Patents by Inventor Eugene A. Post

Eugene A. Post has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 8555653
    Abstract: Embodiments of the present invention employ a closed loop controls philosophy, which actively controls the starting means of a powerplant machine, throughout the start-up process. Here, the present invention may provide a method for adjusting a nominal operating schedule of the starting means, which may have the form of a Load Commutated Inverter (LCI). Embodiments of the method may adjust the nominal operating schedule based, in part, on an operating parameter, which is associated with the gas turbine 100. The operating parameter may include, but is not limited to: a rotor speed, a desired start-up time, or the like. Here, the control system may receive data on the operating parameter associated with the gas turbine.
    Type: Grant
    Filed: December 23, 2009
    Date of Patent: October 15, 2013
    Assignee: General Electric Company
    Inventors: David A. Snider, William F. Seely, John C. Maters, Eugene A. Post, Samuel B. Shartzer
  • Publication number: 20110146293
    Abstract: An embodiment of the present invention provides a method of starting a powerplant machine, such as, but not limiting of, a turbomachine set to operate in a Fast Start mode. The turbomachine may include, but is not limited to, a steam turbine, a heavy-duty gas turbine, an aero-derivative gas turbine, and the like. An embodiment of the method of the present invention provides a new philosophy for controlling a starting system associated with the turbomachine. An embodiment of the present invention may be applied to a powerplant having multiple turbomachines and a starting system having multiple starting means, which may include at least one LCI system. Here, an embodiment of the present invention may eliminate the manual process of preparing and integrating a desired turbomachine with a desired starting means.
    Type: Application
    Filed: December 23, 2009
    Publication date: June 23, 2011
    Inventors: Samuel B. Shartzer, Jason D. Fuller, David A. Snider, Eugene A. Post
  • Publication number: 20110146291
    Abstract: Embodiments of the present invention employ a closed loop controls philosophy, which actively controls the starting means of a powerplant machine, throughout the start-up process. Here, the present invention may provide a method for adjusting a nominal operating schedule of the starting means, which may have the form of a Load Commutated Inverter (LCI). Embodiments of the method may adjust the nominal operating schedule based, in part, on an operating parameter, which is associated with the gas turbine 100. The operating parameter may include, but is not limited to: a rotor speed, a desired start-up time, or the like. Here, the control system may receive data on the operating parameter associated with the gas turbine.
    Type: Application
    Filed: December 23, 2009
    Publication date: June 23, 2011
    Inventors: David A. Snider, William F. Seely, John C. Maters, Eugene A. Post, Samuel B. Shartzer