Patents by Inventor Grant Hocking

Grant Hocking has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 7870904
    Abstract: A method and apparatus for enhanced recovery of petroleum fluids from the subsurface by injection of a steam and hydrocarbon vaporized solvent in contact with the oil sand formation and the heavy oil and bitumen in situ. Multiple propped hydraulic fractures are constructed from the well bore into the oil sand formation and filled with a highly permeable proppant. Steam, a hydrocarbon solvent, and a non-condensing diluent gas are injected into the propped fractures, and flows upwards and outwards to contact and heat the in situ bitumen, which softens and flows by gravity to the well bore, and is pumped to the surface where the solvent can be recycled for further injection.
    Type: Grant
    Filed: February 12, 2009
    Date of Patent: January 18, 2011
    Assignee: GeoSierra LLC
    Inventor: Grant Hocking
  • Patent number: 7866395
    Abstract: A method and apparatus for initiating and propagating a vertical hydraulic fracture in unconsolidated and weakly cemented sediments from a single bore hole to control the fracture initiation plane and propagation of the hydraulic fracture, enabling greater yield and recovery of petroleum fluids from the formation. An injection casing with multiple fracture initiation sections is inserted and grouted into a bore hole. A foam fracture fluid carrying a proppant is injected into the injection casing and opens the fracture initiation sections to dilate the formation in a direction orthogonal to the required fracture azimuth plane. Propagation of the fracture is controlled by limiting the fracture fluid form to that of a stable foam fracturing fluid during the fracturing process. The injection casing initiation section remains open after fracturing providing direct hydraulic connection between the production well bore, the permeable proppant filled fracture and the formation.
    Type: Grant
    Filed: March 15, 2007
    Date of Patent: January 11, 2011
    Assignee: GeoSierra LLC
    Inventor: Grant Hocking
  • Patent number: 7832477
    Abstract: Casing deformation and control for inclusion propagation in earth formations. A method of forming at least one inclusion in a subterranean formation includes the steps of: installing a liner within a casing section in a wellbore intersecting the formation; and expanding the liner and the casing section, thereby applying an increased compressive stress to the formation. Another method of forming the inclusion includes the steps of: installing an expansion control device on a casing section, the device including at least one latch member; expanding the casing section radially outward in a wellbore, the expanding step including widening at least one opening in a sidewall of the casing section, and displacing the latch member in one direction; and preventing a narrowing of the opening after the expanding step, the latch member resisting displacement thereof in an opposite direction.
    Type: Grant
    Filed: December 28, 2007
    Date of Patent: November 16, 2010
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Travis W. Cavender, Roger L. Schultz, Grant Hocking, Robert Pipkin
  • Publication number: 20100276147
    Abstract: The present invention involves a method and apparatus for enhanced recovery of petroleum fluids from the subsurface by injection of a steam and hydrocarbon vaporized solvent in contact with the oil sand formation and the heavy oil and bitumen in situ. Multiple propped hydraulic fractures are constructed from the well bore into the oil sand formation and filled with a highly permeable proppant. Steam, a hydrocarbon solvent, and a non-condensing diluent gas are injected into the well bore and the propped fractures. The injected gas flows upwards and outwards in the propped fractures contacting the oil sands and in situ bitumen on the vertical faces of the propped fractures. The steam condenses on the cool bitumen and thus heats the bitumen by conduction, while the hydrocarbon solvent vapors diffuse into the bitumen from the vertical faces of the propped fractures.
    Type: Application
    Filed: February 12, 2009
    Publication date: November 4, 2010
    Inventor: Grant Hocking
  • Patent number: 7814978
    Abstract: Casing expansion and formation compression for permeability plane orientation. A method of forming at least one increased permeability plane in a subterranean formation includes the steps of: installing a casing section in a wellbore intersecting the formation; expanding the casing section in the wellbore; and then injecting a fluid into the formation, the injecting step being performed after the expanding step is completed. Another method includes the steps of: applying an increased compressive stress to the formation, the compressive stress being radially directed relative to a wellbore intersecting the formation; and then piercing the formation radially outward from the wellbore, thereby initiating the increased permeability plane.
    Type: Grant
    Filed: December 14, 2006
    Date of Patent: October 19, 2010
    Assignee: Halliburton Energy Services, Inc.
