Abstract: Various implementations include a machine for resurface existing roads. The machine may include a premixed stress absorbing membrane interlayer (SAMI) material distribution component configured to distribute a premixed SAMI material on an existing road. The distributed premixed SAMI material may include a mixture and/or combination of binding material and pre-cut fiber material. The machine may also include a channel positioned adjacent and downstream of the premixed SAMI material distribution component. The channel may be configured to supply an asphalt mixture directly over the premixed SAMI material. Additionally, the machine may include a screed positioned adjacent the channel. The screed may be positioned to contact the asphalt mixture.
Abstract: A method of resurfacing exposed surfaces of existing roads, and a resurfaced road. The method may include forming stress absorbing membrane interlayers (SAMIs) over the exposed surface of the existing road. The SAMIs may include a first layer of a binding material and a fiber material. The method may also include disposing an asphalt mixture directly over the SAMIs. The disposed asphalt mixture may cover the SAMIs. Additionally, the method may include shaping the asphalt mixture disposed over the SAMIs.
Abstract: A machine for resurface existing roads. The machine may include a first group of sprayers configured to form a first layer of binding material, and a fiber material distribution component positioned adjacent the first group of sprayers. The fiber material distribution component may be configured to distribute fiber material onto the first layer of the binding material. The machine may also include a second group of sprayers positioned adjacent the fiber material distribution component. The second group of sprayers may be configured to form a second layer of the binding material over the distributed fiber material. Additionally, the machine may include a channel positioned adjacent the second group of sprayers. The channel may be configured to supply an asphalt mixture over the second layer of the binding material. Further, the machine may include a screed positioned adjacent the conduit. The screed may be positioned to contact the asphalt mixture.