Patents by Inventor Garabed Yeriazarian

Garabed Yeriazarian has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9482077
    Abstract: In one aspect, a method is provided for controlling fluid flow in a wellbore containing a plurality of production devices, wherein the method includes the steps of defining a first setting of each production device in the plurality of production devices, defining a change in a parameter relating to fluid flow in the wellbore and using a model to determine a second setting for at least one of the plurality of production devices based on the change in the parameter. The method also includes the step of generating a script corresponding to the second setting, wherein the script is configured to be implemented without modification, and storing the script in a suitable storage medium.
    Type: Grant
    Filed: September 22, 2009
    Date of Patent: November 1, 2016
    Assignee: BAKER HUGHES INCORPORATED
    Inventors: Garabed Yeriazarian, Chee M. Chok
  • Patent number: 8682589
    Abstract: A system and method for supplying an additive into a well is disclosed that includes estimating injection rates for the additives and setting of one or more fluid flow control devices in the well based on a computer model. It is emphasized that this abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure. It is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims.
    Type: Grant
    Filed: May 31, 2007
    Date of Patent: March 25, 2014
    Assignee: Baker Hughes Incorporated
    Inventors: Brian L. Thigpen, C. Mitch Means, Guy P. Vachon, Garabed Yeriazarian, Jaedong Lee, Chee M. Chok, Clark Sann, Xin Liu
  • Publication number: 20110184534
    Abstract: A method of configuring communications between a computing device includes coupling the one or more SIE units to a communication link; receiving at the computing device an indication that the one or more SIE units are coupled to the communication link; selecting one or more of the one or more SIE units for connection; and transmitting an internet protocol address to the selected SIE units.
    Type: Application
    Filed: January 27, 2010
    Publication date: July 28, 2011
    Applicant: BAKER HUGHES INCORPORATED
    Inventors: GARABED YERIAZARIAN, MOHAMMAD REHAN SIDDIQUI, EN PENG
  • Publication number: 20110067882
    Abstract: In one aspect, a method is provided for producing fluid from a well formed in a formation including the step of generating a visual display depicting a depth-based layout of a plurality of production devices, a first setting of each production device and values for at least one production parameter, wherein the visual display enables an operator to graphically input a desired value for the at least one production parameter at a selected depth of the well. The method also includes determining a second setting for at least one production device utilizing a model and the desired value, wherein the second setting is expected to provide the desired value for the at least one production parameter the second setting is implemented.
    Type: Application
    Filed: September 22, 2009
    Publication date: March 24, 2011
    Applicant: BAKER HUGHES INCORPORATED
    Inventors: Garabed Yeriazarian, Chee M. Chok, Ricardo A. Tirado, Jesse J. Constantine, Darin H. Duphorne
  • Publication number: 20110071810
    Abstract: In one aspect, a method is provided for controlling fluid flow in a wellbore containing a plurality of production devices, wherein the method includes the steps of defining a first setting of each production device in the plurality of production devices, defining a change in a parameter relating to fluid flow in the wellbore and using a model to determine a second setting for at least one of the plurality of production devices based on the change in the parameter. The method also includes the step of generating a script corresponding to the second setting, wherein the script is configured to be implemented without modification, and storing the script in a suitable storage medium.
    Type: Application
    Filed: September 22, 2009
    Publication date: March 24, 2011
    Applicant: BAKER HUGHES INCORPORATED
    Inventors: Garabed Yeriazarian, Chee M. Chok
  • Patent number: 7805248
    Abstract: A system and method is provided for estimating an occurrence of a water breakthrough in a production well that includes estimating, at least periodically, a measure of water in the fluid produced from one or more production zones and estimating the occurrence of the water breakthrough utilizing at least in part a trend of the estimated measures of the produced fluid. A controller determines one or more actions to be taken to mitigate an effect of the water breakthrough and may automatically initiate one or more such actions.
    Type: Grant
    Filed: April 19, 2007
    Date of Patent: September 28, 2010
    Assignee: Baker Hughes Incorporated
    Inventors: Brian L. Thigpen, Guy P. Vachon, Garabed Yeriazarian, Jaedong Lee, Chee M. Chok, Clark Sann, Xin Liu
  • Patent number: 7711486
    Abstract: A system and method for producing fluid from a completed well is provided wherein the method in one aspect includes determining a first setting of at least one first device under use for producing the fluid from the well; selecting a first set of input parameters that includes at least one parameter relating to health of at least one second device and a plurality of parameters selected from a group consisting of information relating to flow rate, pressure, temperature, presence of a selected chemical, water content, sand content, and chemical injection rate; and using the selected first set of parameters as an input to a computer model, determining a second setting for the at least one first device that will provide at least one of an increased life of at least one second device and enhanced flow rate for the fluid from the completed well.