    Inventors: David J. Steele, Travis W. Cavender, Roger L. Schultz, John C. Gano, Grant Hocking
  • Publication number: 20100252261
    Abstract: Casing deformation and control for inclusion propagation in earth formations. A method of forming at least one inclusion in a subterranean formation includes the steps of: installing a liner within a casing section in a wellbore intersecting the formation; and expanding the liner and the casing section, thereby applying an increased compressive stress to the formation. Another method of forming the inclusion includes the steps of: installing an expansion control device on a casing section, the device including at least one latch member; expanding the casing section radially outward in a wellbore, the expanding step including widening at least one opening in a sidewall of the casing section, and displacing the latch member in one direction; and preventing a narrowing of the opening after the expanding step, the latch member resisting displacement thereof in an opposite direction.
    Type: Application
    Filed: June 9, 2010
    Publication date: October 7, 2010
    Applicant: HALLIBURTON ENERGY SERVICES, INC.
    Inventors: Travis W. CAVENDER, Roger L. SCHULTZ, Grant HOCKING, Robert PIPKIN
  • Patent number: 7757763
    Abstract: Casing deformation and control for inclusion propagation in earth formations. A method of forming at least one inclusion in a subterranean formation includes the steps of: installing a liner within a casing section in a wellbore intersecting the formation; and expanding the liner and the casing section, thereby applying an increased compressive stress to the formation. Another method of forming the inclusion includes the steps of: installing an expansion control device on a casing section, the device including at least one latch member; expanding the casing section radially outward in a wellbore, the expanding step including widening at least one opening in a sidewall of the casing section, and displacing the latch member in one direction; and preventing a narrowing of the opening after the expanding step, the latch member resisting displacement thereof in an opposite direction.
    Type: Grant
    Filed: December 28, 2007
    Date of Patent: July 20, 2010
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Travis W. Cavender, Roger L. Schultz, Grant Hocking, Robert Pipkin
  • Patent number: 7748458
    Abstract: A method and apparatus for initiating and propagating a vertical hydraulic fracture in unconsolidated and weakly cemented sediments from a single bore hole to control the fracture initiation plane and propagation of the hydraulic fracture, enabling greater yield and recovery of petroleum fluids from the formation. An injection casing with multiple fracture initiation sections is inserted and grouted into a bore hole. A fracture fluid carrying a proppant is injected into the injection casing and opens the fracture initiation sections to dilate the formation in a direction orthogonal to the required fracture azimuth plane. Propagation of the fracture is controlled by supplying fracture fluid independent to the two opposing wings of the hydraulic fracture. The injection casing initiation section remains open after fracturing providing direct hydraulic connection between the production well bore, the permeable proppant filled fracture and the formation.
    Type: Grant
    Filed: February 27, 2006
    Date of Patent: July 6, 2010
    Assignee: GeoSierra LLC
    Inventor: Grant Hocking
  • Publication number: 20100071900
    Abstract: Systems and methods for drainage of a heavy oil reservoir via a horizontal wellbore. A method of improving production of fluid from a subterranean formation includes the step of propagating a generally vertical inclusion into the formation from a generally horizontal wellbore intersecting the formation. The inclusion is propagated into a portion of the formation having a bulk modulus of less than approximately 750,000 psi. A well system includes a generally vertical inclusion propagated into a subterranean formation from a generally horizontal wellbore which intersects the formation. The formation comprises weakly cemented sediment.
    Type: Application
    Filed: November 24, 2009
    Publication date: March 25, 2010
    Applicant: HALLIBURTON ENERGY SERVICES, INC.
    Inventors: Travis W. CAVENDER, Grant HOCKING, Roger SCHULTZ
  • Patent number: 7647966
    Abstract: Systems and methods for drainage of a heavy oil reservoir via a horizontal wellbore. A method of improving production of fluid from a subterranean formation includes the step of propagating a generally vertical inclusion into the formation from a generally horizontal wellbore intersecting the formation. The inclusion is propagated into a portion of the formation having a bulk modulus of less than approximately 750,000 psi. A well system includes a generally vertical inclusion propagated into a subterranean formation from a generally horizontal wellbore which intersects the formation. The formation comprises weakly cemented sediment.
    Type: Grant
    Filed: August 1, 2007
    Date of Patent: January 19, 2010
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Travis W. Cavender, Grant Hocking, Roger Schultz
  • Patent number: 7640975
    Abstract: Flow control for increased permeability planes in unconsolidated formations. A well system includes a casing expansion device interconnected in a casing string for initiating an inclusion propagated into a formation surrounding the casing string. The device has at least one opening in a sidewall for fluid communication between the inclusion and an interior of the casing string. A flow control device is retrievably installed in the expansion device and controls flow between the formation and an interior of the casing string. A method of controlling flow of fluid between a formation and an interior of a casing string includes the steps of interconnecting a casing expansion device in the casing string; expanding the device to thereby initiate propagation of an inclusion into the formation; and installing a flow control device in the expansion device to thereby control flow between the inclusion and the casing string interior.
