  • Patent number: 10879700
    Abstract: The disclosure relates to a method and an assembly for load management of electrical components of a local electrical system connected to a superordinate grid via a common grid connection point. A superordinate server creates a schedule for the controlling electrical components and, if possible, transmits the schedule to a local control unit. The local control unit implements the schedule received or, if a current schedule is not available, implements a standard schedule. The grid connection point is monitored to ensure that the power does not exceed a specified power limit value. If this is the case, the schedule currently being used to control the components is modified according to a specified scheme. If the power limit value is not adhered to within a predetermined time, a monitoring device switches off the power connection of individual components in accordance with a specified scheme.
    Type: Grant
    Filed: February 5, 2019
    Date of Patent: December 29, 2020
    Assignee: beegy GmbH
    Inventors: Johanna Schneider, Fabian Arlt
  • Publication number: 20200161861
    Abstract: The disclosure relates to a method and an assembly for load management of electrical components of a local electrical system connected to a superordinate grid via a common grid connection point. A superordinate server creates a schedule for the controlling electrical components and, if possible, transmits the schedule to a local control unit. The local control unit implements the schedule received or, if a current schedule is not available, implements a standard schedule. The grid connection point is monitored to ensure that the power does not exceed a specified power limit value. If this is the case, the schedule currently being used to control the components is modified according to a specified scheme. If the power limit value is not adhered to within a predetermined time, a monitoring device switches off the power connection of individual components in accordance with a specified scheme.
    Type: Application
    Filed: February 5, 2019
    Publication date: May 21, 2020
    Inventors: Johanna Schneider, Fabian Arlt