  • Patent number: 11319679
    Abstract: The bridge construction system and method according to the present invention provides a lightweight, efficient, economical, long-lasting, and easily implemented composite steel structure that can be filled with concrete in place for the construction of pedestrian and smaller road bridges, specifically those found in rural areas. The bridge construction system of the present invention is unique in that it is a steel-frame reinforced composite bridge with decking and rebar caging that provides a permanent, non-removable form for poured-in-place concrete. The composite nature of the bridge allows for installation of the bridge to take place in one day, while the entire process from site preparation such as grading and excavation to cleanup takes a week or less. The quick installation of the bridge is designed to have a minimally invasive impact on the surrounding environment.
    Type: Grant
    Filed: July 24, 2020
    Date of Patent: May 3, 2022
    Inventor: Andy Vanaman
  • Publication number: 20210025120
    Abstract: The bridge construction system and method according to the present invention provides a lightweight, efficient, economical, long-lasting, and easily implemented composite steel structure that can be filled with concrete in place for the construction of pedestrian and smaller road bridges, specifically those found in rural areas. The bridge construction system of the present invention is unique in that it is a steel-frame reinforced composite bridge with decking and rebar caging that provides a permanent, non-removable form for poured-in-place concrete. The composite nature of the bridge allows for installation of the bridge to take place in one day, while the entire process from site preparation such as grading and excavation to cleanup takes a week or less. The quick installation of the bridge is designed to have a minimally invasive impact on the surrounding environment.
    Type: Application
    Filed: July 24, 2020
    Publication date: January 28, 2021
    Inventor: Andy Vanaman
  • Publication number: 20190284795
    Abstract: A free-standing modular egress system comprising various elements of a core frame, a staircase, a handrail, a long landing, a short landing, a door frame, and a means for attachment, for use in construction of hospitality and residential building construction. The system is prefabricated off-site which makes the onsite installation easier and capable of being installed prior to construction of the building.
    Type: Application
    Filed: March 14, 2019
    Publication date: September 19, 2019
    Inventor: Andy Vanaman