Patents by Inventor Christian Ziemens
Christian Ziemens has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 12149076Abstract: An energy supply device for supplying electric loads with electric energy, includes a DC link; a first mains connection to which a first AC voltage grid can be connected as intended; a first rectifier which is designed to rectify an AC voltage corresponding to an AC voltage across the first mains connection or based thereon and to feed the rectified voltage into the DC link; a second mains connection to which a second AC voltage grid can be connected as intended; a second rectifier which is designed to rectify an AC voltage corresponding to an AC voltage across the second mains connection or based thereon; a controllable DC-to-DC converter to a first side of which a voltage rectified by means of the second rectifier is applied, and a second side of which is connected to the DC link; a first current converter which is fed from the DC link and is designed to supply a first electric load with electric energy; a power measuring apparatus which is designed to measure electric power consumed at the first mains connType: GrantFiled: December 6, 2021Date of Patent: November 19, 2024Assignees: Putzmeister Engineering GmbH, REFU Drive GmbHInventors: Rolf Wirfs, Georg Dielmann, Johannes Demling, Sebastian Kerner, Christian Ziemens, Werner Tausch
-
Publication number: 20240310842Abstract: A work machine includes a moving boom, an ultra-wideband system (UWB) having one UWB tag and a number of UWB anchors, a marking apparatus that can be handled by a user and can be operated by the user, and a control unit. The UWB tag is mounted on the marking apparatus. The control unit is designed so as, when the marking apparatus is operated, to store a position of the UWB tag ascertained by way of the UWB system at the time of the operation and to control the operation of the mobile work machine on the basis of the ascertained position.Type: ApplicationFiled: July 5, 2022Publication date: September 19, 2024Inventors: Nils BUKSCHAT, Tobias HUTH, Christian ZIEMENS, Hans-Bernd DUERR, Matthias BRAUN
-
Publication number: 20240063638Abstract: An energy supply device for supplying electric loads with electric energy, includes a DC link; a first mains connection to which a first AC voltage grid can be connected as intended; a first rectifier which is designed to rectify an AC voltage corresponding to an AC voltage across the first mains connection or based thereon and to feed the rectified voltage into the DC link; a second mains connection to which a second AC voltage grid can be connected as intended; a second rectifier which is designed to rectify an AC voltage corresponding to an AC voltage across the second mains connection or based thereon; a controllable DC-to-DC converter to a first side of which a voltage rectified by means of the second rectifier is applied, and a second side of which is connected to the DC link; a first current converter which is fed from the DC link and is designed to supply a first electric load with electric energy; a power measuring apparatus which is designed to measure electric power consumed at the first mains connType: ApplicationFiled: December 6, 2021Publication date: February 22, 2024Inventors: Rolf WIRFS, Georg DIELMANN, Johannes DEMLING, Sebastian KERNER, Christian ZIEMENS, Werner TAUSCH
-
Patent number: 11761464Abstract: A method controls the movement of a boom, wherein the boom is moved by a plurality of hydraulic drives. Each hydraulic drive is fed with a hydraulic medium, the pressure and/or volume flow of which is adjustable. The method predefines a desired direction of movement and a desired speed of a boom tip; predictively calculates a pressure and/or a volume flow required for each of the hydraulic drives that are required for the desired direction of movement and desired speed; subsequently generates a supply pressure depending on the predictively calculated pressures and/or subsequently generating a supply volume flow as a function of the predictively calculated volume flows; and subsequently feeds the hydraulic drives required for the desired direction of movement and desired speed with the hydraulic medium having a respective feed pressure and/or a respective feed volume flow such that the boom tip moves in the desired direction of movement at the desired speed.Type: GrantFiled: April 17, 2019Date of Patent: September 19, 2023Assignee: Putzmeister Engineering GmbHInventors: Christian Ziemens, Francisco Martin Brugue
-
