Patents by Inventor Dennis JONK

Dennis JONK has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9127774
    Abstract: In a system for optimizing natural gas production in response to real-time variations in wellbore parameters, a PLC or other wellsite intelligence technology is used to monitor liquid and gas production from the wellbore under friction-loaded conditions. Using baseline production data obtained during production tests, the PLC determines and initiates the appropriate operating mode for the wellbore to optimize a selected production criterion to suit measured wellbore parameters. The operating mode either a continuous clean-out mode, in which gas is continuously injected into the wellbore to control liquid loading, or an intermittent clean-out, in which liquid loading is regulated by intermittent gas injection. In preferred embodiments, the system uses bladder-type control valves having upstream and downstream solenoids, to control production tubing flow rate within a range between upper and lower set points.
    Type: Grant
    Filed: August 30, 2012
    Date of Patent: September 8, 2015
    Assignee: OPTIMUM PRODUCTION TECHNOLOGIES INC.
    Inventors: Glenn Wilde, Dennis Jonk
  • Publication number: 20120318523
    Abstract: In a system for optimizing natural gas production in response to real-time variations in wellbore parameters, a PLC or other wellsite intelligence technology is used to monitor liquid and gas production from the wellbore under friction-loaded conditions. Using baseline production data obtained during production tests, the PLC determines and initiates the appropriate operating mode for the wellbore to optimize a selected production criterion to suit measured wellbore parameters. The operating mode either a continuous clean-out mode, in which gas is continuously injected into the wellbore to control liquid loading, or an intermittent clean-out, in which liquid loading is regulated by intermittent gas injection. In preferred embodiments, the system uses bladder-type control valves having upstream and downstream solenoids, to control production tubing flow rate within a range between upper and lower set points.
    Type: Application
    Filed: August 30, 2012
    Publication date: December 20, 2012
    Applicant: OPTIMUM PRODUCTION TECHNOLOGIES INC.
    Inventors: Glenn WILDE, Dennis JONK
  • Publication number: 20110004352
    Abstract: In a system for optimizing natural gas production in response to real-time variations in wellbore parameters, a PLC or other wellsite intelligence technology is used to monitor liquid and gas production from the wellbore under friction-loaded conditions. Using baseline production data obtained during production tests, the PLC determines and initiates the appropriate operating mode for the wellbore to optimize a selected production criterion to suit measured wellbore parameters. The operating mode either a continuous clean-out mode, in which gas is continuously injected into the wellbore to control liquid loading, or an intermittent clean-out, in which liquid loading is regulated by intermittent gas injection. In preferred embodiments, the system uses bladder-type control valves having upstream and downstream solenoids, to control production tubing flow rate within a range between upper and lower set points.
    Type: Application
    Filed: September 8, 2010
    Publication date: January 6, 2011
    Inventors: Glenn WILDE, Dennis JONK