    Type: Grant
    Filed: August 1, 2007
    Date of Patent: January 5, 2010
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Travis W. Cavender, Grant Hocking, Roger L. Schultz
  • Patent number: 7640982
    Abstract: Initiation of injection planes in a well. A method of forming at least one generally planar inclusion in a subterranean formation includes the steps of: expanding a wellbore in the formation by injecting a material into an annulus positioned between the wellbore and a casing lining the wellbore; increasing compressive stress in the formation as a result of the expanding step; and then injecting a fluid into the formation, thereby forming the inclusion in a direction of the increased compressive stress. Another method includes the steps of: expanding a wellbore in the formation by injecting a material into an annulus positioned between the wellbore and a casing lining the wellbore; reducing stress in the formation in a tangential direction relative to the wellbore; and then injecting a fluid into the formation, thereby forming the inclusion in a direction normal to the reduced tangential stress.
    Type: Grant
    Filed: August 1, 2007
    Date of Patent: January 5, 2010
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Roger L. Schultz, Grant Hocking, Scott Wendorf, Travis W. Cavender
  • Patent number: 7604054
    Abstract: The present invention involves a method and apparatus for enhanced recovery of petroleum fluids from the subsurface by convective heating of the oil sand formation and the heavy oil and bitumen in situ by a downhole electric heater. Multiple propped vertical hydraulic fractures are constructed from the well bore into the oil sand formation and filled with a diluent. The heater and downhole pump force thermal convective flow of the heated diluent to flow upward and outward into the propped fractures and circulating back down and back towards the well bore heating the oil sands and in situ bitumen on the vertical faces of the propped fractures. The diluent now mixed with produced products from the oil sand re-enters the bottom of the well bore and passes over the heater element and is reheated to continue to flow in the convective cell. Thus the heating and diluting of the in place bitumen occurs predominantly circumferentially, i.e.
    Type: Grant
    Filed: January 23, 2007
    Date of Patent: October 20, 2009
    Assignee: GeoSierra LLC
    Inventor: Grant Hocking
  • Patent number: 7591306
    Abstract: The present invention involves a method and apparatus for enhanced recovery of petroleum fluids from the subsurface by injection of a steam and hydrocarbon vaporized solvent in contact with the oil sand formation and the heavy oil and bitumen in situ. Multiple propped hydraulic fractures are constructed from the well bore into the oil sand formation and filled with a highly permeable proppant. Steam, a hydrocarbon solvent, and a non-condensing diluent gas are injected into the well bore and the propped fractures. The injected gas flows upwards and outwards in the propped fractures contacting the oil sands and in situ bitumen on the vertical faces of the propped fractures. The steam condenses on the cool bitumen and thus heats the bitumen by conduction, while the hydrocarbon solvent vapors diffuse into the bitumen from the vertical faces of the propped fractures.
    Type: Grant
    Filed: January 23, 2007
    Date of Patent: September 22, 2009
    Assignee: Geosierra LLC
    Inventor: Grant Hocking
  • Publication number: 20090166040
    Abstract: Casing deformation and control for inclusion propagation in earth formations. A method of forming at least one inclusion in a subterranean formation includes the steps of: installing a liner within a casing section in a wellbore intersecting the formation; and expanding the liner and the casing section, thereby applying an increased compressive stress to the formation. Another method of forming the inclusion includes the steps of: installing an expansion control device on a casing section, the device including at least one latch member; expanding the casing section radially outward in a wellbore, the expanding step including widening at least one opening in a sidewall of the casing section, and displacing the latch member in one direction; and preventing a narrowing of the opening after the expanding step, the latch member resisting displacement thereof in an opposite direction.
    Type: Application
    Filed: December 28, 2007
    Publication date: July 2, 2009
    Applicant: Halliburton Energy Services, Inc.
