  • Publication number: 20120153639
    Abstract: A method for meeting both base-load and peak-load demand in a power production facility. By integrating a Fischer-Tropsch (FT) hydrocarbon production facility with an electrical power generating facility, peak-load power demand can be met by reducing the temperature of the FT reactor thereby increasing the quantity of tail gases and using FT tail gases to fuel a gas turbine generator set. The method enables rapid power response and allows the synthesis gas generating units and the FT units to operate with constant flow rates.
    Type: Application
    Filed: February 27, 2012
    Publication date: June 21, 2012
    Applicant: RENTECH, INC.
    Inventors: Dennis L. YAKOBSON, Claude C. Corkadel, III, Charles B. Benham, Belma Demirel, Peter S. Pedersen
  • Patent number: 8146368
    Abstract: A method for meeting both base-load and peak-load demand in a power production facility. By integrating a Fischer-Tropsch (FT) hydrocarbon production facility with an electrical power generating facility, peak-load power demand can be met by reducing the temperature of the FT reactor thereby increasing the quantity of tail gases and using FT tail gases to fuel a gas turbine generator set. The method enables rapid power response and allows the synthesis gas generating units and the FT units to operate with constant flow rates.
    Type: Grant
    Filed: December 1, 2009
    Date of Patent: April 3, 2012
    Assignee: Rentech, Inc.
    Inventors: Dennis L. Yakobson, Claude C. Corkadel, III, Charles B. Benham, Belma Demirel, Peter S. Pedersen
  • Publication number: 20100109338
    Abstract: A method for meeting both base-load and peak-load demand in a power production facility. By integrating a Fischer-Tropsch (FT) hydrocarbon production facility with an electrical power generating facility, peak-load power demand can be met by reducing the temperature of the FT reactor thereby increasing the quantity of tail gases and using FT tail gases to fuel a gas turbine generator set. The method enables rapid power response and allows the synthesis gas generating units and the FT units to operate with constant flow rates.
    Type: Application
    Filed: December 1, 2009
    Publication date: May 6, 2010
    Applicant: RENTECH, INC.
    Inventors: Dennis L. Yakobson, Claude C. Corkadel, III, Charles B. Benham, Belma Demirel, Peter S. Pedersen
  • Patent number: 7644587
    Abstract: A method for meeting both base-load and peak-load demand in a power production facility. By integrating a Fischer-Tropsch (FT) hydrocarbon production facility with an electrical power generating facility, peak-load power demand can be met by reducing the temperature of the FT reactor thereby increasing the quantity of tail gases and using FT tail gases to fuel a gas turbine generator set. The method enables rapid power response and allows the synthesis gas generating units and the FT units to operate with constant flow rates.
    Type: Grant
    Filed: December 21, 2005
    Date of Patent: January 12, 2010
    Assignee: Rentech, Inc.
    Inventors: Dennis L. Yakobson, Claude C. Corkadel, III, Charles B. Benham, Belma Demirel, Peter S. Pedersen