Abstract: In construction of a pin control type weft reservoir, a control pin once registered at a stand-by position upon initiation of weft insertion is brought to an operative position right after the initiation of weft insertion for simple adjustment in operation timing of the control pin and for successful separate reservation of weft on the reservoir drum without any substantial ill influence of weft slack caused by the provisional recession of the control pin.