    Type: Grant
    Filed: April 19, 2007
    Date of Patent: May 4, 2010
    Assignee: Baker Hughes Incorporated
    Inventors: Brian L. Thigpen, Guy P. Vachon, Garabed Yeriazarian, Jaedong Lee, Chee M. Chok, Clark Sann, Xin Liu
  • Publication number: 20080262735
    Abstract: A system and method for estimating an occurrence of a water breakthrough in a production well is provided that includes estimating, at least periodically, a measure of water in the fluid produced from one or more production zones and estimating the occurrence of the water breakthrough utilizing at least in part a trend of the estimated measures of the produced fluid. A controller determines one or more actions to be taken to mitigate an effect of the water breakthrough and may automatically initiate one or more such actions. It is emphasized that this abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure. It is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims.
    Type: Application
    Filed: April 19, 2007
    Publication date: October 23, 2008
    Applicant: BAKER HUGHES INCORPORATED
    Inventors: Brian L. Thigpen, Guy P. Vachon, Garabed Yeriazarian, Jaedong Lee, Chee M. Chok, Clark Sann, Xin Liu
  • Publication number: 20080262736
    Abstract: A system and method for producing fluid from a completed well is provided wherein the method in one aspect includes determining a first setting of at least one first device under use for producing the fluid from the well; selecting a first set of input parameters that includes at least one parameter relating to health of at least one second device and a plurality of parameters selected from a group consisting of information relating to flow rate, pressure, temperature, presence of a selected chemical, water content, sand content, and chemical injection rate; and using the selected first set of parameters as an input to a computer model, determining a second setting for the at least one first device that will provide at least one of an increased life of at least one second device and enhanced flow rate for the fluid from the completed well.
    Type: Application
    Filed: April 19, 2007
    Publication date: October 23, 2008
    Applicant: BAKER HUGHES INCORPORATED
    Inventors: Brian L. Thigpen, Guy P. Vachon, Garabed Yeriazarian, Jaedong Lee, Chee M. Chok, Clark Sann, Xin Liu
  • Publication number: 20080257544
    Abstract: A system and method for managing a production from a wellbore that includes taking measurements relating to one or more selected parameters for each of the production zones over a time period and determining the occurrence of the cross flow in the wellbore using a trend of the one or more of the measurements. The system includes a processor that receives information relating to the measurements made over time relating to the selected parameters, wherein the processor determines or predicts the occurrence of the cross flow from a trend of at least one of the measurements.
    Type: Application
    Filed: April 20, 2007
    Publication date: October 23, 2008
    Applicant: BAKER HUGHES INCORPORATED
    Inventors: Brian L. Thigpen, Guy P. Vachon, Garabed Yeriazarian, Jaedong Lee, Chee M. Chok, Clark Sann, Xin Liu
  • Publication number: 20080262737
    Abstract: A system and method for obtaining enhanced production from a well is provided. The system includes a processor that processes instructions contained in a computer program, which includes instructions to monitor actual flow rate of the fluid from each production zone of a well over a time period corresponding to a first setting of the flow control devices and to employ a nodal analysis on a plurality of inputs from downhole sensor measurements, surface sensor measurements, one or more current positions of the devices to determine one or more new settings that will provide enhanced production from the well.
    Type: Application
    Filed: April 19, 2007
    Publication date: October 23, 2008
    Applicant: BAKER HUGHES INCORPORATED
    Inventors: Brian L. Thigpen, Guy P. Vachon, Garabed Yeriazarian, Jaedong Lee, Chee M. Chok, Clark Sann, Xin Liu
  • Publication number: 20070289740
    Abstract: A system and method for supplying an additive into a well is disclosed that includes estimating injection rates for the additives and setting of one or more fluid flow control devices in the well based on a computer model. It is emphasized that this abstract is provided to comply with the rules requiring an abstract which will allow a searcher or other reader to quickly ascertain the subject matter of the technical disclosure. It is submitted with the understanding that it will not be used to interpret or limit the scope or meaning of the claims.
    Type: Application
    Filed: May 31, 2007
    Publication date: December 20, 2007
    Applicant: BAKER HUGHES INCORPORATED
    Inventors: Brian Thigpen, C. Means, Guy Vachon, Garabed Yeriazarian, Jaedong Lee, Chee Chok, Clark Sann, Xin Liu