    Inventors: Travis W. CAVENDER, Roger L. Schultz, Grant Hocking, Robert Pipkin
  • Publication number: 20090159277
    Abstract: The present invention is a method and apparatus for the enhanced recovery of petroleum fluids from the subsurface by in situ combustion of the hydrocarbon deposit, from injection of an oxygen rich gas and drawing off a flue gas to control the rate and propagation of the combustion front to be predominantly horizontal and propagating vertically downwards guided by the vertical highly permeable hydraulic fractures. Multiple propped vertical hydraulic fractures are constructed from the well bore into the oil sand formation and filled with a highly permeable proppant containing hydrodesulfurization and thermal cracking catalysts. The oxygen rich gas is injected via the well bore into the top of the propped fractures, the in situ hydrocarbons are ignited by a downhole burner, and the generated flue gas extracted from the bottom of the propped fractures through the well bore and mobile oil gravity drains through the propped fractures to the bottom of the well bore and pumped to the surface.
    Type: Application
    Filed: December 16, 2008
    Publication date: June 25, 2009
    Inventor: Grant Hocking
  • Publication number: 20090145606
    Abstract: The present invention involves a method and apparatus for enhanced recovery of petroleum fluids from the subsurface by injection of a steam and hydrocarbon vaporized solvent in contact with the oil sand formation and the heavy oil and bitumen in situ. Multiple propped hydraulic fractures are constructed from the well bore into the oil sand formation and filled with a highly permeable proppant. Steam, a hydrocarbon solvent, and a non-condensing diluent gas are injected into the well bore and the propped fractures. The injected gas flows upwards and outwards in the propped fractures contacting the oil sands and in situ bitumen on the vertical faces of the propped fractures. The steam condenses on the cool bitumen and thus heats the bitumen by conduction, while the hydrocarbon solvent vapors diffuse into the bitumen from the vertical faces of the propped fractures.
    Type: Application
    Filed: February 12, 2009
    Publication date: June 11, 2009
    Inventor: Grant Hocking
  • Publication number: 20090101347
    Abstract: Systems and methods for thermal recovery of shallow bitumen using increased permeability inclusions. A method of producing hydrocarbons from a subterranean formation includes the steps of: propagating at least one generally planar inclusion outward from a wellbore into the formation; injecting a fluid into the inclusion, thereby heating the hydrocarbons; and during the injecting step, producing the hydrocarbons from the wellbore. A well system includes at least one generally planar inclusion extending outward from a wellbore into a formation; a fluid injected into the inclusion, hydrocarbons being heated as a result of the injected fluid; and a tubular string through which the hydrocarbons are produced, the tubular string extending to a location in the wellbore below the inclusion, and the hydrocarbons being received into the tubular string at that location.
    Type: Application
    Filed: November 13, 2008
    Publication date: April 23, 2009
    Inventors: Roger L. SCHULTZ, Travis W. Cavender, Grant Hocking
  • Patent number: 7520325
    Abstract: The present invention is a method and apparatus for the enhanced recovery of petroleum fluids from the subsurface by in situ combustion of the hydrocarbon deposit, from injection of an oxygen rich gas and drawing off a flue gas to control the rate and propagation of the combustion front to be predominantly horizontal and propagating vertically downwards guided by the vertical highly permeable hydraulic fractures. Multiple propped vertical hydraulic fractures are constructed from the well bore into the oil sand formation and filled with a highly permeable proppant containing hydrodesulfurization and thermal cracking catalysts. The oxygen rich gas is injected via the well bore into the top of the propped fractures, the in situ hydrocarbons are ignited by a downhole burner, and the generated flue gas extracted from the bottom of the propped fractures through the well bore and mobile oil gravity drains through the propped fractures to the bottom of the well bore and pumped to the surface.
    Type: Grant
    Filed: January 23, 2007
    Date of Patent: April 21, 2009
    Assignee: GeoSierra LLC
    Inventor: Grant Hocking
  • Publication number: 20090032267
    Abstract: Flow control for increased permeability planes in unconsolidated formations. A well system includes a casing expansion device interconnected in a casing string for initiating an inclusion propagated into a formation surrounding the casing string. The device has at least one opening in a sidewall for fluid communication between the inclusion and an interior of the casing string. A flow control device is retrievably installed in the expansion device and controls flow between the formation and an interior of the casing string. A method of controlling flow of fluid between a formation and an interior of a casing string includes the steps of interconnecting a casing expansion device in the casing string; expanding the device to thereby initiate propagation of an inclusion into the formation; and installing a flow control device in the expansion device to thereby control flow between the inclusion and the casing string interior.
    Type: Application
    Filed: August 1, 2007
    Publication date: February 5, 2009
    Inventors: Travis W. Cavender, Grant Hocking, Roger Schultz