Patent number: 11949232Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexboxes, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed at a lower cost at a flexible datacenter, the computational operation is instead routed to the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably shared a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions.Type: GrantFiled: February 6, 2023Date of Patent: April 2, 2024Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Publication number: 20230275432Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. A queue system may be used to organize computational operations waiting for distribution to either the critical datacenter or the flexible datacenter.Type: ApplicationFiled: May 4, 2023Publication date: August 31, 2023Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, JR.
-
Publication number: 20230259192Abstract: In an example embodiment, a distributed power control system can include a datacenter and a remote master control system. The datacenter can include (i) computing systems, (ii) a behind-the-meter power input system configured to receive power from a behind-the-meter power source and deliver power to the computing systems, and (iii) a datacenter control system configured to control the computing systems and the behind-the-meter power input system. The remote master control system can be configured to issue instructions to the datacenter that affect an amount of behind-the-meter power consumed by the datacenter. The datacenter control system can receive, from a local station control system configured to at least partially control the behind-the-meter power source, a directive for the datacenter to ramp-down power consumption, and in response to receiving the directive, cause the computing systems to perform a set of predetermined operations correlated with the directive.Type: ApplicationFiled: April 25, 2023Publication date: August 17, 2023Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, Jr.
-
Patent number: 11682902Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. A queue system may be used to organize computational operations waiting for distribution to either the critical datacenter or the flexible datacenter.Type: GrantFiled: May 23, 2022Date of Patent: June 20, 2023Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Publication number: 20230185346Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. In some situations, a computational operation is supported by multiple datacenters in a redundant arrangement, such as multiple flexible datacenters.Type: ApplicationFiled: February 6, 2023Publication date: June 15, 2023Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, Jr.
-
Publication number: 20230178995Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexboxes, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed at a lower cost at a flexible datacenter, the computational operation is instead routed to the flexible datacenters for performance The critical datacenter and flexible datacenters preferably shared a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions.Type: ApplicationFiled: February 6, 2023Publication date: June 8, 2023Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, JR.
-
Patent number: 11669144Abstract: A distributed power control system is provided. The system can include a datacenter and a remote master control system. The datacenter can include (i) computing systems, (ii) a behind-the-meter power input system configured to receive power from a behind-the-meter power source and deliver power to the computing systems, and (iii) a datacenter control system configured to control the computing systems and the behind-the-meter power input system. The remote master control system can be configured to issue instructions to the datacenter that affect an amount of behind-the-meter power consumed by the datacenter. The datacenter control system can receive, from a local station control system configured to at least partially control the behind-the-meter power source, a directive for the datacenter to ramp-down power consumption, and in response to receiving the directive, cause the computing systems to perform a set of predetermined operations correlated with the directive.Type: GrantFiled: March 11, 2022Date of Patent: June 6, 2023Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Patent number: 11650639Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. In some situations, a computational operation is supported by multiple datacenters in a redundant arrangement, such as multiple flexible datacenters.Type: GrantFiled: February 16, 2022Date of Patent: May 16, 2023Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Publication number: 20230121669Abstract: A system includes a flexible datacenter and a power generation unit that generates power on an intermittent basis. The flexible datacenter is coupled to both the power generation unit and grid power through a local station. By various methods, a control system may detect a transition of the power generation unit into a stand-down mode and selectively direct grid power delivery to always-on systems in the flexible datacenter.Type: ApplicationFiled: December 15, 2022Publication date: April 20, 2023Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, JR.
-
Patent number: 11611219Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexboxes, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed at a lower cost at a flexible datacenter, the computational operation is instead routed to the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably shared a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions.Type: GrantFiled: June 7, 2021Date of Patent: March 21, 2023Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Publication number: 20220407350Abstract: A system includes a flexible datacenter and an energy storage unit that receives and stores power from one or more grid-scale power generation units. The energy storage unit and the flexible datacenter are connected behind-the-meter to the power generation unit(s) such that they are not typically subject to grid transmission and distribution fees. By various methods, behind-the-meter power is routed between the power generation unit(s), the energy storage unit, the flexible datacenter, and/or the grid based on a variety of conditions and operational directives.Type: ApplicationFiled: August 26, 2022Publication date: December 22, 2022Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, JR.
