Patents by Inventor Hamoud Abdulrahman Alqahtani

Hamoud Abdulrahman Alqahtani has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11775705
    Abstract: A computer-based method for rapidly updating a history-matched reservoir simulation model selected from among a plurality of history-matched reservoir simulation models hosted on an information technology system. A software module configured to perform an update by parametrically varying the time over the selected update period and the position for each selected well model file and a corresponding well update file, replacing outdated well model file data with well update file data at each respective time and each respective position. The method is configured by selecting a reservoir simulation model for update, a petroleum field model to use, a reservoir model within the field, and one or more wells within the reservoir for the update. The well model files to be updated and the time interval over which the updates are to be made can be set by a user.
    Type: Grant
    Filed: April 23, 2020
    Date of Patent: October 3, 2023
    Assignee: SAUDI ARABIAN OIL COMPANY
    Inventors: Yousef Z. Taieb, Faisal Hammad H. AL Naseef, Hamoud Abdulrahman Alqahtani, Amell Ali Al-Ghamdi, Fouad F. Abouheit
  • Publication number: 20210334433
    Abstract: A computer-based method for rapidly updating a history-matched reservoir simulation model selected from among a plurality of history-matched reservoir simulation models hosted on an information technology system. A software module configured to perform an update by parametrically varying the time over the selected update period and the position for each selected well model file and a corresponding well update file, replacing outdated well model file data with well update file data at each respective time and each respective position. The method is configured by selecting a reservoir simulation model for update, a petroleum field model to use, a reservoir model within the field, and one or more wells within the reservoir for the update. The well model files to be updated and the time interval over which the updates are to be made can be set by a user.
    Type: Application
    Filed: April 23, 2020
    Publication date: October 28, 2021
    Inventors: Yousef Z. Taieb, Faisal Hammad H. AL Naseef, Hamoud Abdulrahman Alqahtani, Amell Ali Al-Ghamdi, Fouad F. Abouheit