Patents by Inventor Brian A. Janous
Brian A. Janous has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 10904160Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: GrantFiled: June 10, 2019Date of Patent: January 26, 2021Assignee: Microsoft Technology Licensing, LLCInventors: Todd R. Rawlings, Sean Michael James, David Thomas Gauthier, Ranveer Chandra, Mark B. Freeman, Lucas Neal Joppa, Brian A. Janous, Aneesh A. Mehta
-
Patent number: 10564688Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: GrantFiled: July 18, 2018Date of Patent: February 18, 2020Assignee: Microsoft Technology Licensing, LLCInventors: Sean Michael James, David Thomas Gauthier, Eric Clarence Peterson, Lucas Neal Joppa, Ranveer Chandra, Teddy L. Bennett, Todd R. Rawlings, Brian A. Janous
-
Publication number: 20190297023Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: ApplicationFiled: June 10, 2019Publication date: September 26, 2019Inventors: Todd R. Rawlings, Sean Michael James, David Thomas Gauthier, Ranveer Chandra, Mark B. Freeman, Lucas Neal Joppa, Brian A. Janous, Aneesh A. Mehta
-
Patent number: 10419320Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: GrantFiled: June 30, 2016Date of Patent: September 17, 2019Assignee: Microsoft Technology Licensing, LLCInventors: Sean Michael James, David Thomas Gauthier, Eric Clarence Peterson, Lucas Neal Joppa, Ranveer Chandra, Teddy L. Bennett, Todd R. Rawlings, Brian A. Janous
-
Patent number: 10361965Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: GrantFiled: June 30, 2016Date of Patent: July 23, 2019Assignee: Microsoft Technology Licensing, LLCInventors: Todd R. Rawlings, Sean Michael James, David Thomas Gauthier, Ranveer Chandra, Mark B. Freeman, Lucas Neal Joppa, Brian A. Janous, Aneesh A. Mehta
-
Publication number: 20180321726Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: ApplicationFiled: July 18, 2018Publication date: November 8, 2018Inventors: Sean Michael James, David Thomas Gauthier, Eric Clarence Peterson, Lucas Neal Joppa, Ranveer Chandra, Teddy L. Bennett, Todd R. Rawlings, Brian A. Janous
-
Patent number: 10103574Abstract: Technology for concurrently powering equipment from multiple power sources, and the control thereof is disclosed. One example implementation of the technology includes a first power supply that powers equipment from a first power source and a second power supply that also powers the equipment from a second power source while the equipment is being powered by the first power supply. A target direct current (DC) output voltage of at least one of the power supplies is changed, thereby changing a ratio of the power being drawn from the first power supply to the power being drawn from the second power supply.Type: GrantFiled: June 21, 2014Date of Patent: October 16, 2018Assignee: Microsoft Technology Licensing, LLCInventors: John J. Siegler, Brian A. Janous, Sean M. James
-
Patent number: 10048732Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: GrantFiled: June 30, 2016Date of Patent: August 14, 2018Assignee: Microsoft Technology Licensing, LLCInventors: Sean Michael James, David Thomas Gauthier, Eric Clarence Peterson, Lucas Neal Joppa, Ranveer Chandra, Teddy L. Bennett, Todd R. Rawlings, Brian A. Janous
-
Publication number: 20180199471Abstract: A method of managing a power supply system for a data center includes circulating a fluid in a cooling circuit, obtaining data regarding a server located in the data center using a sensor, controlling the transfer of heat energy from the server to the fluid based on the data, coupling the fluid to an electrochemical power generator, and generating power for the server using the fluid in the electrochemical power generator.Type: ApplicationFiled: March 6, 2018Publication date: July 12, 2018Applicant: Elwha LLCInventors: Christian L. Belady, Douglas M. Carmean, William Gates, Shaun L. Harris, Roderick A. Hyde, Muriel Y. Ishikawa, Sean M. James, Brian A. Janous, Jordin T. Kare, Jie Liu, Max N. Mankin, Gregory J. McKnight, Craig J. Mundie, Nathan P. Myhrvold, Tony S. Pan, Clarence T. Tegreene, Yaroslav A. Urzhumov, Charles Whitmer, Lowell L. Wood,, JR., Victoria Y.H. Wood
-
Patent number: 9949411Abstract: A power supply system for a data center includes a cooling circuit, an electrochemical power generator, a sensor, and a processor. The cooling circuit includes a fluid configured to receive heat energy generated by a server located in the data center. The electrochemical power generator is configured to receive and/or generate the fluid of the cooling circuit and to generate electrical energy for the server using the fluid. The sensor is configured to obtain data regarding the server. The processor is configured to control an amount of heat energy transferred from the server to the fluid based on the data.Type: GrantFiled: May 15, 2017Date of Patent: April 17, 2018Assignee: Elwha LLCInventors: Christian L. Belady, Douglas M. Carmean, William Gates, Shaun L. Harris, Roderick A. Hyde, Muriel Y. Ishikawa, Sean M. James, Brian A. Janous, Jordin T. Kare, Jie Liu, Max N. Mankin, Gregory J. McKnight, Craig J. Mundie, Nathan P. Myhrvold, Tony S. Pan, Clarence T. Tegreene, Yaroslav A. Urzhumov, Charles Whitmer, Lowell L. Wood, Jr., Victoria Y. H. Wood
