Patents by Inventor Alexander Vuacheslavovich Mikhaylov

Alexander Vuacheslavovich Mikhaylov has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10030495
    Abstract: A method of heterogeneous proppant placement in a subterranean fracture is disclosed. The method comprises injecting well treatment fluid including proppant (16) and proppant-spacing filler material (18) through a wellbore (10) into the fracture (20), heterogeneously placing the proppant in the fracture in a plurality of proppant clusters or islands (22) spaced apart by the material (24), and removing the filler material (24) to form open channels (26) around the pillars (28). The filler material can be dissolvable particles, initially acting as a consolidator during placement of the proppant in the fracture, and later dissolving to leave flow channels between the proppant pillars. The well treatment fluid can include extrametrical materials to provide reinforcement and consolidation of the proppant and, additionally or alternatively, to inhibit settling of the proppant in the treatment fluid.
    Type: Grant
    Filed: February 23, 2015
    Date of Patent: July 24, 2018
    Assignee: SCHLUMBERGER TECHNOLOGY CORPORATION
    Inventors: Fedor Nikolaevich Litvinets, Andrey Vladimirovich Bogdan, Sergey Mikhailovich Makarychev-Mikhailov, Oleg Medvedev, Alejandro Pena, Konstantin Mikhailovich Lyapunov, Alexander Vuacheslavovich Mikhaylov, Timothy M. Lesko, J. Ernest Brown, Dean M. Willberg, Ivan Vitalievich Kosarev, Anatoly Vladimirovich Medvedev, Jonathan Abbott, Alexander Alexandrovich Burukhin
  • Patent number: 9863230
    Abstract: A method of injecting well treatment fluid including proppant and proppant-spacing filler material through a wellbore into the fracture, heterogeneously placing the proppant in the fracture in a plurality of proppant clusters or islands spaced apart by the material, and removing the filler material to form open channels around the pillars for fluid flow from the formation through the fracture toward the wellbore. The proppant and channelant can be segregated within the well treatment fluid, or segregated during placement in the fracture. The filler material can be dissolvable particles, initially acting as a filler material during placement of the proppant in the fracture, and later dissolving to leave the flow channels between the proppant pillars. The well treatment fluid can include extrametrical materials to provide reinforcement and consolidation of the proppant and/or to inhibit settling of the proppant.
    Type: Grant
    Filed: June 12, 2012
    Date of Patent: January 9, 2018
    Assignee: SCHLUMBERGER TECHNOLOGY CORPORATION
    Inventors: Fedor Nikolaevich Litvinets, Andrey Vladimirovich Bogdan, Sergey Mikhailovich Makarychev-Mikhaliov, Oleg Medvedev, Alejandro Pena, Konstantin Mikhailovich Lyapunov, Alexander Vuacheslavovich Mikhaylov, Timothy M. Lesko, J. Ernest Brown, Dean M. Willberg, Ivan Vitalievich Kosarev, Anatoly Vladimirovich Medvedev, Jonathan Abbott, Alexander Alexandrovich Burukhin
  • Patent number: 9447673
    Abstract: A proppant pack may be formed in a fracture that extends from a wellbore formed in a subterranean formation and is accomplished through different methods. The methods involve providing multiple spaced apart proppant slugs within a hydraulic fracturing fluid that is introduced into the wellbore at a pressure above the fracturing pressure of the formation.
    Type: Grant
    Filed: May 17, 2010
    Date of Patent: September 20, 2016
    Assignee: SCHLUMBERGER TECHNOLOGY CORPORATION
    Inventors: Anatoly Vladimirovich Medvedev, Oleg Medvedev, Alexander Vuacheslavovich Mikhaylov, Christopher N. Fredd, Kreso Kurt Butula, John Lassek, J. Ernest Brown, Konstantin Mikhailovich Lyapunov
  • Publication number: 20150204177
    Abstract: A technique facilitates treatment of a subterranean formation. A proppant and a proppant carrier fluid are delivered to a subterranean location for treatment of the formation. At the subterranean location, heterogeneities of proppant structures are generated with the proppant and the proppant carrier fluid. The heterogeneous proppant structures are then transported into the subterranean formation to improve conductivity.
    Type: Application
    Filed: August 7, 2012
    Publication date: July 23, 2015
    Applicant: Schlumberger Technology Corporation
    Inventors: Ruslan Ramilevich Isangulov, Konstantin Viktorovich Vidma, Oleg Medvedev, Konstantin Mikhailovich Lyapunov, Anatoly Vladimirovich Medvedev, Alexander Vuacheslavovich Mikhaylov, Rod William Shampine, Geza Horvath Szabo
  • Patent number: 9085727
    Abstract: A method of heterogeneous proppant placement in a subterranean fracture is disclosed. The method comprises injecting well treatment fluid including proppant (16) and proppant-spacing filler material (18) through a wellbore (10) into the fracture (20), heterogeneously placing the proppant in the fracture in a plurality of proppant clusters or islands (22) spaced apart by the material (24), and removing the filler material (24) to form open channels (26) around the pillars (28). The filler material can be dissolvable particles, initially acting as a consolidator during placement of the proppant in the fracture, and later dissolving to leave flow channels between the proppant pillars. The well treatment fluid can include extrametrical materials to provide reinforcement and consolidation of the proppant and, additionally or alternatively, to inhibit settling of the proppant in the treatment fluid.
