Patents by Inventor Evgeny Pavlovich KORELSKIY

Evgeny Pavlovich KORELSKIY has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11091994
    Abstract: A horizontal well may be refractured or reactivated by generating a geomechanical model to estimate the stress level in the formation; identifying zones with high, medium, and low stress levels in the formation; isolating existing fractures in the horizontal well; injecting a fracturing fluid into the well to create at least one new fracture in a zone with a low stress level and packing the created fracture with proppant to increase the stress level in the zone; isolating the at least one newly created fracture; initiating refracturing in the zone with the high and/or medium stress level; identifying a location of the refracturing crack in the zone with the high and/or medium stress level; and developing the refracturing crack and packing it with proppant.
    Type: Grant
    Filed: February 8, 2017
    Date of Patent: August 17, 2021
    Assignee: Schlumberger Technology Corporation
    Inventors: Sergey Dmitrievich Parkhonyuk, Evgeny Pavlovich Korelskiy, Kreso Kurt Butula, Andrey Sergeevich Konchenko, Valeriy Anatolievich Pavlov
  • Publication number: 20200024937
    Abstract: A method of refracturing in a horizontal well may comprise: generating a geomechanical model to estimate the stress level in the formation; identifying zones with high, medium, and low stress levels in the formation around the well based on the generated geomechanical model of the formation; isolating existing fractures in the horizontal well; injecting a fracturing fluid into the well to create at least one fracture in a zone with a low stress level and packing the created fracture with proppant to increase the stress level in the zone; isolating at least one fracture created at stage (d); initiating refracturing in the zone with the high and/or medium stress level identified at stage (b); identifying the location of the refracturing crack relative to the zones of high, medium, and low stress levels in the formation around the well; developing the refracturing crack and packing it with proppant. A method of reactivating an injection horizontal well is also provided.
    Type: Application
    Filed: February 8, 2017
    Publication date: January 23, 2020
    Inventors: Sergey Dmitrievich PARKHONYUK, Evgeny Pavlovich KORELSKIY, Kreso Kurt BUTULA, Andrey Sergeevich KONCHENKO, Valeriy Anatolievich PAVLOV