Patents by Inventor Caihui Wu

Caihui Wu has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 12084854
    Abstract: A top-down construction method for a multi-storey basement with a full steel structure is provided, including: S1, constructing a diaphragm wall permanent structure; S2. conducting an open excavation, then constructing a first layer structural beam and slab; S3. conducting an underground excavation on an underground second layer earthwork, then constructing structural beam and slab and vertical shear wall on underground first layer; S4. excavating earthworks from an underground third layer to an underground N?1 layer, and constructing structural beams and slabs and vertical shear walls; S5. conducting the underground excavation on an underground N layer earthwork, and constructing a two-span structural steel beam; S6. conducting the underground excavation on earthworks of bottom plate layer, constructing remaining structural beams and slabs and vertical shear wall; S7. conducting the underground excavation on earthworks of bearing platform and water collection well; S8.
    Type: Grant
    Filed: October 18, 2023
    Date of Patent: September 10, 2024
    Assignee: China Construction Third Engineering Bureau Group South China Co., Ltd.
    Inventors: Xiuyi Wang, Xiaolu Deng, Caihui Wu, Bin Chen, Hailiang Peng, Weimin Wen
  • Publication number: 20240229451
    Abstract: A top-down construction method for a multi-storey basement with a full steel structure is provided, including: S1, constructing a diaphragm wall permanent structure; S2. conducting an open excavation, then constructing a first layer structural beam and slab; S3. conducting an underground excavation on an underground second layer earthwork, then constructing structural beam and slab and vertical shear wall on underground first layer; S4. excavating earthworks from an underground third layer to an underground N?1 layer, and constructing structural beams and slabs and vertical shear walls; S5. conducting the underground excavation on an underground N layer earthwork, and constructing a two-span structural steel beam; S6. conducting the underground excavation on earthworks of bottom plate layer, constructing remaining structural beams and slabs and vertical shear wall; S7. conducting the underground excavation on earthworks of bearing platform and water collection well; S8.
    Type: Application
    Filed: October 18, 2023
    Publication date: July 11, 2024
    Inventors: Xiuyi Wang, Xiaolu Deng, Caihui Wu, Bin Chen, Hailiang Peng, Weimin Wen
  • Publication number: 20240133175
    Abstract: A top-down construction method for a multi-storey basement with a full steel structure is provided, including: S1, constructing a diaphragm wall permanent structure; S2. conducting an open excavation, then constructing a first layer structural beam and slab; S3. conducting an underground excavation on an underground second layer earthwork, then constructing structural beam and slab and vertical shear wall on underground first layer; S4. excavating earthworks from an underground third layer to an underground N?1 layer, and constructing structural beams and slabs and vertical shear walls; S5. conducting the underground excavation on an underground N layer earthwork, and constructing a two-span structural steel beam; S6. conducting the underground excavation on earthworks of bottom plate layer, constructing remaining structural beams and slabs and vertical shear wall; S7. conducting the underground excavation on earthworks of bearing platform and water collection well; S8.
    Type: Application
    Filed: October 17, 2023
    Publication date: April 25, 2024
    Inventors: Xiuyi Wang, Xiaolu Deng, Caihui Wu, Bin Chen, Hailiang Peng, Weimin Wen