Patents by Inventor Erik J. Reissig

Erik J. Reissig has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11613987
    Abstract: A method for evaluating the potential effectiveness of refracking a previously fracked oil/gas well is accomplished by isolating a plurality of previously fracked zones of an oil/gas well in a formation and measuring the fluid flow rates from the isolated zones using a three phase flow meter positioned within the well at or near the previously fracked zones. The zones may be isolated by an isolation assembly which includes two packers connected by a perforated pipe and attached to a tubular positioned within the well.
    Type: Grant
    Filed: August 3, 2021
    Date of Patent: March 28, 2023
    Assignee: Tech Flo Consulting, LLC
    Inventors: William J. Jackson, Erik J. Reissig, James L. Miller, II
  • Publication number: 20210363877
    Abstract: A method for evaluating the potential effectiveness of refracing a previously fracked oil/gas well is accomplished by isolating a plurality of previously fracked zones of an oil/gas well in a formation and measuring the fluid flow rates from the isolated zones using a three phase flow meter positioned within the well at or near the previously fracked zones. The zones may be isolated by an isolation assembly which includes two packers connected by a perforated pipe and attached to a tubular positioned within the well.
    Type: Application
    Filed: August 3, 2021
    Publication date: November 25, 2021
    Applicant: Tech Flo Consulting, LLC
    Inventors: William J. Jackson, Erik J. Reissig, James L. Miller, II
  • Patent number: 11078778
    Abstract: A method for evaluating the potential effectiveness of refracing a previously fracked oil/gas well is accomplished by isolating a plurality of previously fracked zones of an oil/gas well in a formation and measuring the fluid flow rates from the isolated zones using a three phase flow meter positioned within the well at or near the previously fracked zones. The zones may be isolated by an isolation assembly which includes two packers connected by a perforated pipe and attached to a tubular positioned within the well.
    Type: Grant
    Filed: March 15, 2019
    Date of Patent: August 3, 2021
    Assignee: Tech-Flo Consulting, LLC
    Inventors: William J. Jackson, Erik J. Reissig, James L. Miller, II
  • Publication number: 20190211668
    Abstract: A method for evaluating the potential effectiveness of refracing a previously fracked oil/gas well is accomplished by isolating a plurality of previously fracked zones of an oil/gas well in a formation and measuring the fluid flow rates from the isolated zones using a three phase flow meter positioned within the well at or near the previously fracked zones. The zones may be isolated by an isolation assembly which includes two packers connected by a perforated pipe and attached to a tubular positioned within the well.
    Type: Application
    Filed: March 15, 2019
    Publication date: July 11, 2019
    Applicant: Tech Flo Consulting, LLC
    Inventors: William J. Jackson, Erik J. Reissig, James L. Miller, II
  • Publication number: 20180328169
    Abstract: A method for evaluating the potential effectiveness of refracing a previously fracked oil/gas well is accomplished by isolating a plurality of previously fracked zones of an oil/gas well in a formation and measuring the fluid flow rates from the isolated zones using a three phase flow meter positioned within the well at or near the previously fracked zones. The zones may be isolated by an isolation assembly which includes two packers connected by a perforated pipe and attached to a tubular positioned within the well.
    Type: Application
    Filed: July 24, 2018
    Publication date: November 15, 2018
    Applicant: Tech Flo Consulting, LLC
    Inventors: William J. Jackson, Erik J. Reissig, James L. Miller, II
  • Patent number: 10000983
    Abstract: A jet pump assembly is adapted to be releasably attached to a tubular member of a tubular string in an oil well. The jet pump may be pumped out of the tubular string to the surface by a reverse flow of power fluid down the well between the tubular string and the casing of the well. Consequently the jet pump may be serviced or reconfigured to a direct pumping mode without the necessity of a wire line or other apparatus. A sensor for measuring downhole parameters such as temperature and pressure etc. is positioned within a cavity located in a lower portion of the jet pump so as to be removable from the well with the pump.
    Type: Grant
    Filed: December 29, 2015
    Date of Patent: June 19, 2018
    Assignee: Tech-Flo Consulting, LLC
    Inventors: William J. Jackson, Erik J. Reissig
  • Publication number: 20170247962
    Abstract: A jet pump assembly is adapted to be releasably attached to a tubular member of a tubular string in an oil well. The jet pump may be pumped out of the tubular string to the surface by a reverse flow of power fluid down the well between the tubular string and the casing of the well. Consequently the jet pump may be serviced or reconfigured to a direct pumping mode without the necessity of a wire line or other apparatus. An attachment tool is provided that attaches to a fishing neck on the jet pump and also includes a plurality of seal cups. The attachment tool includes a rod which is adapted to release a locking mechanism positioned in the jet pump.
    Type: Application
    Filed: May 16, 2017
    Publication date: August 31, 2017
    Applicant: Tech-Flo Consulting, LLC
    Inventors: William J. Jackson, Erik J. Reissig
  • Publication number: 20170051605
    Abstract: A method for evaluating the potential effectiveness of refracing a previously fracked oil/gas well is accomplished by isolating a plurality of previously fracked zones of an oil/gas well in a formation and measuring the fluid flow rates from the isolated zones using a three phase flow meter positioned within the well at or near the previously fracked zones. The zones may be isolated by an isolation assembly which includes two packers connected by a perforated pipe and attached to a tubular positioned within the well.
    Type: Application
    Filed: August 18, 2015
    Publication date: February 23, 2017
    Inventors: William J. Jackson, Erik J. Reissig, James L. Miller, II
  • Publication number: 20160130894
    Abstract: A jet pump assembly is adapted to be releasably attached to a tubular member of a tubular string in an oil well. The jet pump may be pumped out of the tubular string to the surface by a reverse flow of power fluid down the well between the tubular string and the casing of the well. Consequently the jet pump may be serviced or reconfigured to a direct pumping mode without the necessity of a wire line or other apparatus. A sensor for measuring downhole parameters such as temperature and pressure etc. is positioned within a cavity located in a lower portion of the jet pump so as to be removable from the well with the pump.
    Type: Application
    Filed: December 29, 2015
    Publication date: May 12, 2016
    Inventors: William J. Jackson, Erik J. Reissig