Patents by Inventor Bong Han

Bong Han has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20060087901
    Abstract: A device for controlling a temperature compensated self-refresh period clamps a self-refresh signal at high temperature over a specific temperature to maintain the self-refresh period, thereby removing dependency on temperature. In the device, an oscillating signal having a period varied depending on temperature change is generated below a specific temperature, and a period of a first period signal is compared with that of the oscillating signal applied from a temperature compensated self-refresh circuit unit over the specific temperature. When the period of the oscillating signal is shorter than that of the first signal, a pulse width of an oscillating strobe signal generated in response to a plurality of division signals each obtained by dividing the period of the oscillating signal at a predetermined ratio is controlled, so that an oscillating period of the temperature compensated self-refresh circuit unit is kept at a fixed state.
    Type: Application
    Filed: December 7, 2004
    Publication date: April 27, 2006
    Applicant: Hynix Semiconductor Inc.
    Inventors: Yun Hong, Bong Han
  • Publication number: 20050115164
    Abstract: This invention provides a method for constructing a high rise building having a core and a residence space around the core, the method including the steps of: (a) installing a steel-frame pillar on a shaft portion of the core; (b) connecting a girder to the steel-frame pillar, the girder includes an anchor-connecting member to which a steel-frame beam is connected, a portion of the anchor-connecting member being buried in a core wall; (c) assembling the steel-frame beam on the anchor-connecting member; (d) arranging reinforcing bars in a deck plate or a slab type mold installed on the steel-frame beam, and in the core wall; and (e) applying a slab concrete and a core concrete simultaneously or in this order. According to the present method, the quality of the core and slab structure is improved, while providing the construction safety and saving the construction costs.
    Type: Application
    Filed: March 31, 2003
    Publication date: June 2, 2005
    Inventor: Bong Han