Abstract: A system for location-based management of construction is provided. A plurality of location systems generate one or more locations where construction activities associated with one or more elements in each location can be performed. A construction activity location system associates each of a plurality of construction tasks with one of the locations. An element splitting system receives an element selection and associates one or more construction tasks of the element with two or more locations. A construction activity association system associates one or more of the plurality of construction tasks with one or more of the other construction tasks. A construction sequence system generates a sequence of construction tasks based on the layer associated with each construction task and based on the other construction tasks associated with each construction task.
Type:
Grant
Filed:
April 3, 2008
Date of Patent:
August 14, 2012
Assignee:
Vico Software Kft.
Inventors:
Olli P. P. Seppanen, Clay J. Freeman, Marcel Broekmaat
Abstract: A method for modeling construction risk is provided. The method includes providing a statistical model for each of a plurality of location-based tasks of a construction project model. A model parameter is randomly selected for each of the plurality of statistical models to generate a statistically-based duration for each of the location-based tasks. A schedule duration is then calculated using the statistically-based durations of the location-based tasks, and the steps of providing, randomly selecting, and calculating are repeated until a statistical distribution for the construction project model is generated, such as using a Monte Carlo analysis procedure.
Type:
Grant
Filed:
August 11, 2006
Date of Patent:
July 6, 2010
Assignee:
Vico Software Kft.
Inventors:
Olli Pentti Petteri Seppanen, Ilkka Pentti Samuli Pelkonen, Tim Marec Wessman