Abstract: A ballasting system for an on-site sewage treatment and disposal system for areas having a ground water level above a minimum depth below grade. A perimeter barrier is arranged around a selected subterraneal volume within a ground area. The perimeter barrier has a circumference and a closed end closest to atmosphere. A pump having a gas intake and a discharge side which discharges gas at a pressure greater than atmospheric pressure is also provided. The discharge side of the pump is in fluid communication with the selected subterraneal volume to lower the ground water level within the perimeter barrier to a level at or below the minimum depth below grade. A flexible membrane is located adjacent the perimeter barrier end and within the ground area. The flexible membrane extends over substantially the entire circumference of the perimeter barrier. A plurality of ballasting beams is located above the flexible membrane and within the ground area.
Abstract: A ballasting system for an on-site sewage treatment and disposal system for areas having a ground water level above a minimum depth below grade. A perimeter barrier is arranged around a selected subterraneal volume within a ground area. The perimeter barrier has a circumference and a closed end closest to atmosphere. A pump having a gas intake and a discharge side which discharges gas at a pressure greater than atmospheric pressure is also provided. The discharge side of the pump is in fluid communication with the selected subterraneal volume to lower the ground water level within the perimeter barrier to a level at or below the minimum depth below grade. A flexible membrane is located adjacent the perimeter barrier end and within the ground area. The flexible membrane extends over substantially the entire circumference of the perimeter barrier. A plurality of ballasting beams is located above the flexible membrane and within the ground area.
Abstract: An on-site sewage treatment and disposal system for areas having a ground water level above a minimum depth below grade is provided. The system includes a perimeter barrier arranged around a selected subterraneal volume. A drainage pipe which is adapted to receive fluid is provided. The drainage pipe is at least partially located within the selected subterraneal volume inside the perimeter barrier. A pump having a gas intake and a discharge side which discharges gas at a pressure greater than atmospheric pressure is also provided. The discharge side of the pump is in fluid communication with the selected subterraneal volume to lower the ground water level within the perimeter barrier to a level at or below the minimum depth below grade. A method for on-site wastewater disposal is also provided utilizing the treatment and disposal system.