Patents by Inventor Carl Iszkula

Carl Iszkula has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 7072747
    Abstract: A method of controlling operation of a train (T) for passage of the train through a tunnel. The train has a plurality of locomotives (L1-Ln) pulling the train. The position of the lead locomotive relative to the tunnel entrance is determined, as is the amount of time before the train enters the tunnel. Each locomotive is separately configured for passage through the tunnel as a function of performance characteristics of the locomotive and the locomotive's current operating status, as the train approaches the tunnel. Once the train enters the tunnel, the performance characteristics of each locomotive are continually monitored. The performance requirements for one or more of the locomotives are then dynamically changed as a function of conditions within the tunnel and the current performance characteristics of each locomotive. This is done to maintain a sufficient combined performance capability from the locomotives to move the train through the tunnel.
    Type: Grant
    Filed: November 20, 2003
    Date of Patent: July 4, 2006
    Assignee: General Electric Company
    Inventors: Robert A. Armbruster, Wolfgang Daum, Scott M. Branka, Carl Iszkula, Brian Lawry
  • Publication number: 20050109882
    Abstract: A method of controlling operation of a train (T) for passage of the train through a tunnel. The train has a plurality of locomotives (L1-Ln) pulling the train. The position of the lead locomotive relative to the tunnel entrance is determined, as is the amount of time before the train enters the tunnel. Each locomotive is separately configured for passage through the tunnel as a function of performance characteristics of the locomotive and the locomotive's current operating status, as the train approaches the tunnel. Once the train enters the tunnel, the performance characteristics of each locomotive are continually monitored. The performance requirements for one or more of the locomotives are then dynamically changed as a function of conditions within the tunnel and the current performance characteristics of each locomotive. This is done to maintain a sufficient combined performance capability from the locomotives to move the train through the tunnel.
    Type: Application
    Filed: November 20, 2003
    Publication date: May 26, 2005
    Inventors: Robert Armbruster, Wolfgang Daum, Scott Branka, Carl Iszkula, Brian Lawry