Patents by Inventor Guoping Guan

Guoping Guan has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 12223363
    Abstract: Techniques for managing resources of a virtualized system involve acquiring historical distribution data about a virtualized system, the historical distribution data indicating a historical distribution of resources occupied by workloads on a plurality of host machines of the virtualized system over a predetermined historical time period. The techniques further involve generating predicted distribution data based on the historical distribution data, the predicted distribution data indicating an estimated distribution of resources occupied by the workloads on the plurality of host machines over a predetermined future time period. The techniques further involve performing workload migration at least once based on the predicted distribution data, the workload migration including migrating a workload of a first host machine whose first estimated quantity of occupied resources exceeds a high threshold to a second host machine whose second estimated quantity of occupied resources is below a low threshold.
    Type: Grant
    Filed: December 10, 2021
    Date of Patent: February 11, 2025
    Assignee: EMC IP Holding Company LLC
    Inventors: Jie Huang, Guoping Guan, Yunyun Duan
  • Publication number: 20220391253
    Abstract: Techniques for managing resources of a virtualized system involve acquiring historical distribution data about a virtualized system, the historical distribution data indicating a historical distribution of resources occupied by workloads on a plurality of host machines of the virtualized system over a predetermined historical time period. The techniques further involve generating predicted distribution data based on the historical distribution data, the predicted distribution data indicating an estimated distribution of resources occupied by the workloads on the plurality of host machines over a predetermined future time period. The techniques further involve performing workload migration at least once based on the predicted distribution data, the workload migration including migrating a workload of a first host machine whose first estimated quantity of occupied resources exceeds a high threshold to a second host machine whose second estimated quantity of occupied resources is below a low threshold.
    Type: Application
    Filed: December 10, 2021
    Publication date: December 8, 2022
    Inventors: Jie Huang, Guoping Guan, Yunyun Duan