Patents by Inventor Arie Shental

Arie Shental has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10310492
    Abstract: The invention provides a computerized method for optimization of efficiency of a production floor producing three-dimensional products using two-dimensional cutting machines, the method comprising: a. receiving input parameters comprising job data, due dates, product design data, production floor resources available and inventory data; b. maintaining in memory manufacturing rules and objectives; c. assigning relative weights of importance to the input parameters and to the manufacturing rules and objectives; d. computing, based on the input parameters, on the manufacturing rules and objectives and on the relative weights of importance, a production floor work plan schedule; e. determining whether the schedule is efficient in utilization of materials and resources available; if so, outputting the production floor work plan schedule; f. if the computed production floor schedule is determined to be inefficient, repeating steps (d) and (e) until it is determined to be efficient.
    Type: Grant
    Filed: November 6, 2014
    Date of Patent: June 4, 2019
    Assignee: PLATAINE LTD.
    Inventors: Moshe Ben-Bassat, Avner Ben-Bassat, Eduard Goldner, Arie Shental
  • Publication number: 20160132049
    Abstract: The invention provides a computerized method for optimization of efficiency of a production floor producing three-dimensional products using two-dimensional cutting machines, the method comprising: a. receiving input parameters comprising job data, due dates, product design data, production floor resources available and inventory data; b. maintaining in memory manufacturing rules and objectives; c. assigning relative weights of importance to the input parameters and to the manufacturing rules and objectives; d. computing, based on the input parameters, on the manufacturing rules and objectives and on the relative weights of importance, a production floor work plan schedule; e. determining whether the schedule is efficient in utilization of materials and resources available; if so, outputting the production floor work plan schedule; f. if the computed production floor schedule is determined to be inefficient, repeating steps (d) and (e) until it is determined to be efficient.
    Type: Application
    Filed: November 6, 2014
    Publication date: May 12, 2016
    Applicant: Plataine Ltd
    Inventors: Moshe Ben-Bassat, Avner Ben-Bassat, Eduard Goldner, Arie Shental