Patents by Inventor Deng Lin

Deng Lin has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 12760486
    Abstract: Provided is a large-scale offshore hydraulic piling hammer including: a hammer housing and a ram in the hammer housing; at least one hydraulic assembly capable of driving the ram to move axially along hammer housing to strike an anvil and disposed between hammer housing and ram; a pile sleeve including an upper pile sleeve and a lower pile sleeve; and an anvil disposed in upper pile sleeve. An increased-diameter ring is disposed at the bottom of anvil in the upper pile sleeve and has a first mounting groove for mounting anvil. A first mounting cavity is formed between an inner cavity of increased-diameter ring and anvil. A second mounting cavity is formed between a bottom surface of increased-diameter ring and an inner wall of lower pile sleeve. The second mounting cavity has a diameter greater than that of the first mounting cavity.
    Type: Grant
    Filed: May 22, 2025
    Date of Patent: October 13, 2026
    Assignee: Zhejiang Yongan Construction Machinery Co., Ltd.
    Inventors: Deng Lin, Haiqiang Wang, Jian Wei, Yifeng Lu, Wen Lin, Jinduo Wang, Jian Zhang
  • Publication number: 20250361691
    Abstract: Provided is a large-scale offshore hydraulic piling hammer including: a hammer housing and a ram in the hammer housing; at least one hydraulic assembly capable of driving the ram to move axially along hammer housing to strike an anvil and disposed between hammer housing and ram; a pile sleeve including an upper pile sleeve and a lower pile sleeve; and an anvil disposed in upper pile sleeve. An increased-diameter ring is disposed at the bottom of anvil in the upper pile sleeve and has a first mounting groove for mounting anvil. A first mounting cavity is formed between an inner cavity of increased-diameter ring and anvil. A second mounting cavity is formed between a bottom surface of increased-diameter ring and an inner wall of lower pile sleeve. The second mounting cavity has a diameter greater than that of the first mounting cavity.
    Type: Application
    Filed: May 22, 2025
    Publication date: November 27, 2025
    Inventors: Deng LIN, Haiqiang WANG, Jian WEI, Yifeng LU, Wen LIN, Jinduo WANG, Jian ZHANG
  • Patent number: 11866903
    Abstract: An electrically-driven vibratory hammer is provided, which has a power supply, is wirelessly controlled, can increase the vibration amplitude and can detect the data of the vibratory hammer in real time. Through the arrangement of storage batteries, workers can also directly work through the built-in storage batteries during construction in some remote areas, without laying additional lines, and the cost is reduced. Furthermore, a movable toothed plate previously driven by a hydraulic cylinder is changed into a clamping electric cylinder capable of directly working through the storage batteries, so that a pile body can be directly clamped without an external hydraulic pump station during working. Through the improvement, the workers can directly work without additionally laying basic equipment during construction in construction sites with incomplete facilities, the construction period is shortened, the construction cost is saved, intelligent control is achieved.
    Type: Grant
    Filed: June 17, 2022
    Date of Patent: January 9, 2024
    Assignee: Zhejiang Yongan Construction Machinery Co., Ltd.
    Inventors: Deng Lin, Yuanwan Chen, Jian Zhang, Zhenyu Yang, Zengzeng Chen, Yachun Zhang, Min Jia
  • Publication number: 20230002996
    Abstract: An electrically-driven vibratory hammer is provided, which has a power supply, is wirelessly controlled, can increase the vibration amplitude and can detect the data of the vibratory hammer in real time. Through the arrangement of storage batteries, workers can also directly work through the built-in storage batteries during construction in some remote areas, without laying additional lines, and the cost is reduced. Furthermore, a movable toothed plate previously driven by a hydraulic cylinder is changed into a clamping electric cylinder capable of directly working through the storage batteries, so that a pile body can be directly clamped without an external hydraulic pump station during working. Through the improvement, the workers can directly work without additionally laying basic equipment during construction in construction sites with incomplete facilities, the construction period is shortened, the construction cost is saved, intelligent control is achieved.
    Type: Application
    Filed: June 17, 2022
    Publication date: January 5, 2023
    Inventors: Deng Lin, Yuanwan Chen, Jian Zhang, Zhenyu Yang, Zengzeng Chen, Yachun Zhang, Min Jia