Patents by Inventor Adel Aty

Adel Aty has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 12264555
    Abstract: A system for relieving pressure in a wellbore annulus of a hydrocarbon recovery well includes a wellhead, a production line extending from the wellhead, and an annulus relief line extending between the wellhead and the production line. A first pressure gauge measures fluid pressure in the wellbore annulus, a second pressure gauge measures fluid pressure in the production line. A well control system is in communication with the first pressure gauge, second pressure gauge and a check valve disposed in the annulus relief line. The well control system opens and closes the check valve in response to a determined difference between fluid pressure measured by the first pressure gauge and fluid pressure measured by the second pressure gauge. A related method includes measuring the fluid pressure in the wellbore annulus and in the production line, and opening and closing the check valve in response to the determined pressure difference.
    Type: Grant
    Filed: March 30, 2023
    Date of Patent: April 1, 2025
    Assignee: SAUDI ARABIAN OIL COMPANY
    Inventors: Adel Aty, Ayman Qatari, Ahmed Al-Nwaeser, Rakan Al-Yateem
  • Publication number: 20240328280
    Abstract: A system for relieving pressure in a wellbore annulus of a hydrocarbon recovery well includes a wellhead, a production line extending from the wellhead, and an annulus relief line extending between the wellhead and the production line. A first pressure gauge measures fluid pressure in the wellbore annulus, a second pressure gauge measures fluid pressure in the production line. A well control system is in communication with the first pressure gauge, second pressure gauge and a check valve disposed in the annulus relief line. The well control system opens and closes the check valve in response to a determined difference between fluid pressure measured by the first pressure gauge and fluid pressure measured by the second pressure gauge. A related method includes measuring the fluid pressure in the wellbore annulus and in the production line, and opening and closing the check valve in response to the determined pressure difference.
    Type: Application
    Filed: March 30, 2023
    Publication date: October 3, 2024
    Applicant: SAUDI ARABIAN OIL COMPANY
    Inventors: Adel Aty, Ayman Qatari, Ahmed Al-Nwaeser, Rakan Al-Yateem