Patents by Inventor Eric Sebellin

Eric Sebellin has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11945549
    Abstract: A method for installing a TLP based floating object at anchor points. The floating object includes a central body and buoyancy assemblies positioned around the central body in a horizontal plane, with each buoyancy assembly connected to the central body and connectable to one of the anchor points. The method includes: attaching a mooring leg including a mooring line at each anchor point; for each anchor point connecting a pull-down line between the buoyancy assembly and the anchor point; tensioning the pull-down lines so the floating object is lowered to an installation level below an operational level; for each anchor point connecting the mooring leg with the buoyancy assembly in slack mode; and after connecting the mooring lines with the buoyancy assemblies, paying out the pull-down lines so the floating object rises upward from the installation level to the operational level where the mooring legs are tensioned.
    Type: Grant
    Filed: August 19, 2020
    Date of Patent: April 2, 2024
    Assignee: SINGLE BUOY MOORINGS INC.
    Inventors: Julien Liegard, Eric Sebellin
  • Publication number: 20220297802
    Abstract: A method for installing a TLP based floating object at anchor points. The floating object includes a central body and buoyancy assemblies positioned around the central body in a horizontal plane, with each buoyancy assembly connected to the central body and connectable to one of the anchor points. The method includes: attaching a mooring leg including a mooring line at each anchor point; for each anchor point connecting a pull-down line between the buoyancy assembly and the anchor point; tensioning the pull-down lines so the floating object is lowered to an installation level below an operational level; for each anchor point connecting the mooring leg with the buoyancy assembly in slack mode; and after connecting the mooring lines with the buoyancy assemblies, paying out the pull-down lines so the floating object rises upward from the installation level to the operational level where the mooring legs are tensioned.
    Type: Application
    Filed: August 19, 2020
    Publication date: September 22, 2022
    Inventors: Julien LIEGARD, Eric SEBELLIN
  • Patent number: 8894326
    Abstract: Offshore deployment device for an installation vessel (4) with a deck (5) to deploy a hydrocarbon transfer pipe (2) composed of several pipe segments (3), the device including a trolley hoist lifting element (10), installed in a tower (6) to lift a pipe segment from an horizontal position into a vertical position, an assembly platform (8), where a segment is connected to a previously launched transfer pipe string, the assembly platform being provided with a clamping device that is supported on the installation vessel and adapted to support the weight of the previously launched pipe string during assembling, wherein the hydrocarbon transfer pipe is a flexible hose string composed of several flexible hose segments, the flexible hose string being guided from a vertical position into an inclined or a horizontal position via a hose string guide element (15) which is placed under the assembly platform.
    Type: Grant
    Filed: September 24, 2010
    Date of Patent: November 25, 2014
    Assignee: Single Buoy Moorings Inc.
    Inventors: Liva Christian Randrianarivony, Florian Couget, Pieter Liem, Eric Sebellin
  • Publication number: 20120183357
    Abstract: Offshore deployment device for an installation vessel with a deck to deploy a hydrocarbon transfer pipe composed of several pipe segments, the device comprising a trolley hoist lifting means, installed in a tower to lift a pipe segment from an horizontal position into a vertical position, an assembly platform, where a segment is connected to a previously launched transfer pipe string, the assembly platform being provided with a clamping device that is supported on the installation vessel and adapted to support the weight of the previously launched pipe string during assembling, characterized in that the hydrocarbon transfer pipe is a flexible hose string composed of several flexible hose segments, the flexible hose string being guided from a vertical position into an inclined or a horizontal position via a hose string guide element which is placed under the assembly platform.
    Type: Application
    Filed: September 24, 2010
    Publication date: July 19, 2012
    Applicant: SINGLE BUOY MOORINGS INC.
    Inventors: Liva Christian Randrianarivony, Florian Couget, Pieter Liem, Eric Sebellin
  • Patent number: 7509919
    Abstract: An installation vessel has upper and lower decks (40, 50) that are vertically spaced about 3 meters apart, with most of the lower deck covered by the upper one, but with a rear portion (60) of the lower deck being uncovered. The upper deck is used primarily for storage, while the lower deck is the one used for installation of anchor chains, wires, ropes, etc. that pass from a winch (81) to a stern roller (84) at the rear of the lower deck, so dangerous conditions of chains, wires, ropes, etc. moving along a deck during installation are confined to the lower deck. A main crane (72) that lies on one side of the vessel, lies forward of the rear end of the upper deck at a location wherein the crane can reach all portions of the uncovered lower deck portion and most of the upper deck.
    Type: Grant
    Filed: February 7, 2007
    Date of Patent: March 31, 2009
    Assignee: Single Buoy Moorings, Inc.
    Inventor: Eric Sebellin
  • Publication number: 20070193496
    Abstract: An installation vessel has upper and lower decks (40, 50) that are vertically spaced about 3 meters apart, with most of the lower deck covered by the upper one, but with a rear portion (60) of the lower deck being uncovered. The upper deck is used primarily for storage, while the lower deck is the one used for installation of anchor chains, wires, ropes, etc. that pass from a winch (81) to a stern roller (84) at the rear of the lower deck, so dangerous conditions of chains, wires, ropes, etc. moving along a deck during installation are confined to the lower deck. A main crane (72) that lies on one side of the vessel, lies forward of the rear end of the upper deck at a location wherein the crane can reach all portions of the uncovered lower deck portion and most of the upper deck.
    Type: Application
    Filed: February 7, 2007
    Publication date: August 23, 2007
    Inventor: Eric Sebellin