-
Publication number: 20180006966Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: ApplicationFiled: June 30, 2016Publication date: January 4, 2018Inventors: Sean Michael James, David Thomas Gauthier, Eric Clarence Peterson, Lucas Neal Joppa, Ranveer Chandra, Teddy L. Bennett, Todd R. Rawlings, Brian A. Janous
-
Publication number: 20180006965Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: ApplicationFiled: June 30, 2016Publication date: January 4, 2018Inventors: Todd R. Rawlings, Sean Michael James, David Thomas Gauthier, Ranveer Chandra, Mark B. Freeman, Lucas Neal Joppa, Brian A. Janous, Aneesh A. Mehta
-
Publication number: 20180004265Abstract: Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management.Type: ApplicationFiled: June 30, 2016Publication date: January 4, 2018Inventors: Sean Michael James, David Thomas Gauthier, Eric Clarence Peterson, Lucas Neal Joppa, Ranveer Chandra, Teddy L. Bennett, Todd R. Rawlings, Brian A. Janous
-
Publication number: 20170251574Abstract: A power supply system for a data center includes a cooling circuit, an electrochemical power generator, a sensor, and a processor. The cooling circuit includes a fluid configured to receive heat energy generated by a server located in the data center. The electrochemical power generator is configured to receive and/or generate the fluid of the cooling circuit and to generate electrical energy for the server using the fluid. The sensor is configured to obtain data regarding the server. The processor is configured to control an amount of heat energy transferred from the server to the fluid based on the data.Type: ApplicationFiled: May 15, 2017Publication date: August 31, 2017Applicant: Elwha LLCInventors: Christian L. Belady, Douglas M. Carmean, William Gates, Shaun L. Harris, Roderick A. Hyde, Muriel Y. Ishikawa, Sean M. James, Brian A. Janous, Jordin T. Kare, Jie Liu, Max N. Mankin, Gregory J. McKnight, Craig J. Mundie, Nathan P. Myhrvold, Tony S. Pan, Clarence T. Tegreene, Yaroslav A. Urzhumov, Charles Whitmer, Lowell L. Wood,, JR., Victoria Y.H. Wood
-
Patent number: 9655285Abstract: A power supply system for a data center includes a cooling circuit, an electrochemical power generator, a sensor, and a processor. The cooling circuit includes a fluid configured to receive heat energy generated by a server located in the data center. The electrochemical power generator is configured to receive and/or generate the fluid of the cooling circuit and to generate electrical energy for the server using the fluid. The sensor is configured to obtain data regarding the server. The processor is configured to control an amount of heat energy transferred from the server to the fluid based on the data.Type: GrantFiled: November 28, 2014Date of Patent: May 16, 2017Assignee: Elwha LLCInventors: Christian L. Belady, Douglas M. Carmean, William Gates, Shaun L. Harris, Roderick A. Hyde, Muriel Y. Ishikawa, Sean M. James, Brian A. Janous, Jordin T. Kare, Jie Liu, Max N. Mankin, Gregory J. McKnight, Craig J. Mundie, Nathan P. Myhrvold, Tony S. Pan, Clarence T. Tegreene, Yaroslav A. Urzhumov, Charles Whitmer, Lowell L. Wood, Jr., Victoria Y. H. Wood
-
Publication number: 20160157388Abstract: A power supply system for a data center includes a cooling circuit, an electrochemical power generator, a sensor, and a processor. The cooling circuit includes a fluid configured to receive heat energy generated by a server located in the data center. The electrochemical power generator is configured to receive and/or generate the fluid of the cooling circuit and to generate electrical energy for the server using the fluid. The sensor is configured to obtain data regarding the server. The processor is configured to control an amount of heat energy transferred from the server to the fluid based on the data.Type: ApplicationFiled: November 28, 2014Publication date: June 2, 2016Applicant: Elwha LLCInventors: Christian L. Belady, Douglas M. Carmean, William Gates, Shaun L. Harris, Roderick A. Hyde, Muriel Y. Ishikawa, Sean M. James, Brian A. Janous, Jordin T. Kare, Jie Liu, Max N. Mankin, Gregory J. McKnight, Craig J. Mundie, Nathan P. Myhrvold, Tony S. Pan, Clarence T. Tegreene, Yaroslav A. Urzhumov, Charles Whitmer, Lowell L. Wood,, JR., Victoria Y.H. Wood
-
Publication number: 20150372538Abstract: Technology for concurrently powering equipment from multiple power sources, and the control thereof is disclosed. One example implementation of the technology includes a first power supply that powers equipment from a first power source and a second power supply that also powers the equipment from a second power source while the equipment is being powered by the first power supply. A target direct current (DC) output voltage of at least one of the power supplies is changed, thereby changing a ratio of the power being drawn from the first power supply to the power being drawn from the second power supply.Type: ApplicationFiled: June 21, 2014Publication date: December 24, 2015Inventors: John J. Siegler, Brian A. Janous, Sean M. James