiving signals from a hydrocarbon production well. The well comprises a well bore formed in a formation, a production liner/tubing extending axially along the well bore, and an inductive coupling disposed around the liner/tubing. The liner tubing is electrically coupled to the formation at two axially separated locations and is electrically isolated from the formation between the locations. For transmitting, an alternating current signal to the inductive coupling to induce a current in the liner/tubing, the liner tubing forming a dipole antenna that generates an electromagnetic radiation signal propagating through the formation. For receiving, the dipole antenna is exposed to an electromagnetic radiation signal propagated through the formation which induces an alternating current signal in the tubing and the current signal is detected at the inductive coupling.Type: GrantFiled: February 11, 2011Date of Patent: January 22, 2019Assignee: STATOIL PETROLEUM ASInventor: Kjetil Johannessen
-
Patent number: 10184090Abstract: A method and system for dehydration of a gas phase and hydrate inhibition of a liquid hydrocarbon phase in a multiphase hydrocarbon fluid stream containing water. The method may include (i) separating the hydrocarbon fluid stream into a liquid phase and a first gas phase, (ii) adding hydrate inhibitor to the first gas phase, and (iii) separating off condensed liquids and a second gas phase. The first gas phase has a water dew point that is lower than the initial multiphase hydrocarbon fluid stream and the second gas phase has a lower water dew point than the first gas phase. The hydrate inhibitor has a water content that is low enough to enable it to dry the first gas phase, the hydrate inhibitor being separated off with the condensed liquids and mixed with a part or all of the liquid phase from the separation to inhibit the liquid phase.Type: GrantFiled: November 26, 2012Date of Patent: January 22, 2019Assignee: Statoil Petroleum ASInventors: Knut Arild Maråk, Arne Olav Fredheim, Bernt Henning Rusten, Lars Henrik Gjertsen, Baard Kaasa
-
Patent number: 10179299Abstract: A combined fluid collector and redistributor for a process engineering column, including a fluid collector for collecting a first fluid; a fluid redistributor arranged below the fluid collector to define a space between the fluid collector and the fluid redistributor; at least one pipe passing through the space to connect the fluid collector to the fluid redistributor; and at least one conduit extending through the fluid collector to permit a second fluid to flow through the fluid collector. There is at least one deflector in the space, wherein the at least one deflector is set at an angle relative to a central axis of the device whereby flow of the second fluid within the space is displaced angularly around the central axis.Type: GrantFiled: December 20, 2013Date of Patent: January 15, 2019Assignee: STATOIL PETROLEUM ASInventors: Eivind Johannesen, Carl Birger Jenssen, Pablo Matias Dupuy
-
Patent number: 10175373Abstract: There is described a technique for determining a temperature at a region below the surface of the Earth. In an embodiment, a time of travel of a seismic wave following the emission from a source into the earth is provided, and the travel time is used to estimate the temperature. In one example, a model based on the travel time and a further component, which may for example be based on heat flow and a constant of proportionality between seismic velocity and thermal conductivity, may be used to estimate the temperature.Type: GrantFiled: April 22, 2013Date of Patent: January 8, 2019Assignee: STATOIL PETROLEUM ASInventor: Ketil Hokstad
-
Patent number: 10175377Abstract: One aspect relates to a method of installing a transmission system in a hydrocarbon production well. The transmission system is operable for transmitting power and/or control signals down the well or for transmitting data signals back up the well. The well comprises a main well bore, a production tubing inside the main well bore and a branch off the production tubing. The branch comprises a side track tubing. The method includes: providing a sensor and/or load assembly in the branch; installing a first inductive coupler of an induced current transmission arrangement around the production tubing in the main well bore, and connecting the sensor/load assembly to the first inductive coupler via a communication link. Another aspect relates to a hydrocarbon production well installation.Type: GrantFiled: February 11, 2011Date of Patent: January 8, 2019Assignee: STATOIL PERTOLEUM ASInventor: Kjetil Johannessen
-
Patent number: 10145237Abstract: The apparatus for evaluating a wellbore while drilling includes a logging toolheld on a drill string and is adapted to obtain data from the wellbore while moving the drill string including the logging tool uphole and out of the wellbore. The logging tool includes a memory for storing obtained data and an on-board power supply battery. A computer being positioned at a surface level of the wellbore is adapted to obtain the data from the memory when the logging tool is also positioned at the surface level. The logging tool is adapted to perform a minimum power-consuming sleep mode with a data obtaining and storing function being disabled and the computer is adapted to transmit a wake-up signal downhole to enable the data obtaining and storing function of the logging tool just prior to tripping out the drill string from the wellbore. The wake-up signal preferably is a mud pulse signal sent through the drilling fluid used when drilling the wellbore.Type: GrantFiled: April 2, 2009Date of Patent: December 4, 2018Assignee: STATOIL PERTOLEUM ASInventors: Mohammad Jahangir, Tore Weltzin
-
Patent number: 10132322Abstract: A method of operating and cleaning a compressor comprising the following steps: passing a first fluid through the compressor, the first fluid comprising gas from a separator wherein the compressor is operating to compress the first fluid passed therethrough, mixing well fluid bypassed from upstream of the separator with the gas from the separator to produce a second fluid comprising gas and liquid wherein the gas and liquid are from at least one well; and passing the second fluid through the compressor, wherein the second fluid is passed through the compressor for a limited time period to clean a surface inside the compressor, the compressor operating to compress the second fluid passed therethrough.Type: GrantFiled: June 17, 2016Date of Patent: November 20, 2018Assignee: STATOIL PETROLEUM ASInventors: Lars Brenne, Tor Bjorge, Harald Underbakke, Svend Tarald Kibsgaard
-
Patent number: 10125584Abstract: A method for operating an electrical submersible pump, ESP, lifted well, the method comprising: measuring a characteristic of the well or a characteristic of a device associated with the well; generating a first control signal for instructing a change in the operation of the ESP; generating a second control signal for instructing a change in the operation of a further device associated with the well; wherein a degree of change in each of the first and second control signals is dependent on the outcome of the measuring and on a known effect caused by sending at least one of said first control signal to the ESP or said second control signal to the further device associated with the well; and sending the first control signal to the ESP and the second control signal to the further device associated with the well.Type: GrantFiled: November 14, 2013Date of Patent: November 13, 2018Assignee: STATOIL PERTROLEUM ASInventors: Elvira Marie Bergheim Aske, Morten Fredriksen, Alexey Pavlov, Kjetil Fjalestad, Dinesh Krishnamoorthy, Petter Tøndel, Yilmaz Türkyilmaz