Patents by Inventor Fanlu MIN

Fanlu MIN has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10017911
    Abstract: The invention relates to a MSW (municipal solid waste) landfill barrier system capable of prolonging breakthrough time of leachate and a manufacturing method thereof. The system comprises a leachate collection and removal layer, a first HDPE (high-density polyethylene) geomembrane infiltration proof layer (2), a clay liner (5) and a groundwater collection and removal layer (6) which are sequentially stacked from top to bottom. The clay liner (5) is composed of a lower clay liner (51), a middle clay liner (52) and an upper clay liner (53) which are sequentially arranged, wherein the middle clay liner (52) is filled with a medium-fine sand layer (7) laid with sands of particle sizes ranging from 0.1 mm to 0.5 mm and of water content ?3%, wherein the saturated hydraulic conductivity of the medium-fine sand layer (7) varies from 1×10?5 to 1×10?3. A method of manufacturing the MSW landfill barrier system capable of prolonging breakthrough time of leachate is also provided.
    Type: Grant
    Filed: January 4, 2016
    Date of Patent: July 10, 2018
    Assignee: HOHAI UNIVERSITY
    Inventors: Wei Zhu, Shi Shu, Shengwei Wang, Haoqing Xu, Xihui Fan, Jianping Bao, Fanlu Min
  • Publication number: 20180016766
    Abstract: The invention relates to a MSW landfill barrier system capable of prolonging breakthrough time of leachate and a manufacturing method thereof. The system comprises a leachate collection and removal layer, a first HDPE (high-density polyethylene) geomembrane infiltration proof layer (2), a clay liner (5) and a groundwater collection and removal layer (6) which are sequentially stacked from top to bottom. The clay liner (5) is composed of a lower clay liner (51), a middle clay liner (52) and an upper clay liner (53) which are sequentially arranged, wherein the middle clay liner (52) is filled with a medium-fine sand layer (7) laid with sands of particle sizes ranging from 0.1 mm to 0.5 mm and of water content ?3%, wherein the saturated hydraulic conductivity of the medium-fine sand layer (7) varies from 1×10?5 to 1×10?3. A method of manufacturing the MSW landfill barrier system capable of prolonging breakthrough time of leachate is also provided.
    Type: Application
    Filed: January 4, 2016
    Publication date: January 18, 2018
    Applicant: HOHAI UNIVERSITY
    Inventors: Wei ZHU, Shi SHU, Shengwei WANG, Haoqing XU, Xihui FAN, Jianping BAO, Fanlu MIN