Abstract: A prefabricated building panel for use in constructing a building structure includes a generally planar concrete panel, a metal member separate from the concrete panel and positioned on an end surface of the concrete panel so that the metal member is exposed for serving as a welding surface, and a plurality of bar anchors welded to the metal member and embedded in the concrete panel. The bar anchor is welded to the metal member to fix the metal member in place relative to the concrete panel. The metal member serves as a connection region for connecting the building panel to another building panel through welding.
Abstract: A method for treating process material can include introducing process material into two different vessels, raising the temperature within one of the vessels through the introduction of steam to heat the material in the vessel, and reducing the temperature in the one vessel while also increasing the temperature in the other vessel by venting the interior of the one vessel to the interior of the other vessel.