Abstract: A scaffold wall system for erecting temporary insulated facilities using a scaffold structure for support is disclosed. The system comprises a floor supported by the scaffold structure, a plurality of walls supported by the floor, and a ceiling supported by the walls. The floor comprises a plurality of support beams laid across the scaffold structure, and floor boards laid across the support beams. The walls comprise a plurality of wall panels placed into customized tracks secured to the floor. Insulative sleeves are placed between the wall panels. The ceiling also comprises a plurality of panels with insulative sleeves. The system allows for multiple levels of temporary insulated facilities to be erected within a scaffold.
Abstract: A scaffold wall system for erecting temporary insulated facilities using a scaffold structure for support is disclosed. The system comprises a floor supported by the scaffold structure, a plurality of walls supported by the floor, and a ceiling supported by the walls. The floor comprises a plurality of support beams laid across the scaffold structure, and floor boards laid across the support beams. The walls comprise a plurality of wall panels placed into customized tracks secured to the floor. Insulative sleeves are placed between the wall panels. The ceiling also comprises a plurality of panels with insulative sleeves. The system allows for multiple levels of temporary insulated facilities to be erected within a scaffold.