-
Publication number: 20220294219Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. A queue system may be used to organize computational operations waiting for distribution to either the critical datacenter or the flexible datacenter.Type: ApplicationFiled: May 23, 2022Publication date: September 15, 2022Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, JR.
-
Patent number: 11431195Abstract: A system includes a flexible datacenter and an energy storage unit that receives and stores power from one or more grid-scale power generation units. The energy storage unit and the flexible datacenter are connected behind-the-meter to the power generation unit(s) such that they are not typically subject to grid transmission and distribution fees. By various methods, behind-the-meter power is routed between the power generation unit(s), the energy storage unit, the flexible datacenter, and/or the grid based on a variety of conditions and operational directives.Type: GrantFiled: December 21, 2020Date of Patent: August 30, 2022Assignee: Lancium LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Publication number: 20220197363Abstract: In an example embodiment, a distributed power control system can include a datacenter and a remote master control system. The datacenter can include (i) computing systems, (ii) a behind-the-meter power input system configured to receive power from a behind-the-meter power source and deliver power to the computing systems, and (iii) a datacenter control system configured to control the computing systems and the behind-the-meter power input system. The remote master control system can be configured to issue instructions to the datacenter that affect an amount of behind-the-meter power consumed by the datacenter. The datacenter control system can receive, from a local station control system configured to at least partially control the behind-the-meter power source, a directive for the datacenter to ramp-down power consumption, and in response to receiving the directive, cause the computing systems to perform a set of predetermined operations correlated with the directive.Type: ApplicationFiled: March 11, 2022Publication date: June 23, 2022Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, JR.
-
Publication number: 20220171449Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. In some situations, a computational operation is supported by multiple datacenters in a redundant arrangement, such as multiple flexible datacenters.Type: ApplicationFiled: February 16, 2022Publication date: June 2, 2022Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, JR.
-
Patent number: 11342746Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. A queue system may be used to organize computational operations waiting for distribution to either the critical datacenter or the flexible datacenter.Type: GrantFiled: September 17, 2019Date of Patent: May 24, 2022Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Patent number: 11283261Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. A queue system may be used to organize computational operations waiting for distribution to either the critical datacenter or the flexible datacenter.Type: GrantFiled: July 29, 2019Date of Patent: March 22, 2022Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Publication number: 20220085603Abstract: A system includes a behind-the-meter vehicle charging station. The vehicle charging station includes a vehicle-charging interface configured to supply the vehicle-charging power to a vehicle. The vehicle charging station further includes a communication unit configured to trigger a notification in response to a change in power availability. Additionally, the system includes a control system configured to modulate power delivery to the behind-the-meter charging station based on one or more monitored power system conditions or an operational directive.Type: ApplicationFiled: September 20, 2021Publication date: March 17, 2022Inventors: Michael T. MCNAMARA, David J. HENSON, Raymond E. CLINE, JR.
-
Patent number: 11275427Abstract: In an example embodiment, a distributed power control system can include a datacenter and a remote master control system. The datacenter can include (i) computing systems, (ii) a behind-the-meter power input system configured to receive power from a behind-the-meter power source and deliver power to the computing systems, and (iii) a datacenter control system configured to control the computing systems and the behind-the-meter power input system. The remote master control system can be configured to issue instructions to the datacenter that affect an amount of behind-the-meter power consumed by the datacenter. The datacenter control system can receive, from a local station control system configured to at least partially control the behind-the-meter power source, a directive for the datacenter to ramp-down power consumption, and in response to receiving the directive, cause the computing systems to perform a set of predetermined operations correlated with the directive.Type: GrantFiled: May 24, 2021Date of Patent: March 15, 2022Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.
-
Patent number: 11256320Abstract: Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance. The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. In some situations, a computational operation is supported by multiple datacenters in a redundant arrangement, such as multiple flexible datacenters.Type: GrantFiled: October 21, 2019Date of Patent: February 22, 2022Assignee: LANCIUM LLCInventors: Michael T. McNamara, David J. Henson, Raymond E. Cline, Jr.