Patents by Inventor Biwu HAN

Biwu HAN has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 12188198
    Abstract: A method for constructing a fixed monitoring pile for a mining area with a high phreatic water level includes: S1: prefabricating a pile foundation body, where the pile foundation body has a columnar structure, and a plurality of extension connection ports are provided at an outer side and a bottom of the pile foundation body; and S2: digging a foundation pit at a designated monitoring point; combining the pile foundation body with an extension body to form a fixed monitoring pile; placing the fixed monitoring pile into the foundation pit, such that a bottom extension body and a side extension body are inserted into the pit foundation; and backfilling and compacting. The method increases the affinity between the fixed monitoring pile and a loose layer and strengthens the fixed monitoring pile to prevent it from loosening, thereby improving measurement accuracy.
    Type: Grant
    Filed: April 16, 2024
    Date of Patent: January 7, 2025
    Assignees: PING AN COAL MINING ENGINEERING TECHNOLOGY RESEARCH INSTITUTE CO., LTD, HUAINAN MINING (GROUP) CO., LTD
    Inventors: Hao Li, Shikai An, Biwu Han, Hongxing Guo, Yanfei Xu, Yunfei Yu, Qingfa Liao, Derong Zhao, Wei Miao
  • Publication number: 20240328108
    Abstract: A method for constructing a fixed monitoring pile for a mining area with a high phreatic water level includes: S1: prefabricating a pile foundation body, where the pile foundation body has a columnar structure, and a plurality of extension connection ports are provided at an outer side and a bottom of the pile foundation body; and S2: digging a foundation pit at a designated monitoring point; combining the pile foundation body with an extension body to form a fixed monitoring pile; placing the fixed monitoring pile into the foundation pit, such that a bottom extension body and a side extension body are inserted into the pit foundation; and backfilling and compacting. The method increases the affinity between the fixed monitoring pile and a loose layer and strengthens the fixed monitoring pile to prevent it from loosening, thereby improving measurement accuracy.
    Type: Application
    Filed: April 16, 2024
    Publication date: October 3, 2024
    Applicants: PING AN COAL MINING ENGINEERING TECHNOLOGY RESEARCH INSTITUTE CO., LTD, HUAINAN MINING (GROUP) CO., LTD
    Inventors: Hao LI, Shikai AN, Biwu HAN, Hongxing GUO, Yanfei XU, Yunfei YU, Qingfa LIAO, Derong ZHAO, Wei MIAO