Patents by Inventor Caiping LU

Caiping LU has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10655465
    Abstract: Disclosed is a method for rock burst prevention by active support reinforcement and active pressure relief. The method comprises the following steps: A. rating a burst tendency based on a comprehensive index method: determining a zone as a general risk region or a mediate risk region by using a comprehensive index method; B. predicting a burst risk region and determining pressure relief borehole parameters in real time by using a drill cuttings method: determining borehole parameters of the general risk region and the mediate risk region; C. drilling holes after determining arrangement patterns of large-diameter pressure relief boreholes according to different burst risk levels; D. forming a “coal wall-bolt-grouting hole sealing” support reinforcement system through a roadway support system; and E. monitoring a pressure relief effect of the support reinforcement system: until a required effect of preventing bursts by pressure relief is achieved while the support is reinforced.
    Type: Grant
    Filed: August 3, 2018
    Date of Patent: May 19, 2020
    Assignees: China University of Mining and Technology, XUZHOU JINBO SAFETY AND TECHNOLOGY CO., LTD.
    Inventors: Caiping Lu, Heng Zhang, Yang Liu, Ding Li
  • Patent number: 10612379
    Abstract: The present invention discloses a combined automatic anti-explosion method for a gas drainage pipeline, comprising specific steps of: preparation of an anti-explosion installation piping; connection of the installation piping and the gas drainage pipeline; assembly of a porous foam material and an automatic control valve; installation of an automatic powder-spraying device and a signal analyzer; installation of a temperature sensor and a pressure sensor; and signal processing and automatic anti-explosion. According to the present invention, the porous foam material is located in a bottom groove of an arched pipeline when no gas explosion occurs in the gas drainage pipeline, without affecting the extraction effect of the gas drainage pipeline.
    Type: Grant
    Filed: August 3, 2018
    Date of Patent: April 7, 2020
    Assignees: China University of Mining and Technology, XUZHOU JINBO SAFETY AND TECHNOLOGY CO., LTD
    Inventors: Caiping Lu, Heng Zhang, Yang Liu, Ding Li
  • Publication number: 20200040726
    Abstract: The present invention discloses a combined automatic anti-explosion method for a gas drainage pipeline, comprising specific steps of: preparation of an anti-explosion installation piping; connection of the installation piping and the gas drainage pipeline; assembly of a porous foam material and an automatic control valve; installation of an automatic powder-spraying device and a signal analyzer; installation of a temperature sensor and a pressure sensor; and signal processing and automatic anti-explosion. According to the present invention, the porous foam material is located in a bottom groove of an arched pipeline when no gas explosion occurs in the gas drainage pipeline, without affecting the extraction effect of the gas drainage pipeline.
    Type: Application
    Filed: August 3, 2018
    Publication date: February 6, 2020
    Inventors: Caiping LU, Heng ZHANG, Yang LIU, Ding LI
  • Publication number: 20200032647
    Abstract: Disclosed is a method for rock burst prevention by active support reinforcement and active pressure relief. The method comprises the following steps: A. rating a burst tendency based on a comprehensive index method: determining a zone as a general risk region or a mediate risk region by using a comprehensive index method; B. predicting a burst risk region and determining pressure relief borehole parameters in real time by using a drill cuttings method: determining borehole parameters of the general risk region and the mediate risk region; C. drilling holes after determining arrangement patterns of large-diameter pressure relief boreholes according to different burst risk levels; D. forming a “coal wall-bolt-grouting hole sealing” support reinforcement system through a roadway support system; and E. monitoring a pressure relief effect of the support reinforcement system: until a required effect of preventing bursts by pressure relief is achieved while the support is reinforced.
    Type: Application
    Filed: August 3, 2018
    Publication date: January 30, 2020
    Inventors: Caiping LU, Heng ZHANG, Yang LIU, Ding LI