Patents by Inventor Grégoire PICHENOT

Grégoire PICHENOT has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11336093
    Abstract: A method for determining a sequence of operation of at least one set of generator units of an electrical network includes assigning a rank to each generator unit; from a projected load curve, determining a minimum number of generator units; for each generator unit having a rank less than or equal to the minimum number of generator units, allocating in the sequence of operation the on state to the generator unit for each time interval; for each generator unit having a rank greater than the minimum number of generator units, allocating, by increasing rank, for each time interval of the sequence of operation the on state or the off state to the generator unit, and for each generator unit to which is assigned the on state at a given time interval of the sequence of operation, allocating an operating power, by optimisation of a cost function over a period.
    Type: Grant
    Filed: December 18, 2020
    Date of Patent: May 17, 2022
    Assignee: COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
    Inventors: Duy Long Ha, Grégoire Pichenot
  • Publication number: 20210194243
    Abstract: A method for determining a sequence of operation of at least one set of generator units of an electrical network includes assigning a rank to each generator unit; from a projected load curve, determining a minimum number of generator units; for each generator unit having a rank less than or equal to the minimum number of generator units, allocating in the sequence of operation the on state to the generator unit for each time interval; for each generator unit having a rank greater than the minimum number of generator units, allocating, by increasing rank, for each time interval of the sequence of operation the on state or the off state to the generator unit, and for each generator unit to which is assigned the on state at a given time interval of the sequence of operation, allocating an operating power, by optimisation of a cost function over a period.
    Type: Application
    Filed: December 18, 2020
    Publication date: June 24, 2021
    Inventors: Duy Long HA, Grégoire PICHENOT