Patents Examined by Esley Le Fisher
  • Patent number: 11939952
    Abstract: A method of installing a wind turbine (10) at an offshore location. The wind turbine (10) includes a tower (18) and an energy generating unit (16). The tower (18) is configured to be secured to a transition piece (12, 42). Prior to shipping, the method includes electrically coupling electrical devices and/or systems (52) by cables (54) to energy generating unit (16) or wind turbine tower (18) or a test dummy therefor. The electrical devices and/or systems (52) are configured to be attached to transition piece (12, 42) once the tower (18) is installed. The method includes testing and commissioning the electrical devices and/or systems (52) while electrically coupled to the cables (54). Prior to shipping and after testing and commissioning, the method includes storing the electrical devices and/or systems (52) and attached cables (54) inside the tower (18).
    Type: Grant
    Filed: June 15, 2021
    Date of Patent: March 26, 2024
    Assignee: Vestas Wind Systems A/S
    Inventors: Slawomir Michaluk, Thor Thiim Hansen