Patent number: 10832179
Abstract: Embodiments provide a method for constructing a future-state power grid model and device, including that: a current power grid model, an equipment power-off plan, an equipment retirement plan and an equipment addition plan are acquired; then, equipment is added according to the current power grid model, and an added equipment information set, a retired equipment information set and a powered-off equipment information set are determined according to the equipment addition plan, the equipment retirement plan and the equipment power-off plan respectively; and finally, a state of the added equipment is set to be an operating state, an initial network model of each period is formed according to a time sequence, and a future-state network model is constructed according to the added equipment information set, the retired equipment information set, the powered-off equipment information set and the initial network models. The embodiments further provide construction equipment and a storage medium.
Type:
Grant
Filed:
September 19, 2017
Date of Patent:
November 10, 2020
Assignees:
CHINA ELECTRIC POWER RESEARCH INSTITUTE CO. LTD., STATE GRID CORPORATION OF CHINA, STATE GRID SICHUAN ELECTRIC POWER COMPANY
Inventors:
Guodong Huang, Qiang Ding, Zelei Zhu, Sai Dai, Hui Cui, Dan Xu, Zhi Cai, Bo Li, Chenxu Hu, Chuancheng Zhang, Jinghua Yan, Deyue Men, Jiali Zhang, Peijun Li, Zhen Sun