Patents by Inventor Boyi SU

Boyi SU has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11801880
    Abstract: The present disclosure provides an operation adjustment method for a metro train in a unidirectional jam, including: generating a train operation routing scheme in the jam according to a jam position; setting priorities for turnaround stations; determining an affected train set; predicting, according to the affected train set, arrival times of each affected train at the turnaround stations of the different priorities; determining, according to the time, planned train service to be executed by the affected train after turning around; and acquiring a planned train service canceled during the jam, and allocating, according to the planned train service canceled during the jam, a train resource for train addition or storage. The present disclosure avoid the conventional complicated operation of manually determining the affected train one by one, and reasonably adds the extra passenger train to arrive at the station on the line for passenger carrying.
    Type: Grant
    Filed: June 11, 2021
    Date of Patent: October 31, 2023
    Assignee: BEIJING JIAOTONG UNIVERSITY
    Inventors: Shuai Su, Junqing Liu, Zhikai Wang, Boyi Su
  • Patent number: 11731674
    Abstract: The present disclosure provides an operation adjustment method and system for metro trains in a delay scenario. The method includes: acquiring basic parameters, current delay information and current online train information in a metro system; determining a detaining position of a departing train and an operation strategy of a waiting train according to the acquired; determining a next state of a running train according to the detaining position, the operation strategy, and the acquired; and optimally configuring an available rolling stock resource of the metro system according to the next state of the running train and operation data. The present disclosure can automatically adjust the operation diagram according to the delay information and reasonably change the operation plan of the rolling stock, so as to reduce influences of the delay on passengers and improve the actual fulfillment rate of the operation diagram.
    Type: Grant
    Filed: December 1, 2020
    Date of Patent: August 22, 2023
    Assignee: BEIJING JIAOTONG UNIVERSITY
    Inventors: Shuai Su, Boyi Su
  • Publication number: 20230166782
    Abstract: The present disclosure provides an operation adjustment method and system for metro trains in a delay scenario. The method includes: acquiring basic parameters, current delay information and current online train information in a metro system; determining a detaining position of a departing train and an operation strategy of a waiting train according to the acquired; determining a next state of a running train according to the detaining position, the operation strategy, and the acquired; and optimally configuring an available rolling stock resource of the metro system according to the next state of the running train and operation data. The present disclosure can automatically adjust the operation diagram according to the delay information and reasonably change the operation plan of the rolling stock, so as to reduce influences of the delay on passengers and improve the actual fulfillment rate of the operation diagram.
    Type: Application
    Filed: December 1, 2020
    Publication date: June 1, 2023
    Applicant: BEIJING JIAOTONG UNIVERSITY
    Inventors: SHUAI SU, BOYI SU
  • Publication number: 20230159071
    Abstract: The present disclosure provides an operation adjustment method for a metro train in a unidirectional jam, including: generating a train operation routing scheme in the jam according to a jam position; setting priorities for turnaround stations; determining an affected train set; predicting, according to the affected train set, arrival times of each affected train at the turnaround stations of the different priorities; determining, according to the time, planned train service to be executed by the affected train after turning around; and acquiring a planned train service canceled during the jam, and allocating, according to the planned train service canceled during the jam, a train resource for train addition or storage. The present disclosure avoid the conventional complicated operation of manually determining the affected train one by one, and reasonably adds the extra passenger train to arrive at the station on the line for passenger carrying.
    Type: Application
    Filed: June 11, 2021
    Publication date: May 25, 2023
    Inventors: Shuai Su, Junqing Liu, Zhikai Wang, Boyi Su
  • Patent number: 11531942
    Abstract: The disclosure provides an operation adjustment method and system for metro trains under train out of service. The method includes: acquiring basic parameters of a metro system, information of the train out of service and the online normal running trains, determining follow-up train services and current train timetables thereof, adjusting the current timetables according to predicted time to stop service of the train out of service to obtain initial adjusted train timetables, determining canceled planned train services and rolling stocks for executing remaining planned train services, and adjusting the initial adjusted train timetables according to planned train timetables of the cancelled planned train services. The disclosure can automatically adjust the train operation, and reasonably change the train timetables and the rolling stock circulation plan, thereby reducing influences of the train out of service, and improving the degree of automation of the metro system to adapt to refined management.
    Type: Grant
    Filed: June 24, 2021
    Date of Patent: December 20, 2022
    Assignee: BEIJING JIAOTONG UNIVERSITY
    Inventors: Shuai Su, Boyi Su, Zhikai Wang
  • Publication number: 20220277237
    Abstract: The present disclosure provides an operation adjustment method and system for metro trains under train out of service. The method includes: acquiring basic parameters of a metro system, information of the train out of service and information of the online normal running trains when the train has fault, determining follow-up train services of the train out of service and current train timetables thereof, adjusting the current timetables according to predicted time to stop service of the train out of service to obtain initial adjusted train timetables, determining canceled planned train services and rolling stocks for executing remaining planned train services, and adjusting the initial adjusted train timetables according to planned train timetables of the cancelled planned train services.
    Type: Application
    Filed: June 24, 2021
    Publication date: September 1, 2022
    Applicant: Beijing Jiaotong University
    Inventors: Shuai SU, Boyi SU, Zhikai WANG