Publication number: 20230026231Abstract: A method operates a thick-matter pump having a thick-matter delivery system and a hydraulic drive system. The thick-matter delivery system delivers thick matter with a variably settable delivery volumetric flow rate for driving the thick-matter delivery system. The hydraulic drive system has: a hydraulic circuit having a hydraulic fluid, a variably operable first drive pump, and a variably operable second drive pump. The first drive pump is designed for variable operation with at least one variably settable first pump parameter and the second drive pump is designed for variable operation, independent of the first pump parameter, with at least one variably settable second pump parameter for generating a variably settable overall drive volumetric flow rate of the hydraulic fluid in the hydraulic circuit.Type: ApplicationFiled: January 4, 2021Publication date: January 26, 2023Inventors: Frederik KORT, Christian ZIEMENS
-
Patent number: 11434936Abstract: A hydraulic system having a hydraulic pump, having a plurality of hydraulic loads and having a plurality of load-sensing valves for adjusting the pump performance of the hydraulic pump. An association unit is arranged between the hydraulic pump and the hydraulic loads and in a first switched state defines a first hydraulic path between the hydraulic pump and the hydraulic loads and in a second switched state defines a second hydraulic path between the hydraulic pump and the hydraulic loads. The system comprises a controller, which processes a state value of a hydraulic load as an input variable and which determines a control signal for the switched state of the association unit. The invention also relates to a method for controlling a hydraulic system.Type: GrantFiled: July 25, 2019Date of Patent: September 6, 2022Assignee: Putzmeister Engineering GmbHInventor: Christian Ziemens
-
Publication number: 20220235565Abstract: The invention relates to a method for detecting and verifying a working position of a mobile concrete pump, said method comprising the steps: a) setting up and at least partially supporting the concrete pump at a set-up position; b) detecting position-related data of a working position, wherein the working position is located in a region of a surface to be concreted which is remote from the set-up position; c) comparing the position-related data with a theoretical working area resulting from the set support; and d) outputting a signal as to whether the working position can be operated. This makes it possible to set up or support a mobile concrete pump in the most optimal manner possible. The invention also relates to a method for determining a suitable support setting, a measurement device, and a mobile concrete pump.Type: ApplicationFiled: July 8, 2020Publication date: July 28, 2022Inventors: Michaela Schuerholz, Gerald Reichenbach, Tobias Huth, Christian Ziemens
-
Publication number: 20210231140Abstract: A method controls the movement of a boom, wherein the boom is moved by a plurality of hydraulic drives. Each hydraulic drive is fed with a hydraulic medium, the pressure and/or volume flow of which is adjustable. The method predefines a desired direction of movement and a desired speed of a boom tip; predictively calculates a pressure and/or a volume flow required for each of the hydraulic drives that are required for the desired direction of movement and desired speed; subsequently generates a supply pressure depending on the predictively calculated pressures and/or subsequently generating a supply volume flow as a function of the predictively calculated volume flows; and subsequently feeds the hydraulic drives required for the desired direction of movement and desired speed with the hydraulic medium having a respective feed pressure and/or a respective feed volume flow such that the boom tip moves in the desired direction of movement at the desired speed.Type: ApplicationFiled: April 17, 2019Publication date: July 29, 2021Inventors: Christian ZIEMENS, Francisco Martin BRUGUE
-
Publication number: 20210190103Abstract: A hydraulic system having a hydraulic pump, having a plurality of hydraulic loads and having a plurality of load-sensing valves for adjusting the pump performance of the hydraulic pump. An association unit is arranged between the hydraulic pump and the hydraulic loads and in a first switched state defines a first hydraulic path between the hydraulic pump and the hydraulic loads and in a second switched state defines a second hydraulic path between the hydraulic pump and the hydraulic loads. The system comprises a controller, which processes a state value of a hydraulic load as an input variable and which determines a control signal for the switched state of the association unit. The invention also relates to a method for controlling a hydraulic system.Type: ApplicationFiled: July 25, 2019Publication date: June 24, 2021Inventor: Christian Ziemens