Patents by Inventor CHONGQING KANG

CHONGQING KANG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20190147464
    Abstract: Disclosed is a method for clearing electric quantity market, including: acquiring a RSI of each of a plurality of market entities; judging whether a market power exceeds a threshold according to the RSI of the market entity; adjusting an electric quantity declared by a power generation entity and a market demand electric quantity; evaluating the market power under a new environment and judging whether the market power meets a preset condition; adjusting a quoting function of each of the plurality of market entities in a CTCP and acquiring an adjustment situation; clearing transactions of each of the plurality of market entities in the CTCP according to the adjustment situation and acquiring a market clearing situation of the CTCP; distributing a CPSP in the preset electric quantity market according to the market clearing situation of the CTCP; and settling and clearing transactions according to a clearing amount and a clearing price.
    Type: Application
    Filed: July 6, 2018
    Publication date: May 16, 2019
    Inventors: Qixin CHEN, Hongye GUO, Qing XIA, Chongqing KANG
  • Patent number: 10289765
    Abstract: The present disclosure provides a fast model generating and solving method for security-constrained power system operation simulation, which includes: obtaining information of all branches and nodes which are involved during operation simulation time period, calculating original-node impedance matrix, load shifting distribution factor original matrix and generator shifting distribution factor original matrix of all involved branches; correcting the load shifting distribution factor original matrix and the generator shifting distribution factor original matrix according to the on-off state of branches; obtaining output of each generator unit at each time period according to no-security-constraint unit commitment model, and determining overload of each branch again; solving iteratively until no branch is overloaded, and obtaining output of each generator unit at each time period under security constraint of operation simulation for the current simulation day, performing operating simulation for the rest simulat
    Type: Grant
    Filed: August 26, 2016
    Date of Patent: May 14, 2019
    Assignee: TSINGHUA UNIVERSITY
    Inventors: Ning Zhang, Chongqing Kang, Qing Xia, Ershun Du
  • Patent number: 10203312
    Abstract: The present disclosure provides a system for measuring carbon emissions in a power system. The system includes: generation carbon meters, distributed respectively in generators in the power system; network carbon meters, distributed respectively in nodes in the power system; consumption carbon meters, distributed respectively in consumers in the power system; and a center server, in which each carbon meter is configured to collect data for measuring the carbon emissions. The center server is configured to acquire the collected data and to measure the carbon emissions according to the acquired data, and to send measuring results to the corresponding carbon meter. Then each carbon meter is further configured to display according to the measuring results. The carbon emission may be measured in real time.
    Type: Grant
    Filed: March 15, 2017
    Date of Patent: February 12, 2019
    Assignee: TSINGHUA UNIVERSITY
    Inventors: Chongqing Kang, Yaohua Cheng, Ning Zhang, Qixin Chen, Qing Xia
  • Publication number: 20180375334
    Abstract: The present disclosure provides a method and an apparatus for photovoltaic power forecast based on numerical weather prediction.
    Type: Application
    Filed: May 30, 2018
    Publication date: December 27, 2018
    Inventors: Haiwang ZHONG, Jianxiao WANG, Yang WANG, Xiaowen LAI, Qing XIA, Chongqing KANG
  • Publication number: 20180067089
    Abstract: The present disclosure provides a system for measuring carbon emissions in a power system. The system includes: generation carbon meters, distributed respectively in generators in the power system; network carbon meters, distributed respectively in nodes in the power system; consumption carbon meters, distributed respectively in consumers in the power system; and a center server, in which each carbon meter is configured to collect data for measuring the carbon emissions. The center server is configured to acquire the collected data and to measure the carbon emissions according to the acquired data, and to send measuring results to the corresponding carbon meter. Then each carbon meter is further configured to display according to the measuring results. The carbon emission may be measured in real time.
    Type: Application
    Filed: March 15, 2017
    Publication date: March 8, 2018
    Inventors: Chongqing KANG, Yaohua CHENG, Ning ZHANG, Qixin CHEN, Qing XIA
  • Patent number: 9768614
    Abstract: An optimal control method and apparatus for a power system are provided. The method includes: obtaining ancillary service bidding data; establishing a power system optimal control model according to the ancillary service bidding data; solving the power system optimal control model to obtain optimal frequency regulation capacities and optimal spinning reserve capacities; sending the optimal frequency regulation capacities and the optimal spinning reserve capacities to generators such that the generators adjust their active powers to provide ancillary services for the power system.
    Type: Grant
    Filed: March 18, 2015
    Date of Patent: September 19, 2017
    Assignee: Tsinghua University
    Inventors: Haiwang Zhong, Qing Xia, Chongqing Kang, Qixin Chen
  • Publication number: 20170083648
    Abstract: The present disclosure provides a fast model generating and solving method for security-constrained power system operation simulation, which includes: obtaining information of all branches and nodes which are involved during operation simulation time period, calculating original-node impedance matrix, load shifting distribution factor original matrix and generator shifting distribution factor original matrix of all involved branches; correcting the load shifting distribution factor original matrix and the generator shifting distribution factor original matrix according to the on-off state of branches; obtaining output of each generator unit at each time period according to no-security-constraint unit commitment model, and determining overload of each branch again; solving iteratively until no branch is overloaded, and obtaining output of each generator unit at each time period under security constraint of operation simulation for the current simulation day, performing operating simulation for the rest simulat
    Type: Application
    Filed: August 26, 2016
    Publication date: March 23, 2017
    Inventors: Ning ZHANG, Chongqing KANG, Qing XIA, Ershun DU
  • Publication number: 20150268644
    Abstract: An optimal control method and apparatus for a power system are provided. The method includes: obtaining ancillary service bidding data; establishing a power system optimal control model according to the ancillary service bidding data; solving the power system optimal control model to obtain optimal frequency regulation capacities and optimal spinning reserve capacities; sending the optimal frequency regulation capacities and the optimal spinning reserve capacities to generators such that the generators adjust their active powers to provide ancillary services for the power system.
    Type: Application
    Filed: March 18, 2015
    Publication date: September 24, 2015
    Inventors: HAIWANG ZHONG, QING XIA, CHONGQING KANG, QIXIN CHEN