Abstract: Methods for determining parameter/s of a well completion design (WCD) for at least a portion of a drilled well based on drilling data corresponding to variables of mechanical specific energy (MSE) are provided. In some cases, MSE values may be acquired and the WCD parameter/s may be based on the MSE values. The MSE values may be obtained from a provider or may be acquired by calculating the MSE values via the drilling data. In some cases, the data may be amended prior to determining the WCD parameter/s to substantially neutralize distortions of the data. In some cases, the methods may include creating a geomechanical model of the drilled well from acquired MSE values, optionally amending the geomechanical model and determining the WCD parameter/s from the geomechanical model. Storage mediums having program instructions which are executable by a processor for performing any steps of the methods are also provided.
Type:
Grant
Filed:
June 9, 2015
Date of Patent:
April 25, 2023
Assignees:
Nextier Completion Solutions Inc., Vorpal Energy Solutions, LLC.