Patents Assigned to The Third Engineering Group Co., Ltd. of China Railway
  • Patent number: 12252889
    Abstract: A construction method for a radiation-proof concrete hole reserved split bolt includes: 1) mounting a hole reserved sleeve; 2) mounting an inclined recoverable split bolt; 3) mounting an inclined split bolt; 4) fixing the inclined recoverable split bolt and an inclined split bolt main body; 5) pouring concrete, and dismantling related components; 6) plugging the inclined split bolt main body; and 7) plugging the hole reserved sleeve. According to the construction method, the hole reserved sleeve is obliquely arranged, the inner side of the hole reserved sleeve is sprayed with a radiation-proof coating with the functions of reducing radiation ray reflection and absorbing certain radiation rays, and in addition, after the construction of a pipeline or a line in the hole reserved sleeve is finished, the openings at both ends of the hole reserved sleeve are plugged with a radiation-proof mortar incorporated with a micro-expanding agent and a waterproof agent.
    Type: Grant
    Filed: June 21, 2022
    Date of Patent: March 18, 2025
    Assignees: China Railway The Third Engineering Group Construction and Installation Engineering Co., Ltd., The Third Engineering Group Co., Ltd. of China Railway
    Inventors: Zhiqiang Wang, Xiaofeng Wang, Huasong Yin, Wei Wu, Junyi Meng, Liangliang Lian, Xiuru Cheng, Zhipeng Yao, Wenkui Gao, Yuan Zhao, Ze Zhang, Le Ren, Yingbo Dong, Lin Li, Yajuan Zhang
  • Publication number: 20230020298
    Abstract: A construction method for a radiation-proof concrete hole reserved split bolt includes: 1) mounting a hole reserved sleeve; 2) mounting an inclined recoverable split bolt; 3) mounting an inclined split bolt; 4) fixing the inclined recoverable split bolt and an inclined split bolt main body; 5) pouring concrete, and dismantling related components; 6) plugging the inclined split bolt main body; and 7) plugging the hole reserved sleeve. According to the construction method, the hole reserved sleeve is obliquely arranged, the inner side of the hole reserved sleeve is sprayed with a radiation-proof coating with the functions of reducing radiation ray reflection and absorbing certain radiation rays, and in addition, after the construction of a pipeline or a line in the hole reserved sleeve is finished, the openings at both ends of the hole reserved sleeve are plugged with a radiation-proof mortar incorporated with a micro-expanding agent and a waterproof agent.
    Type: Application
    Filed: June 21, 2022
    Publication date: January 19, 2023
    Applicants: China Railway The Third Engineering Group Construction and Installation Engineering Co., Ltd., The Third Engineering Group Co., Ltd. of China Railway
    Inventors: Zhiqiang WANG, Xiaofeng WANG, Huasong YIN, Wei WU, Junyi MENG, Liangliang LIAN, Xiuru CHENG, Zhipeng YAO, Wenkui GAO, Yuan ZHAO, Ze ZHANG, Le REN, Yingbo DONG, Lin LI, Yajuan ZHANG