Abstract: A train integrity network system comprises bogie units which monitor critical parameters relating to the condition of bogie components and the rail track they are travelling on, an onboard server which controls the bogie units and a wireless network which enables communication between the server and the bogie units. Each bogie unit is powered by an electrical generator which utilises the rotation of the bogie wheels and has a processor which compares the critical parameters against defined standards in order to issue alerts to the train driver. The wireless network utilises master/slave base band role switching, has store-and-forward nodes which convey quasi real time data to the server and utilises frequency hopping modes.
Type:
Application
Filed:
May 3, 2005
Publication date:
August 14, 2008
Applicant:
STI RAIL PTY LTD
Inventors:
Donald Stephen Searle, Charles Richard Wallace Wilkins