    Type: Grant
    Filed: July 13, 2012
    Date of Patent: July 21, 2015
    Assignee: Schlumberger Technology Corporation
    Inventors: Fedor Nikolaevich Litvinets, Andrey Vladimirovich Bogdan, Sergey Mikhailovich Makarychev-Mikhailov, Oleg Medvedev, Alejandro Pena, Konstantin Mikhailovich Lyapunov, Alexander Vuacheslavovich Mikhaylov, Timothy M. Lesko, J. Ernest Brown, Dean M. Willberg, Ivan Vitalievich Kosarev, Anatoly Vladimirovich Medvedev, Jonathan Abbott, Alexander Alexandrovich Burukhin
  • Publication number: 20150167443
    Abstract: A method of heterogeneous proppant placement in a subterranean fracture is disclosed. The method comprises injecting well treatment fluid including proppant (16) and proppant-spacing filler material (18) through a wellbore (10) into the fracture (20), heterogeneously placing the proppant in the fracture in a plurality of proppant clusters or islands (22) spaced apart by the material (24), and removing the filler material (24) to form open channels (26) around the pillars (28). The filler material can be dissolvable particles, initially acting as a consolidator during placement of the proppant in the fracture, and later dissolving to leave flow channels between the proppant pillars. The well treatment fluid can include extrametrical materials to provide reinforcement and consolidation of the proppant and, additionally or alternatively, to inhibit settling of the proppant in the treatment fluid.
    Type: Application
    Filed: February 23, 2015
    Publication date: June 18, 2015
    Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
    Inventors: Fedor Nikolaevich Litvinets, Andrey Vladimirovich Bogdan, Sergey Mikhailovich Makarychev-Mikhailov, Oleg Medvedev, Alejandro Pena, Konstantin Mikhailovich Lyapunov, Alexander Vuacheslavovich Mikhaylov, Timothy M. Lesko, J. Ernest Brown, Dean M. Willberg, Ivan Vitalievich Kosarev, Anatoly Vladimirovich Medvedev, Jonathan Abbott, Alexander Alexandrovich Burukhin
  • Publication number: 20130146292
    Abstract: A method of injecting well treatment fluid including proppant and proppant-spacing filler material through a wellbore into the fracture, heterogeneously placing the proppant in the fracture in a plurality of proppant clusters or islands spaced apart by the material, and removing the filler material to form open channels around the pillars for fluid flow from the formation through the fracture toward the wellbore. The proppant and channelant can be segregated within the well treatment fluid, or segregated during placement in the fracture. The filler material can be dissolvable particles, initially acting as a filler material during placement of the proppant in the fracture, and later dissolving to leave the flow channels between the proppant pillars. The well treatment fluid can include extrametrical materials to provide reinforcement and consolidation of the proppant and/or to inhibit settling of the proppant.
    Type: Application
    Filed: June 12, 2012
    Publication date: June 13, 2013
    Inventors: Fedor Nikolaevich Litvinets, Andrey Vladimirovich Bogdan, Sergey Mikhailovich Makarychev-Mikhaylov, Oleg Medvedev, Alejandro Pena, Konstantin Mikhailovich Lyapunov, Alexander Vuacheslavovich Mikhaylov, Timothy M. Lesko, J. Ernest Brown, Dean M. Willberg, Ivan Vitalievich Kosarev, Anatoly Vladimirovich Medvedev, Jonathan Abbott, Alexander Alexandrovich Burukhin
  • Publication number: 20130105166
    Abstract: A proppant pack may be formed in a fracture that extends from a wellbore formed in a subterranean formation is accomplished through different methods. The methods involve providing multiple spaced apart proppant slugs with in a hydraulic fracturing fluid that is introduced into the wellbore at a pressure above the fracturing pressure of the formation.
    Type: Application
    Filed: May 17, 2010
    Publication date: May 2, 2013
    Inventors: Anatoly Vladimirovich Medvedev, Oleg Medvedev, Alexander Vuacheslavovich Mikhaylov, Christopher N. Fredd, Kreso Kurt Butula, John Lassek, J. Ernest Brown, Konstantin Mikhailovich Lyapunov
  • Publication number: 20120325472
    Abstract: A method of heterogeneous proppant placement in a subterranean fracture is disclosed. The method comprises injecting well treatment fluid including proppant (16) and proppant-spacing filler material (18) through a wellbore (10) into the fracture (20), heterogeneously placing the proppant in the fracture in a plurality of proppant clusters or islands (22) spaced apart by the material (24), and removing the filler material (24) to form open channels (26) around the pillars (28). The filler material can be dissolvable particles, initially acting as a consolidator during placement of the proppant in the fracture, and later dissolving to leave flow channels between the proppant pillars. The well treatment fluid can include extrametrical materials to provide reinforcement and consolidation of the proppant and, additionally or alternatively, to inhibit settling of the proppant in the treatment fluid.
    Type: Application
    Filed: July 13, 2012
    Publication date: December 27, 2012
    Inventors: Fedor Nikolaevich Litvinets, Andrey Vladimirovich Bogdan, Sergey Mikhailovich Makarychev-Mikhailov, Oleg Medvedev, Alejandro Pena, Konstantin Mikhailovich Lyapunov, Alexander Vuacheslavovich Mikhaylov, Timothy M. Lesko, J. Ernest Brown, Dean M. Willberg, Ivan Vitalievich Kosarev, Anatoly Vladimirovich Medvedev, Jonathan Abbott, Alexander Alexandrovich Burukhin