Patents by Inventor Adel A. Qahtani

Adel A. Qahtani has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11598182
    Abstract: A method of drilling an uncompleted lateral wellbore in a subsurface formation includes drilling the uncompleted lateral wellbore with coiled tubing in the subsurface formation. The subsurface formation includes unconsolidated sand and the subsurface formation overlays a water-saturated reservoir. The method may further include introducing particles having an average particle size of from 8 mesh to 140 mesh into the uncompleted lateral wellbore, thereby supporting the uncompleted lateral wellbore and avoiding wellbore collapse and installing a screen in a vertical wellbore fluidly connected to the uncompleted lateral wellbore, wherein the screen has a mesh size of from 325 mesh to 1000 mesh. The subsurface formation may include hydrocarbons and the method may further include producing hydrocarbons from the subsurface formation.
    Type: Grant
    Filed: March 11, 2021
    Date of Patent: March 7, 2023
    Assignee: Saudi Arabian Oil Company
    Inventors: Imad Brohi, Adel A. Qahtani, Rayan A. Alidi
  • Publication number: 20220290532
    Abstract: A method of drilling an uncompleted lateral wellbore in a subsurface formation includes drilling the uncompleted lateral wellbore with coiled tubing in the subsurface formation. The subsurface formation includes unconsolidated sand and the subsurface formation overlays a water-saturated reservoir. The method may further include introducing particles having an average particle size of from 8 mesh to 140 mesh into the uncompleted lateral wellbore, thereby supporting the uncompleted lateral wellbore and avoiding wellbore collapse and installing a screen in a vertical wellbore fluidly connected to the uncompleted lateral wellbore, wherein the screen has a mesh size of from 325 mesh to 1000 mesh. The subsurface formation may include hydrocarbons and the method may further include producing hydrocarbons from the subsurface formation.
    Type: Application
    Filed: March 11, 2021
    Publication date: September 15, 2022
    Applicant: Saudi Arabian Oil Company
    Inventors: Imad Brohi, Adel A. Qahtani, Rayan A. Alidi